HomeMy WebLinkAboutFile Documents.134 E Bleeker St.0102-2020-BRES (21) ADDRESS: 134 E BLEEKER PERMIT NUMBER: 0102-2020-BRES I
COMMUNITY DEVELOPMENT DEPARTMENT �; 0
BUILDING PERMIT CONTACT SHEET -ASPE",
FOR PLAN REVIEW QUESTIONS — _ _ _ _ , . '''-'''llni V .
Name HANNAH-HUNT MOELLER Phone E-mail
FOR INSPECTION QUESTIONS ec asecons uc lon.com
_ -_• ;• s eve seep
Name Steven Waldeck Phone E-mail
OWNER Name
_ , , • Phone f 1 D" •h f •01 CO Cell Phone
Address City State ZIP
Ad dr
E-mail dneukomm@gmail.com ; cheyenne.neukomm@gmail.com --
ess
OWNER'S AUTHORIZED AGENT
Name Phone Cell Phone
Mailing Address City State ZIP
E-mail
Address
APPLICATION BEST CONTACT _ , , ___
Ai
Name
HANNAH-HUNT MOELLER phone Cell Phone
Mailing Address City State ZIP
E-mail Address HANNAH HUNT MOELLER
ARCHITECT OR DESIGNER OF RECORD
CRISTOF EIGELBERGER
Name Phone Cell Phone
Mailing City State ZIP
Address
E-mail CRISTOF@EIGELBERGER.COM
Address
CIVIL ENGINEER OF RECORD I Cell Phone
Name
ROARING FORK ENGINEERING RICHARD GOULDING.PE Phone
Cit State ZIP
Mailing y
Address
E-mail RICHARDG@RFENG.BIZ
Address
STRUCTUAL ENGINEER OF RECORD ` I ' ' Cell Phone
Name
KL&A BRETT MCELVAIN PE Phone
MAd City State ZIP
Address
E-mail BMCELVAIN@KLAA.COM
Address
GENERAL CONTRACTOR ` I- '-• i• I • ••
STEEPLECHASE STEVEN WALDECK Phone Cell Phone
Name
Mailing 124 Totterdown Road city
Aspen State Co ZIP 81611
Address
E-mail steve@steeplechaseconstruction.com
Add
I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and ordinances
governingher specified herein or
e granting
r cnclthis typeviiofo work
f anyl other e complied tateor ocalvlawt regulating construction ortthehperforman efofconstructermit ion s not
It is my responsibility thority to to review the
oapproved plans
sandians yo V
approved plans and any comments that are contained thereon and see that the structure and/or project is built in compliance with all applicable codes.
Additionally,I understand that I am responsible for ensuring that all sub-permits associated with my project are submitted to the City in compliance
with the approved Master plan set.I understand that the City does not review sub-permits for compliance with the master plan set
Date7/2712021
Contractor y You must take a test and complete the owner/building affidavit.
Signature
Check if you are a tested owner builder(single-family homes only). Date: Affidavit on file
(CITY USE ONLY)Owner builder approved by:
ASPEN CO 81611
CITY OF ASPEN
130 S. GALENA ST
_-7
ADDRESS: 134 E BLEEKER
PERMIT NUMBER: 0102 2020 BRES
COMMUNITY DEVELOPMENT DEPARTMENT
HOMEOWNER ASSOCIATION COMPLIANCE FORM
ASPEN
•
All applications for a building permit within the City of Aspen are required to include a certification of compliance
with applicable covenants and homeowner association policies. The certification must be signed by the property
owner or attorney representing the property owner. The following certification shall accompany the application
for a permit.
ADDRESS \ rcc\Cow UNIT# PARCEL ID#
I, the property owner, certify as follows: (pick one)
This property is not subject to a homeowners association or other form of private covenant.
❑ This property is subject to a homeowners association or private covenant and the improvements
proposed in this building permit do not require approval by the homeowners association or covenant
beneficiary.
0 This property is subject to a homeowners association or private covenant and the improvements
proposed in this building permit have been approved by the homeowners association or covenant beneficiary.
I understand the City of Aspen does not interpret, enforce, or manage the applicability, meaning, or effect
of private covenants or homeowner association rules or bylaws. I understand that this document is a public
document.
Owner Signature Date
7/27/2021
Owner Printed Name WtAre 1•1Q-..r•(--ewnw•
OR
Owner's Attorney Signature Date
Owner's Attorney Printed Name
130 S. GALENA ST AS' EN CO 81611
CITY OF ASPENJanuary2018
�.1
ADDRESS: 134 E SLEEKER PERMIT NUMBER: 0102-2020-BRES
COMMUNITY DEVELOPMENT DEPARTMENT 400
VALUATION AFFIDAVIT Orr ASPEN.
AFFIDAVIT POLICY
All applications for a building permit within the City of Aspen are required to include a certification of
compliance with building permit valuation requirements. The certification must be signed by the property
owner or authorized representative. The following certification shall accompany the application for a permit.
I,the property owner or authorized agent, understand and certify as follows:
City of Aspen Ordinance No. 40, Series of 2016 adopts the 2015 International Residential Code (IRC) and
International Building Code (IBC) with certain amendments.These codes define building valuation as follows:
R108.3 Building permit valuations. Building permit valuation shall include total value of the work for which a
permit is being issued, such as electrical,gas, mechanical, plumbing equipment, and other permanent systems,
including materials and labor.
109.3 Building permit valuations.The applicant for a permit shall provide an estimated permit value at time
of application. Permit valuations shall include total value of work, including materials and labor,for which the
permit is being issued, such as electrical,gas, mechanical, plumbing equipment and permanent systems. If, in
the opinion of the building official,the valuation is underestimated on the application,the permit shall be
denied, unless the applicant can show detailed estimates to meet the approval of the building official. Final
building permit valuation shall be set by the building official.
City policy indicates that permit valuation includes materials and labor for the structure and mechanical,
electrical, plumbing and gas,fire sprinkler and elevator systems and equipment. Permanent systems such as
audio visual, lighting and HVAC controls are included in the total as are expenses directly related to construction
such as equipment rental and contractor fees. Finish materials such as paint,floor coverings,tile, cabinets and
counter tops are included in the permit valuation total.
Costs such as architectural and engineering design fees, landscaping and planting,tap fees, development
mitigation fees,trash removal, and cleaning are not included.
I certify that the permit valuation entered on the permit application for this property complies with the above
valuation requirements. I understand that this document is a public document.
7/27/2021
Owner Signature: 4 Date:
Owner Printed Name:r- y\\e_k (\ku ,,..�
or,
Authorized Agent Signature: Date:
Authorized Agent Printed Name:
CITY OF ASPEN January2019 130 S. GALENA ST ASPEN CO 81611
PRESS: 134EBLEEKER PERMIT NUMBER: 0102.2020•BRES
i�� i�
�OMMUNITY DEVELOPMENT DEPARTMENT °Wf
r
ASBESTOS VERIFICATION AND CHECKLIST ITYOFASPEN
SBESTOS INFORMATION
Asbestos is a known human carcinogen and is an airborne hazard.Once airborne,asbestos fibers can stay suspended in the air for days,
weeks,or even months before settling out of the air.The fibers can easily become airborne again from a minor
or distur cause b e latent asbestos nce like turning
on an air conditioner.Uncontrolled asbestos abatement projects or renovation projects that disturb asbestos
hazards that could expose people to asbestos in the future,long after the renovation activity occurred.
The
airborne
cupants af b esthome.fiber
concentrations resulting from disturbances may result in a significant exposure to the current and future
oThe 1989"ban"on asbestos-containing materials is commonly misunderstood.In fact,in 1991 the U.S. Fifth Circuit Court of appeals
vacated much of the so-called"Asbestos Ban and Phaseout Rule"and remanded it to the EPA.Thus,much of the gi l 1989
categories ban
as
on the U.S.manufacturing,importation,processing,or distribution in commerce of many asbestos-containing product
set aside and DID NOT TAKE EFFECT.Therefore,ALL demolition,remodel or renovation projects must determine if disturbed material
above the trigger levels contains asbestos.
ASBESTOS CHECKLIST
[Yes KNo Residential:Will you be removing more than 32 sq ft, 50 linear feet (e.g., pipe insulation), or the volume
p
equivalent of a 55-gallon drum of any material besides concrete,wood, bricks, or steel—examples are drywall,
linoleum, ceiling tiles, roofing materials, etc.?
❑Yes53.No insulation), or the volume
Commercial:Will you be removing more than 160 sq ft, 260 linear feet (e.g., pipe
equivalent of a 55-gallon drum of any material besides concrete,wood, bricks, or steel —examples are drywall,
linoleum, carpet, carpet adhesives, ceiling tiles, roofing materials, etc.?
If the answer is YES to any of the above,you will need an asbestos test before you can receive a building and/
or demolition permit.You will also need to provide plans indicating areas to be demolished and determine if a
CO state demolition license is required.A state certified asbestos inspector must do this test and the test report
must be submitted with the building permit application. If the building has asbestos, a state certified asbestos
abatement firm must remove it. After removal,the abatement firm must provide a letter to the Building
Department stating that all the asbestos has been removed and that the air is clean.This letter must be received
BEFORE a permit will be issued. (See the local or statewide Yellow Pages, DexOnLine, or http://www.cdphe.state.
co.us/ap/asbestos/index.html for certified asbestos inspectors and abatement companies. ALWAYS ask for proof
of current state certification.)
If you are demolishing the building,you must submit a demolition permit app with the CDPHE in addition to the
Aspen permit app.This form may be found at https://www.colorado.gov/pacific/cdphe/asbestos-forms NOTE:
A copy of this demolition permit app must be submitted with the initial building permit application. When the
CDPHE approves the app,their issued permit must be given to the Aspen Building Dept before we issue our
permit.
I hereby certify that the above information is true and complete.
Owner Phone#HANNAH-HUNT MOELLER
Applicant (print name)Ste 'en Waldeck Phone#970-379-6286
Applicant Signature /dam' (.,t kie Date 7/27/2021
Please call the City of Aspen Environmental Health Department at 920-5039 at any time if you have questions
about asbestos, interpreting your test results,or other matters.
CITY OF ASPEN August2017 130 S. GALENA ST I ASPEN, CO 81611)
OpRESS:_ PERMIT NUMBER: ',�
COMMUNITY DEVELOPMENT DEPARTMENT op
CrTr O ASPEN
ZONING COMPLIANCE VERIFICATION POLICY
e.
All development projects must comply with the City's zoning regulations, including height ca nd
Applicability: p p y prior to prole
location, and are subject to periodic inspection during construction evelo meet projects within the City of Aspen
completion. When required by the City's Zoning Officer, certainp
shall verify height and/or location compliance through submission of a survey report.
and mixed-use projects proposed within one
Unless otherwise exempted, all commercial, multi-family, lodging, compliancen
fo
ot of the maximum permissible height or within one foot of allowable setbacks shall verify zoning
through this method. le-family/
zoning compliance for sing
In addition,the Zoning Officer may require this method be used to verify
duplex development or other projects where compliance may be in question. Independent of this policy, all
projects must comply with all applicable zoning limitations.
Burin building permit review if verifications ill beady required.
The Zoning Officer will inform the applicant compliance verification of a project which
However, circumstances may require zoning
accomplished at a point of construction when enough roof structure is in
Timing: c accurately verification measure the
structure when thees the
of the
yetp
early enough in the process to still make changes if the structure
is toots o tnehouldbe construction are finalencouraged exteriore to conferte
structures . Location verification m should inaccomplished Lo setback requirements. Applicantsare encouraged to
is Applicants
withecan g accurately measured timing of zoning compliance verification. to plan,e including theo
with the Zoning Officer regarding
ensure
perform their own verification during construction concrete etc pours.
building progressing
height and location of foundation forms priorict the height and location of a
building permit plan set. The
Survey Report:A Colorado Professional Land Surveyor
the zoningldescribe
heetof theapprovedeasured and if natural
Sur y
structure compared to the dimensions shown
City's Zoning Officer can assist in determining which elements of the structure shoulde m
or finished grade should be used.
The report shall include the following information: project, name of the owner and general
c1-Aon tract cover a written
with thebuilding permit number, name of thep J of measuremene
r with a written description of the measurement methods including date(s) e
contractor,
ro ert boundaries, permitted setbacks, building envelope
drawing showing p p y
2-Forapplicable),
location verification:tio A planeach observed measurement.
all
exteriorf applicable), location r fou
ndation walls, location of the outermost exterior o f ach structure (inclusive of a
o
veneer or other exterior treatments), and the location and dimension o
3-For height verification: Elevation drawing(s)
showing the natural or finished grade of the property, maximum
first
l
er
eri
permitted heighr
t, building elevations including the nominal roof form inlusivet of the such as shakes,ofext shingles,
sheathing or weatherproofing membrane but excluding all exterior surface
or other veneer treat
ments orornamentation), and the location and dimension of each observed measurement.
Additional roof plans showing location of measurements may be necessary.
CITY OF ASPEN August2017
130 S. GALENA ST ASPEN CO 81611
elevaLu u• WAHLy�iiictiidn�ca� apparatus, nottubs and spas, and otherneigntorsewdLRCACI„r.
unique to the project.
5-The report shall include a written description or drawing notes of the benchmarks or control points used to
establish property boundaries, setbacks, building location, building height,and grades for each measurement.
6-All drawings must correlate with the building locations, elevations, and grading/drainage representations in
the approved building permit set.
7-The report must include the signature, date, and stamp of Colorado Professional Land Surveyor
who
conducted the field measurements certifying that the field measurements areaccuratelyrepresented.
Review and Acceptance of Report:The Zoning Officer shall review the report(s) and either confirm the project
conforms to the dimensions shown on the zoning sheets of the approved building permit plan set and meets
the zoning limitations for the property or shall determine which elements of the project are not in compliance.
The Zoning Officer may request additional information to verify zoning compliance, which may include but is not
limited to additional survey work or a site visit.
All drawings of the survey report must correlate with representations in the approved building permit set for
acceptance. Modifications to field conditions or amendments to the building permit may be required.
tice and
A determination of non-compliance shall result in ecompliance ance fcorrectin early as reasoonably praocticalen the
work
stoppage. Applicants are encouraged to verify zoning as
construction process to minimize disruption to the construction schedule.
Acknowledgment:
Steeplechase Construction, Inc.
I (contractor name) understand this policy. I agree that this project will
comply with the zoning limitations affecting this parcel and the representations made on the zoning sheets of
the approved building permit plans. I understand that a Certificate of Occupancy will not be issued until this
project complies with all applicable zoning limitations.
Contractor Signature: *Au L.k
J CO---
7/27/20
Date:
CITY OF ASPEN August2017 130 S. GALENA ST ASPEN, CO 81611