Loading...
HomeMy WebLinkAboutFile Documents.134 E Bleeker St.0102-2020-BRES (10) 0102-2020-BRES HPC COMMENTS 01 1 (1) Page: 1 ALL EXTERIOR LIGHT FIXTURES NEED TO BE Author: sarahy P - Capture: No IDENTIFIED AND REVIEWED AND APPROVED BY STAFF AND MONITOR AS REQUIRED BY THE HPC CONDITIONS FOR APPROVAL(HPC RESOLUTION#11, SERIES OF 2020). A.1.02 - (P) SITE PLAN (1) Page: A.1.02-(P)SITE PLAN Author: sarahy LOCATION OF GATE DOES NOT LINE UP WITH r THE PROPOSED PATHWAY.Capture: No A.2.08 (2) m Page: A.2.08 PLANS INDICATE THIS AS THE DOOR AS THE Ih 7 Author: sarahy 1,�-�_;;. Capture: No MAIN ENTRANCE TO THE HOME. FRONT DOOR OF THE VICTORIAN IS NOT ------- - ; b!1:-- MAINTAINED AS THE FRONT ENTRY OF THE HOME. Page: A.2.08 roucti-r' Author: sarahy INTERIOR PROGRAMMING DOES NOT ! 7 I Capture: No MAINTAIN THE USE OF THE FRONT DOOR. DOES NOT MATCH THE APPROVALS SHOWN TO HPC. A.2.10 (4) ° Page: A.2.10 SNOW CLIPS ARE APPROPRIATE BUT FINAL Author: sarahy CONFIGURATION TO BE REVIEWED BY STAFF Capture: No AND MONITOR FOR APPROVAL. NUMBER OF I b b ROWS SHALL BE MINIMAL AND MUST NOT RUN UP THE ENTIRE LENGTH OF THE ROOF. Page: A.2.10 Author: sarahy ASPHALT SHINGLE ROOF ON HISTORIC Capture: No RESOURCES TO BE RESTORED TO WOOD SHINGLES. RIDGE FLASHING TO BE REMOVED AND NOT REPLACED UNLESS IT IS SUPPORTED BY HISTORIC DOCUMENTATION/EVIDENCE. Page: A.2.10 EXISTING PERPENDICULAR BARN HOIST Author: sarahy Capture: No FEATURE IS TO REMAIN. I 4 Page: A.2.10 Author: sarahy PROVIDE CUTSHEET FOR GUTTERS THAT o- Capture: No INCLUDE DETAILS SUCH AS MATERIAL AND STYLES. LOCATION OF DOWNSPOUTS ALSO ° � NEED TO BE REVIEWED AND APPROVED BY is � STAFF AND MONITOR. RECEIVED 03/26/2021 ASPEN BUILDING DEPARTMENT A.3.00 (1) Page:A.3.00 PERPENDICULAR BARN HOIST FEATURE IS q 4 P 4 Author: sarahy MISSING. EXISTING FEATURE TO REMAIN. Capture: No A.3.01 (2) Page:A.3.01 BUILDING HEIGHT, FOOTPRINT, AND Author: sarahy MASSING MUST NOT CHANGE FOLLOWING ° Capture: No Q 4 TEMPORARY RELOCATION OF THE EXISTING -- -7 ADDITION. IF ANY CHANGES OCCUR, APPROVALS FOR THE EXISTING ADDITION, INCLUDING SETBACK VARIATIONS,WILL NEED TO BE RE-GRANTED BY HPC, --___ Page:A.3.01 s�� 1 Author: sarahy CHANGES TO WINDOW CONFIGURATION NOT APPROVED. LOCATION OF OPENINGS TO Capture: No REMAIN AS EXISTING. A.3.02 (1) Page:A.3.02 PROVIDE CONDITIONS ASSESSMENT OF THE Author: sarahy EXISTING WINDOWS IN THE HISTORIC HOME o, ,Eo.®,n s Capture: No AND HISTORIC SECONDARY BARN STRUCTURE. IF WINDOWS ARE ORIGINAL, THEY MUST REMAIN AND BE REPAIRED. IF THEY ARE NOT ORIGINAL, PROVIDE CUT SHEETS OF PROPOSED REPLACEMENTS. A.3.03 (2) Page:A.3.03 STAFF AND MONITOR APPROVED Author: sarahy Capture: No FENESTRATION CHANGES THAT SHOW A A DESIGN WITH THINNER FRAMES AND MULLIONS.APPROVAL GRANTED ON 11/03/2020. IS THIS REPRESENTATION CORRECT? Page:A.3.03 ��—— Author: sarahy EXISTING PERPENDICULAR BARN HOIST Capture: No FEATURE TO REMAIN. A.6.00 (1) Page:A.6.00 WALL INSULATION WHERE HISTORIC I Author: sarahy FRAMING EXISTS NEEDS TO BE BATT - Capture: No INSULATION OR SIMILAR. SPRAY FOAM - An INSULATION ON HISTORIC FRAMING IS NOT PERMITTED. A.7.00 (1) Page:A.7.00 ° PLEASE CLARIFY THE MATERIAL OF THE E Author: sarahy APPROVED GARAGE DOOR TO BE MATCHING Capture: No WOOD SIDING AS REPRESENTED IN THE HPC pF im APPLICATION. RECEIVED 03/26/2021 ASPEN BUILDING DEPARTMENT A.7.04 (1) Page:Ar: 7.04 sarahy METAL ROOF RIDGE FLASHING Author: sarahy Capture: No UNLESS SUPPORTED BY HISTORICAL 1_ IDOCUMENTATION/EVIDENCE FOR THIS r PROPERTY. E1-3 (3) Page: E1-3 ALL EXTERIOR LIGHT FIXTURES NEED TO BE b b b b Author: sarahy IDENTIFIED AND REVIEWED AND APPROVED .,.-sWz• Capture: No BY STAFF AND MONITOR AS REQUIRED BY THE HPC CONDITIONS FOR APPROVAL(HPC RESOLUTION#11, SERIES OF 2020). — Page: E1-3 o- � Author: sarahy PROVIDE CUTSHEET FOR THIS LIGHT o-L. L ; Capture: No FIXTURE. TO BE REVIEWED FOR DESIGN COMPLIANCE BY STAFF AND MONITOR. LL Page: :E sa EXTERIOR LIGHTING IN THIS LOCATION WAS -3 Author: sarahy tgRatai Capture: No NOT APPROVED. PLEASE REVISE. E2-3 (1) Page: E2-3 Author: sarahy MOVE LOCATION OF MAIN PANEL TO ! ! 11 Capture: No NON-HISTORIC STRUCTURE. L7-02 (1) Page: L7-02 REVIEWED FOR Author: sarahy 02/13I COMPLI2021 AN2by Capture: No BY HPC L9-01 (1) Page: L9-01 PROVIDE MAXIMUM HEIGHT OF THE I.= Author: sarahy PROPOSED SHRUBS AND PERENNIALS. _ = w Capture: No RECEIVED 03/26/2021 ASPEN BUILDING DEPARTMENT