Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
File Documents.134 E Bleeker St.0102-2020-BRES (22)
JEC0I Balancing . J JEDI Balancing, Inc. 568 Briggs Street(physical) P.O. Box 525 (mail) Erie, CO. 80516 Phone (720) 839-5333 www.jedibalancing.com Certified Test, Adjust & Balance Report Project 134 East Bleeker Street Address 134 East Bleeker St Aspen, CO Architect Unknown Mechanical Engineer Big Horn Engineers Contractor Grand Valley HVAC Date 3/7/2024 Job Number 2024-10153 Donald W. Pittser TABB Certified Supervisor TABB Firm Certification#BB009003C Stamp Expires 9/30/2024 Warranty Information: The data presented in this report is a record of system measurements and final adjustments that have been obtained in accordance with the current edition of the TABB International Standards for Environmental Systems Balance. The measurements shown, and the information given, in this report are certified to be accurate and complete, at the time and date information was gathered. Any variances from design quantities, which exceed TABB tolerances, are noted in the TAB report project summary. This project has a one-year guarantee on all Testing,Adjusting &Balancing from the date listed on this cover page. Instrumentation: Instrument I Manufacturer Model Serial Number Calibrated On Calibration Due Tachometer _ Shimpo MT-200 B175B5015P 05-03-2023 05-03-2024 Air Temperature Probe Evergreen Telemetry PR-T-1 1700353 07-14-2023 07-14-2024 Immersion Temperature Probe Evergreen Telemetry PR-T-4-6 1700204 07-14-2023 07-14-2024 Humidity Evergreen Telemetry S-H-3-5 1700295 07-14-2023 07-14-2024 Volt-Amp Meter Fluke 323 49251381WS 05-01-2023 05-01-2024 Air Pressure 1 Evergreen Telemetry S-PVF-1 8601242 03-17-2023 03-17-2024 Air Velocity/Airfoil Evergreen Telemetry S-PVF-1 8601242 03-17-2023 03-17-2024 Flowhood Evergreen Telemetry S-PVF-1 8601242 03-17-2023 03-17-2024 Hydronic Pressure TSI HM-675 71646134 07-25-2023 07-25-2024 Hydronic Differential Pressure TSI HM-675 71646134 07-25-2023 07-25-2024 Abbreviation Index TAB: Testing,Adjusting&Balancing Cx: Commissioning OD: Outside Diameter AHU:Air Handling Unit Motor FLA:Full Load Amperage Tl: Terminal 1 RTU: Roof Top Unit S.F.: Service Factor T2: Terminal 2 PACU: Packaged Air Conditioning Unit RPM: Revolutions per Minute T3: Terminal 3 MAU:Make Up Air Unit P.F.:Power Factor CS: Circuit Setter FCU: Fan Coil Unit Nom.Elf.:Nominal Efficiency BV: Balance Valve VAV:Variable Air Volume TDH: Total Dynamic Head K Factor: Correction Factor FPB: Fan Powered Box AK: Area Correction PSI: Pounds per Square Inch CUH: Cabinet Unit Heater Valve D.P.:Discharge Pressure UH:Unit Heater Valve S.P.: Suction Pressure ERV: Energy Recovery Ventilator ERU: Energy Recovery Unit EF:Exhaust Fan PEF: Power Exhaust Fan KEF: Kitchen Exhaust Fan SF: Supply Fan RF: Return Fan TF: Transfer Fan Diff.: Differential SEF: Smoke Exhaust Fan DX: Direct Expansion SACU: Spilt Air Conditioner Unit SP: Static Pressure TSP: Total Static Pressure in.wc:Inches Water Column ESP:External Static Pressure HW:Heating Water VP:Velocity Pressure CHW: Cooling Water SA: Supply Air CW: Condenser Water RA:Return Air HX: Heat Exchanger OSA: Outside Air SWD: Sidewall Diffuser MA:Mixed Air EAT:Entering Air Temperature OA: Outside Air CD: Ceiling Diffuser EWT:Entering Water Temperature SD: Supply Diffuser ER: Exhaust Register LAT:Leaving Air Temperature MVD:Manual Volume Damper RG: Return Grille LWT:Leaving Water Temperature OBD: Opposed Blade Damper NAC:No Access CFM: Cubic Feet Per Minute CMH: Cubic Meters per Hour NG:Not Given FPM:Feet Per Minute SSD: Square Supply Diffuser NIC:Not in Contract SRD: Square Return Diffuser E: Existing M:Meter TG: Transfer Grille cm: Centimeter Pa: Pascal 1/s:Liters per Second mm:Millimeter kPa:Kilopascal ADM:Air Data Meter(manometer) SPF: Stairwell Pressurization Fan N/A:Not Applicable Design D.P.: Design Differential Pressure Actual D.P.: Recorded Differential Pressure Ind.Imp.Dia.Indicated Impeller Diameter CRAC: Computer Room Air Conditioning Unit ., ,,, JEDI Balancing Table Of Contents PROJECT: 134 EAST BLEEKER ST DATE: 3/7/2024 LOCATION: ASPEN, CO CONTACT: Josh Cota PROJECT#: 2024-10153 AUTHOR: Donald Pittser Table Of Contents 1 2024 10153 134 East Bleeker Street Report Summary.pdf 1 2 Field Note Report Summary 2 3 Air Handling Unit 3 3.1 FC-01 3 3.2 FC-01/SPP-01 4 3.3 FC-01/OSA 5 3.4 FC-02 6 3.5 FC-02 /SPP-01 7 3.6 FC-03 8 3.7 FC-04 9 3.8 FC-05 10 3.9 MAU-01 11 3.10 MAU-01/SPP-01 12 4 Fan Unit 13 4.1 EF-01 13 4.2 EF-02-01 14 4.3 EF-02-02 15 4.4 EF-02-03 16 4.5 EF-02-04 17 4.6 EF-02-05 18 4.7 EF-02-06 19 4.8 EF-02-07 20 5 Hydronic Pump 21 5.1 CP-02 BOILER 21 5.2 CP-03 SNOWMELT LOOP 22 5.3 CP-04 SNOWMELT INJ 23 5.4 CP-05 FC'S 24 5.5 CP-07 DOM WATER 25 5.6 RCP-01 DOM HW RECIRC 26 6 134 E BLEEKER ST TAB DRAWINGS.pdf 27 6.1 134 E. Bleeker Mechanical 27 6.2 134 Mech Crawler 27 6.3 134 Mech Lower Level 27 6.4 134 Mech Main Level 27 6.5 134 Mech Roof 27 6.6 134 Mech Upper Level 27 7 TAB Equipment Calibrations 2023d.pdf 41 JEDI Balancing, Inc. JEDI Balancing, Inc. 568 Briggs Street(physical) P.O.Box 525 (mail) A Erie,CO. 80516 Phone(720)839-5333 www.jedibalancing.com Report Summary and Remarks Project: 134 East Bleeker Street Project: 2024 10153 Scope:The Test and Balance(TAB) scope of work consisted of Air Handling Unit(FCU)-5, (MAU)-1, Exhaust Fan(EF)-8,Pump-6 Procedures: FCU,MAU—Constant Volume Each unit has a constant volume fan that was set for design airflow and the associated supply outlets were balanced in full cooling demand. The total Supply Air CFM was measured as individually listed under each unit. The Outside Air CFM was measured as individually listed under each unit. The Return Air CFM was measured as individually listed under each unit.All final TAB settings and performance measurements were completed,and data was recorded on to the appropriate test report forms. Exhaust Fans with Grilles and Hoods The fans were energized,measured,and set for total airflow. The associated inlets were balanced as noted in this report. The Exhaust Air CFM was measured as individually listed under each unit.Final settings and performance measurements were completed,and data recorded on to the appropriate test report forms. Hydronic Systems The Circulation Pumps were indexed to full flow conditions. Initial pump performance and final pump performance was set and noted in this report. The final system settings were completed,and final performance data was recorded. The test results and issues are reported on the individual test pages. Motor Tag Data Not Accessible(Embedded) Embedded Motor—Limited motor nameplate information provided.Motor nameplate information is obscured by the motor mounting bracket and not visible without disassembly of the motor from the unit. The motor is accessible for service and maintenance. No Access Between Coils Some unit arrangement prevents access to obtain a complete static pressure profile for all the components. Static pressure test ports could not be safely drilled between the heating and cooling coils without risking damage to the coils and are recorded as"Not Accessible"in the Report. Schematic Line Diagrams Report includes reduced mechanical drawings used for the test and balance work. These"Keyed Drawing" were used in place of single line schematic diagrams and include the unique designations for the tested items in the final TAB report. Submittals: Submittals were not provided for the project. to+/-10% of design flow rates Any values outside the specified tolerances are noted on the Equipment Comment Log and the individual test report pages. Previously Forwarded/Accepted As-Is Equipment Comment Log Project Summary The following page(s)lists all project comments and issues.All items described and listed on the following Equipment Comment Log have been previously forwarded for resolution and have been accepted as reported. Page 1 of 44 JEDI Balancing Field Note Report Summary PROJECT: 134 EAST BLEEKER ST DATE: 3/7/2024 LOCATION: ASPEN, CO CONTACT: Josh Cota PROJECT#: 2024-10153 AUTHOR: Donald Pittser Test System/ Unit Name Date Contact Notes/ Logs Fan Unit EF-02-07 5-Mar-24 Bryan Hund 'Used cord for temporary power. Hydronic Pump CP-02 BOILER 5-Mar-24 Bryan Hund No ports or setter. Operational check only on high speed. Hydronic Pump CP-03 SNOWMELT LOOP 5-Mar-24 Bryan Hund No ports or setter. Operational check only on high speed. Hydronic Pump CP-04 SNOWMELT INJ 5-Mar-24 Bryan Hund No ports or setter. Operational check only on low speed. Hydronic Pump CP-05 FC'S 5-Mar-24 Bryan Hund No ports or setter. Operational check only on high speed. Hydronic Pump CP-07 DOM WATER 5-Mar-24 Bryan Hund No ports or setter. Operational check only. Hydronic Pump RCP-01 DOM HW RECIRC 5-Mar-24 Bryan Hund No ports or setter. Operational check only on high speed. JEDI Balancing, Inc. Page 2 of 44 JEDI Balancing • Air Handling Unit PROJECT: 134 EAST BLEEKER ST DATE: 3/7/2024 LOCATION: ASPEN, CO CONTACT: Josh Cota PROJECT#: 2024-10153 AUTHOR: Donald Pittser SYSTEM/UNIT: FC-01 Tested By: Bryan Hund Date: 3/6/2024 Unit Data Motor Data Unit Manufacturer DAIKEN FC-01/Supply Fan Unit Model Number DV36FECC14AB Motor Manufacturer Embedded Unit Serial Number 2305039906 Motor HP 3/4 Motor RPM Not Given Starter Data Motor Frame Not Given FC-01/Supply Fan Motor Phase 1 Starter Manufacturer Thermally Protected Motor Rated Volts 208/230 Motor FL Amps 5.20 Design Data Motor Service Factor 1.0 Total Flow Design 1025 Supply Fan Design ESP 1 in.wc Sheave Data Supply Fan Design TSP Not Given in.wc FC-01/Supply Fan Supply Fan Design RPM Not Given Drive Type Direct Drive Supply Fan Motor Design HP 3/4 Supply Fan Motor Design RPM Not Given Final Data Supply Fan Motor Design Volts 120 Fan Flow Test Method Flowhood Summation Supply Fan Motor Design Phase 1 OA Damper Pos 50 Design Filter MERV Rating 11 OA Flow Test Method Airfoil Traverse Test Data Measured Data Connected Actual FC-01/Supply Fan Supply Airflow 875 865 Fan RPM Actual Direct Drive Outside Airflow 250 250 Operating Hertz 60 Return Airflow 615 Filter Data Electrical Test Data FC-01/SF Filter Bank FC-01/Supply Fan Filter Type RETURN/OSA AIR Motor Volts 1 234 MERV Rating MERV 8 Motor Amps 1 3.40 Filter Quantity(set 1) 1 Corrected Nameplate Amps 5.11 Filter Size(set 1) 20X20X1 Actual BHP 0.50 Volts/Amps Measured By RMS Clamp Meter JEDI Balancing, Inc. Page 3 of 44 JEDI Balancing Air Handling Unit PROJECT: 134 EAST BLEEKER ST DATE: 3/7/2024 LOCATION: ASPEN, CO CONTACT: Josh Cota PROJECT#: 2024-10153 AUTHOR: Donald Pittser SYSTEM/UNIT: FC-01/SPP-01 Tested By: Bryan Hund Date: 3/6/2024 Test Data Test Pressures Actual TSP 1.09 in.w.c. Filter SP In -0.22 in.w.c. External SP 0.61 in.w.c. Filter SP Out -0.34 in.w.c. DX Coil SP In -0.34 in.w.c. DX Coil SP Out -0.59 in.w.c. Supply Fan SP In -0.59 in.w.c. Supply Fan SP Out 0.50 in.w.c. Heating Coil SP In 0.50 in.w.c. Heating Coil SP Out 0.39 in.w.c. Static Pressure Profile 0.12 0.25 1.0" 0.11 ______ _ : .. ..,,, ,, ,,,, ! / !/ ' 1' L ,.. E R 1 . ..,,,/.•'''' —0.22 —0.34 —0.59 0.50 0.39 JEDI Balancing, Inc. Page 4 of 44 1,1 JEDI Balancing Air Handling Unit PROJECT: 134 EAST BLEEKER ST DATE: 3/7/2024 LOCATION: ASPEN, CO CONTACT: Josh Cota PROJECT#: 2024-10153 AUTHOR: Donald Pittser SYSTEM/UNIT: FC-01/OSA Tested By: Bryan Hund Date: 3/5/2024 Unit Data Final Data Traverse Location OSA DUCT Design Total Flow 250 CFM Type of Traverse Round Actual Total Flow 248 CFM Round Diameter 10 in. Average Reading 451 FPM Air Flow Area(Ak) 0.55 sq.ft. Sum of Readings 4056 FPM Readings Height 3 Static Pressure -0.29 in.w.c. Readings Width 3 Air Temperature 36.0°F Total Readings 9 Altitude 8000 Ft Instrument Used Alnor Probe Airfoil Traverse Data Points 6i O 2 A 449 Hole 1 0 d47 0 460 _ I V 10 }� JEDI Balancing, Inc. Page 5 of 44 JEDI Balancing • Air Handling Unit PROJECT: 134 EAST BLEEKER ST DATE: 3/7/2024 LOCATION: ASPEN, CO CONTACT: Josh Cota PROJECT#: 2024-10153 AUTHOR: Donald Pittser FC-01 Supply Outlet Summary System/Unit Area Served Outlet Size inch Design Prelim Final % Instrument Open Area Ak(sq ft) Final Type Airflow Airflow Airflow Final (sq ft) Velocity CFM CFM CFM I FPM Outlet-01 BED 1 SD 8" 250 210 235 94 Flow Hood Outlet-02 REC SD 8" 125 145 130 104 Flow Hood Outlet-03 REC SD 8" 125 135 120 96 Flow Hood Outlet-04 BED 2 SD 8" 125 110 120 96 Flow Hood Outlet-05 BED 3 SD 8" 125 130 130 104 Flow Hood Outlet-06 STORAGE SD 8" 125 115 130 104 Flow Hood LOCKER Totals: - - - 875 845 865 99 - - SYSTEM/UNIT: FC-02 Tested By: Bryan Hund Date: 3/6/2024 Unit Data Motor Data Unit Manufacturer DAIKEN FC-02/Supply Fan Unit Model Number DV48FECD14AB Motor Manufacturer Embedded Unit Serial Number 2304264046 Motor HP 3/4 Motor RPM Not Given Starter Data Motor Frame Not Given FC-02/Supply Fan Motor Phase 1 Starter Manufacturer Thermally Protected Motor Rated Volts 208/230 Motor FL Amps 5.20 Design Data Motor Service Factor 1.0 Total Flow Design 1350 Supply Fan Design ESP 1 in.wc Sheave Data Supply Fan Design TSP Not Given in.wc FC-02/Supply Fan Supply Fan Design RPM Not Given Drive Type Direct Drive Supply Fan Motor Design HP 3/4 Supply Fan Motor Design RPM Not Given Final Data Supply Fan Motor Design Volts 120 Fan Flow Test Method Flowhood Summation Supply Fan Motor Design Phase 1 OA Damper Pos Not Applicable(MAU fan)% Design Filter MERV Rating 11 OA Flow Test Method Airfoil Traverse Test Data Measured Data Connected Actual FC-02/Supply Fan Supply Airflow 1350 1295 Fan RPM Actual Direct Drive Outside Airflow 1200(MAU 1180 i Operating Hertz 60 Mode) Filter Data Electrical Test Data FC-02/SF Filter Bank FC-02/Supply Fan Filter Type RETURN/OSA AIR Motor Volts 1 232 MERV Rating MERV 8 Motor Amps 1 4.80 Filter Quantity(set 1) 1 Corrected Nameplate Amps 5.16 Filter Size(set 1) 20X20X1 Actual BHP 0.70 Volts/Amps Measured By RMS Clamp Meter JEDI Balancing, Inc. Page 6 of 44 JEDI Balancing Air Handling Unit PROJECT: 134 EAST BLEEKER ST DATE: 3/7/2024 LOCATION: ASPEN, CO CONTACT: Josh Cota PROJECT#: 2024-10153 AUTHOR: Donald Pittser SYSTEM/UNIT: FC-02/SPP-01 Tested By: Bryan Hund Date: 3/6/2024 Test Data Test Pressures Actual TSP 1.12 in.w.c. Filter SP In -0.29 in.w.c. External SP 0.65 in.w.c. Filter SP Out -0.40 in.w.c. DX Coil SP In -0.40 in.w.c. DX Coil SP Out -0.64 in.w.c. Supply Fan SP In -0.64 in.w.c. Supply Fan SP Out 0.48 in.w.c. Heating Coil SP In 0.48 in.w.c. Heating Coil SP Out 0.36 in.w.c. Static Pressure Profile 0.11 0.24 1.12 0.12 L T E v1 40`J II .,,,,,,/' R /� -0.29 —0.40 —0.64 0.48 0.36 FC-02 Supply Outlet Summary System/Unit Area Served Outlet Size inch Design Prelim Final % Instrument Open Area Ak(sq ft) Final Type Airflow Airflow Airflow Final (sq ft) Velocity CFM CFM CFM FPM Outlet-01 OFFICE SD 8" 125 120 130 104 Flow Hood Outlet-02 OFFICE SD 8" 125 140 130 104 Flow Hood Outlet-03 KITCHEN SD 8" 125 100 120 96 Flow Hood Outlet-04 ENTRY SD 8" 125 95 120 96 Flow Hood Outlet-05 ENTRY SD 8" 125 110 125 100 Flow Hood Outlet-06 VEST SD 8" 125 120 120 96 Flow Hood Outlet-07 LIVING SD 8" 200 180 180 90 Flow Hood Outlet-08 ENTRY SD 8" 200 170 180 90 Flow Hood Outlet-09 LIVING SD 8" 200 165 190 95 Flow Hood Totals: - - - 1350 1200 1295 96 - - - - JEDI Balancing, Inc. Page 7 of 44 JEDI Balancing • Air Handling Unit PROJECT: 134 EAST BLEEKER ST DATE: 3/7/2024 LOCATION: ASPEN, CO CONTACT: Josh Cota PROJECT#: 2024-10153 AUTHOR: Donald Pittser SYSTEM/UNIT: FC-03 Tested By: Bryan Hund Date: 3/6/2024 Unit Data Motor Data Unit Manufacturer DAIKEN FC-03/Supply Fan Unit Model Number FDQ12WVJU9 Motor Manufacturer Embedded Unit Serial Number E003051 Motor HP 0.17 Motor RPM Not Given Starter Data Motor Frame Not Given FC-03/Supply Fan Motor Phase 1 Starter Manufacturer Thermally Protected Motor Rated Volts 208/230 Motor FL Amps 0.63 Design Data Motor Service Factor 1.0 Total Flow Design 400 Supply Fan Design ESP 1 in.wc Sheave Data Supply Fan Design TSP Not Given in.wc FC-03/Supply Fan Supply Fan Design RPM Not Given Drive Type Direct Drive Supply Fan Motor Design HP 1 Supply Fan Motor Design RPM Not Given Final Data Supply Fan Motor Design Volts 120 Fan Flow Test Method Flowhood Summation Supply Fan Motor Design Phase 1 Design Filter MERV Rating 11 Measured Data FC-03/Supply Fan Test Data Fan RPM Actual Direct Drive Connected Actual Operating Hertz 60 Supply Airflow 400 380 Outside Airflow 0 0 Return Airflow 380 Electrical Test Data FC-03/Supply Fan Motor Volts 1 233 Motor Amps 1 0.50 I Corrected Nameplate Amps 0.62 I Actual BHP 0.14 I Volts/Amps Measured By RMS Clamp Meter FC-03 Supply Outlet Summary System/Unit Area Served Outlet Size inch Design Prelim Final % Instrument Open Area Ak(sq ft) Final Type Airflow Airflow Airflow Final (sq ft) Velocity CFM CFM CFM FPM Outlet-01 GUEST SD 8" 200 135 190 95 Flow Hood HOUSE Outlet-02 GUEST SD 8" 200 130 190 95 Flow Hood HOUSE Totals: - - - 400 265 380 95 - - - JEDI Balancing, Inc. Page 8 of 44 JEDI Balancing • Air Handling Unit PROJECT: 134 EAST BLEEKER ST DATE: 3/7/2024 LOCATION: ASPEN, CO CONTACT: Josh Cota PROJECT#: 2024-10153 AUTHOR: Donald Pittser SYSTEM/UNIT: FC-04 Tested By: Bryan Hund Date: 3/7/2024 Unit Data Motor Data Unit Manufacturer DAIKEN FC-04/Supply Fan Unit Model Number FDQ12WVJU9 Motor Manufacturer Embedded Unit Serial Number E003052 Motor HP 0.17 Motor RPM Not Given Starter Data Motor Frame Not Given FC-04/Supply Fan Motor Phase 1 Starter Manufacturer Thermally Protected Motor Rated Volts 208/230 Motor FL Amps 0.63 Design Data I Motor Service Factor 1.0 Total Flow Design 400 Supply Fan Design ESP 1 in.wc Sheave Data Supply Fan Design TSP Not Given in.wc FC-04/Supply Fan Supply Fan Design RPM Not Given Drive Type Direct Drive Supply Fan Motor Design HP 1 Supply Fan Motor Design RPM Not Given Final Data Supply Fan Motor Design Volts 120 Fan Flow Test Method Flowhood Summation Supply Fan Motor Design Phase 1 Design Filter MERV Rating 11 Measured Data FC-04/Supply Fan Test Data Fan RPM Actual Direct Drive Connected Actual Operating Hertz 60 Supply Airflow 500 460 Outside Airflow 0 0 Return Airflow 460 Electrical Test Data FC-04/Supply Fan Motor Volts 1 234 Motor Amps 1 0.58 I Corrected Nameplate Amps 0.62 I Actual BHP 0.16 I Volts/Amps Measured By RMS Clamp Meter FC-04 Supply Outlet Summary System/Unit Area Served Outlet Size inch Design Prelim Final % Instrument Open Area Ak(sq ft) Final Type Airflow Airflow Airflow Final (sq ft) Velocity CFM CFM CFM FPM Outlet-01 M BATH SD 8" 200 220 180 90 Flow Hood Outlet-02 M BED SD 8" 150 120 140 93 Flow Hood Outlet-03 M BED SD 8" 150 110 140 93 Flow Hood Totals: - - - 500 450 460 92 - - JEDI Balancing, Inc. Page 9 of 44 JEDI Balancing • Air Handling Unit PROJECT: 134 EAST BLEEKER ST DATE: 3/7/2024 LOCATION: ASPEN, CO CONTACT: Josh Cota PROJECT#: 2024-10153 AUTHOR: Donald Pittser SYSTEM/UNIT: FC-05 Tested By: Bryan Hund Date: 3/7/2024 Unit Data Motor Data Unit Manufacturer DAIKEN FC-05/Supply Fan Unit Model Number FDMQ12WVJU9 Motor Manufacturer Embedded Unit Serial Number E002962 Motor HP 0.17 Motor RPM Not Given Starter Data Motor Frame Not Given FC-05/Supply Fan Motor Phase 1 Starter Manufacturer Thermally Protected Motor Rated Volts 208/230 Motor FL Amps 0.63 Design Data I Motor Service Factor 1.0 Total Flow Design 400 Supply Fan Design ESP 1 in.wc Sheave Data Supply Fan Design TSP Not Given in.wc FC-05/Supply Fan Supply Fan Design RPM Not Given Drive Type Direct Drive Supply Fan Motor Design HP 1 Supply Fan Motor Design RPM Not Given Final Data Supply Fan Motor Design Volts 120 Fan Flow Test Method Flowhood Summation Supply Fan Motor Design Phase 1 Design Filter MERV Rating 11 Measured Data FC-05/Supply Fan Test Data Fan RPM Actual Direct Drive Connected Actual Operating Hertz 60 Supply Airflow 400 395 Outside Airflow 0 0 Return Airflow 395 Electrical Test Data FC-05/Supply Fan Motor Volts 1 232 Motor Amps 1 0.53 I Corrected Nameplate Amps 0.62 I Actual BHP 0.15 I Volts/Amps Measured By RMS Clamp Meter FC-05 Supply Outlet Summary System/Unit Area Served Outlet Size inch Design Prelim Final % Instrument Open Area Ak(sq ft) Final Type Airflow Airflow Airflow Final (sq ft) Velocity CFM CFM CFM FPM Outlet-01 M HALL SD 6" 200 165 195 98 Flow Hood Outlet-02 M CLOSET SD 6" 200 175 200 100 Flow Hood Totals: - - - 400 340 395 99 - - JEDI Balancing, Inc. Page 10 of 44 JEDI Balancing Air Handling Unit PROJECT: 134 EAST BLEEKER ST DATE: 3/7/2024 LOCATION: ASPEN, CO CONTACT: Josh Cota PROJECT#: 2024-10153 AUTHOR: Donald Pittser SYSTEM/UNIT: MAU-01 Tested By: Bryan Hund Date: 3/6/2024 Unit Data Motor Data Unit Manufacturer FANTECH MAU-01/Supply Fan Unit Model Number PRIOAIR 10 EC Motor Manufacturer Embedded Unit Serial Number 1007864596 Motor HP 308 watts Motor RPM Not Given Starter Data Motor Frame Not Given MAU-01/Supply Fan Motor Phase 1 Starter Manufacturer Thermally Protected Motor Rated Volts 115 Motor FL Amps 2.59 Design Data Motor Service Factor 1.0 Total Flow Design 1200 Supply Fan Design ESP Not Given in.wc Sheave Data Supply Fan Design TSP Not Given in.wc MAU-01/Supply Fan Supply Fan Design RPM Not Given Drive Type Direct Drive Supply Fan Motor Design HP Not Given Supply Fan Motor Design RPM Not Given Final Data Supply Fan Motor Design Volts Not Given Fan Flow Test Method Airfoil Traverse Supply Fan Motor Design Phase Not Given Design Filter MERV Rating Not Given Measured Data MAU-01/Supply Fan Test Data Fan RPM Actual Direct Drive Connected Actual Fan Speed/Setpoint 100% Supply Airflow 1200 1180 Operating Hertz 60 Outside Airflow 1200 1180 Filter Data Electrical Test Data MAU-01/SF Filter Bank MAU-01/Supply Fan Filter Type OSA AIR Motor Volts 1 123 MERV Rating MERV 8 Motor Amps 1 2.10 Filter Quantity(set 1) 1 Corrected Nameplate Amps 2.53 Filter Size(set 1) 20X30X1 Actual BHP 0.34 Volts/Amps Measured By RMS Clamp Meter JEDI Balancing, Inc. Page 11 of 44 JEDI Balancing Air Handling Unit PROJECT: 134 EAST BLEEKER ST DATE: 3/7/2024 LOCATION: ASPEN, CO CONTACT: Josh Cota PROJECT#: 2024-10153 AUTHOR: Donald Pittser SYSTEM/UNIT: MAU-01/SPP-01 Tested By: Bryan Hund Date: 3/5/2024 Test Data Test Pressures Actual TSP 0.96 in.w.c. Filter SP In -0.50 in.w.c. External SP 0.68 in.w.c. Filter SP Out -0.78 in.w.c. Supply Fan SP In -0.78 in.w.c. Supply Fan SP Out 0.18 in.w.c. 'Static Pressure Profile ) i 11 ' S F) • E �__- RT MAU-01 Supply Outlet Summary System/Unit Area Served Outlet Size inch Design Prelim Final % Instrument Open Area Ak(sq ft) Final Type Airflow Airflow Airflow Final (sq ft) Velocity CFM CFM CFM FPM Outlet-01 FC-02 OA 18/12 1200 1180 1180 98 AIRFOIL 0.55 0.55 2145 Totals: - - - 1200 1180 1180 98 - JEDI Balancing, Inc. Page 12 of 44 JEDI Balancing Fan Unit PROJECT: 134 EAST BLEEKER ST DATE: 3/7/2024 LOCATION: ASPEN, CO CONTACT: Josh Cota PROJECT#: 2024-10153 AUTHOR: Donald Pittser SYSTEM/UNIT: EF-01 Tested By: Bryan Hund Date: 3/6/2024 Unit Data Motor Data Fan Manufacturer PANASONIC Motor Manufacturer EMBEDDED Fan Model Number FV-115VK2 Motor HP Not Given Fan Serial Number 2024 Motor RPM Not Given Type of Service EXHAUST Motor Frame Not Given Motor Phase 1 Starter Data Motor Rated Volts 120 Starter Manufacturer Thermally Protected Motor FL Amps 0.33 Motor Service Factor 1.0 Design Data Total Flow Design 200 Sheave Data Total Connected Design Flow 200 Drive Type Direct Drive Design ESP 0.2 in.wc Design TSP Not Given in.wc Final Data Fan Design RPM Not Given Total Fan Flow Actual 180 Fan Motor Design HP 64 W Fan Flow Test Method Flowhood Summation Fan Motor Design RPM Not Given Fan Motor Design Voltage 120 Measured Data Fan Motor Design Phase 1 Fan RPM Actual Direct Drive Fan Speed/Setpoint 150 CFM Electrical Test Data Operating Hertz 60 Motor Volts 1 Actual 120 Motor Amps 1 Actual 0.30 Test Pressures Corrected Nameplate Amps 0.33 Fan SP In Actual Atmosphere in.wc Volts/Amps Measured By RMS Clamp Meter Fan SP Out Actual No Access in.wc EF-01 Exhaust Inlet Summary System/Unit Area Served Outlet Size inch Design Prelim Final % Instrument Open Area Ak(sq ft) Final Type Airflow Airflow Airflow Final (sq ft) Velocity CFM CFM CFM FPM Inlet-01 GARAGE ER 8" 200 175 180 90 Flow Hood Totals: - - - 200 175 180 90 - - - JEDI Balancing, Inc. Page 13 of 44 JEDI Balancing Fan Unit PROJECT: 134 EAST BLEEKER ST DATE: 3/7/2024 LOCATION: ASPEN, CO CONTACT: Josh Cota PROJECT#: 2024-10153 AUTHOR: Donald Pittser SYSTEM/UNIT: EF-02-01 Tested By: Bryan Hund Date: 3/6/2024 Unit Data Motor Data Fan Manufacturer PANASONIC Motor Manufacturer EMBEDDED Fan Model Number FV-0511VQ1 Motor HP Not Given Fan Serial Number 2024 Motor RPM Not Given Type of Service EXHAUST Motor Frame Not Given Motor Phase 1 Starter Data Motor Rated Volts 120 Starter Manufacturer Thermally Protected Motor FL Amps 0.31 Motor Service Factor 1.0 Design Data Total Flow Design 36/75 Sheave Data Total Connected Design Flow 75 Drive Type Direct Drive Design ESP 0.25 in.wc Design TSP Not Given in.wc Final Data Fan Design RPM Not Given Total Fan Flow Actual 80 Fan Motor Design HP 10.2 W Fan Flow Test Method Flowhood Summation Fan Motor Design RPM Not Given Fan Motor Design Voltage 120 Measured Data Fan Motor Design Phase 1 Fan RPM Actual Direct Drive Fan Speed/Setpoint 80 CFM Electrical Test Data Operating Hertz 60 Motor Volts 1 Actual 123 Motor Amps 1 Actual 0.24 Test Pressures Corrected Nameplate Amps 0.30 Fan SP In Actual Atmosphere in.wc Volts/Amps Measured By RMS Clamp Meter Fan SP Out Actual No Access in.wc EF-02-01 Exhaust Inlet Summary System/Unit Area Served Outlet Size inch Design Prelim Final % Instrument Open Area Ak(sq ft) Final Type Airflow Airflow Airflow Final (sq ft) Velocity CFM CFM CFM FPM Inlet-01 BATH 1 ER 6" 75 110 80 107 Flow Hood Totals: - - - 75 110 80 107 - - - JEDI Balancing, Inc. Page 14 of 44 JEDI Balancing Fan Unit PROJECT: 134 EAST BLEEKER ST DATE: 3/7/2024 LOCATION: ASPEN, CO CONTACT: Josh Cota PROJECT#: 2024-10153 AUTHOR: Donald Pittser SYSTEM/UNIT: EF-02-02 Tested By: Bryan Hund Date: 3/6/2024 Unit Data Motor Data Fan Manufacturer PANASONIC Motor Manufacturer EMBEDDED Fan Model Number FV-0511VQ1 Motor HP Not Given Fan Serial Number 2024 Motor RPM Not Given Type of Service EXHAUST Motor Frame Not Given Motor Phase 1 Starter Data Motor Rated Volts 120 Starter Manufacturer Thermally Protected Motor FL Amps 0.31 Motor Service Factor 1.0 Design Data Total Flow Design 36/75 Sheave Data Total Connected Design Flow 75 Drive Type Direct Drive Design ESP 0.25 in.wc Design TSP Not Given in.wc Final Data Fan Design RPM Not Given Total Fan Flow Actual 80 Fan Motor Design HP 10.2 W Fan Flow Test Method Flowhood Summation Fan Motor Design RPM Not Given Fan Motor Design Voltage 120 Measured Data Fan Motor Design Phase 1 Fan RPM Actual Direct Drive Fan Speed/Setpoint 80 CFM Electrical Test Data Operating Hertz 60 Motor Volts 1 Actual 121 Motor Amps 1 Actual 0.23 Test Pressures Corrected Nameplate Amps 0.31 Fan SP In Actual Atmosphere in.wc Volts/Amps Measured By RMS Clamp Meter Fan SP Out Actual No Access in.wc EF-02-02 Exhaust Inlet Summary System/Unit Area Served Outlet Size inch Design Prelim Final % Instrument Open Area Ak(sq ft) Final Type Airflow Airflow Airflow Final (sq ft) Velocity CFM CFM CFM FPM Inlet-01 PWDER RM ER 6" 75 80 80 107 Flow Hood Totals: - - - 75 80 80 107 - - - JEDI Balancing, Inc. Page 15 of 44 JEDI Balancing Fan Unit PROJECT: 134 EAST BLEEKER ST DATE: 3/7/2024 LOCATION: ASPEN, CO CONTACT: Josh Cota PROJECT#: 2024-10153 AUTHOR: Donald Pittser SYSTEM/UNIT: EF-02-03 Tested By: Bryan Hund Date: 3/6/2024 Unit Data Motor Data Fan Manufacturer PANASONIC Motor Manufacturer EMBEDDED Fan Model Number FV-0511VQ1 Motor HP Not Given Fan Serial Number 2024 Motor RPM Not Given Type of Service EXHAUST Motor Frame Not Given Motor Phase 1 Starter Data Motor Rated Volts 120 Starter Manufacturer Thermally Protected Motor FL Amps 0.31 Motor Service Factor 1.0 Design Data Total Flow Design 36/75 Sheave Data Total Connected Design Flow 75 Drive Type Direct Drive Design ESP 0.25 in.wc Design TSP Not Given in.wc Final Data Fan Design RPM Not Given Total Fan Flow Actual 85 Fan Motor Design HP 10.2 W Fan Flow Test Method Flowhood Summation Fan Motor Design RPM Not Given Fan Motor Design Voltage 120 Measured Data Fan Motor Design Phase 1 Fan RPM Actual Direct Drive Fan Speed/Setpoint 80 CFM Electrical Test Data Operating Hertz 60 Motor Volts 1 Actual 122 Motor Amps 1 Actual 0.24 Test Pressures Corrected Nameplate Amps 0.30 Fan SP In Actual Atmosphere in.wc Volts/Amps Measured By RMS Clamp Meter Fan SP Out Actual No Access in.wc EF-02-03 Exhaust Inlet Summary System/Unit Area Served Outlet Size inch Design Prelim Final % Instrument Open Area Ak(sq ft) Final Type Airflow Airflow Airflow Final (sq ft) Velocity CFM CFM CFM FPM Inlet-01 BATH 3 ER 6" 75 85 85 113 Flow Hood Totals: - - - 75 85 85 113 - - - JEDI Balancing, Inc. Page 16 of 44 JEDI Balancing Fan Unit PROJECT: 134 EAST BLEEKER ST DATE: 3/7/2024 LOCATION: ASPEN, CO CONTACT: Josh Cota PROJECT#: 2024-10153 AUTHOR: Donald Pittser SYSTEM/UNIT: EF-02-04 Tested By: Bryan Hund Date: 3/6/2024 Unit Data Motor Data Fan Manufacturer PANASONIC Motor Manufacturer EMBEDDED Fan Model Number FV-0511VQ1 Motor HP Not Given Fan Serial Number 2024 Motor RPM Not Given Type of Service EXHAUST Motor Frame Not Given Motor Phase 1 Starter Data Motor Rated Volts 120 Starter Manufacturer Thermally Protected Motor FL Amps 0.31 Motor Service Factor 1.0 Design Data Total Flow Design 36/75 Sheave Data Total Connected Design Flow 75 Drive Type Direct Drive Design ESP 0.25 in.wc Design TSP Not Given in.wc Final Data Fan Design RPM Not Given Total Fan Flow Actual 80 Fan Motor Design HP 10.2 W Fan Flow Test Method Flowhood Summation Fan Motor Design RPM Not Given Fan Motor Design Voltage 120 Measured Data Fan Motor Design Phase 1 Fan RPM Actual Direct Drive Fan Speed/Setpoint 80 CFM Electrical Test Data Operating Hertz 60 Motor Volts 1 Actual 121 Motor Amps 1 Actual 0.23 Test Pressures Corrected Nameplate Amps 0.31 Fan SP In Actual Atmosphere in.wc Volts/Amps Measured By RMS Clamp Meter Fan SP Out Actual No Access in.wc EF-02-04 Exhaust Inlet Summary System/Unit Area Served Outlet Size inch Design Prelim Final % Instrument Open Area Ak(sq ft) Final Type Airflow Airflow Airflow Final (sq ft) Velocity CFM CFM CFM FPM Inlet-01 POWDER RM ER 6" 75 130 80 107 Flow Hood Totals: - - - 75 130 80 107 - - - JEDI Balancing, Inc. Page 17 of 44 JEDI Balancing Fan Unit PROJECT: 134 EAST BLEEKER ST DATE: 3/7/2024 LOCATION: ASPEN, CO CONTACT: Josh Cota PROJECT#: 2024-10153 AUTHOR: Donald Pittser SYSTEM/UNIT: EF-02-05 Tested By: Bryan Hund Date: 3/6/2024 Unit Data Motor Data Fan Manufacturer PANASONIC Motor Manufacturer EMBEDDED Fan Model Number FV-0511VQ1 Motor HP Not Given Fan Serial Number 2024 Motor RPM Not Given Type of Service EXHAUST Motor Frame Not Given Motor Phase 1 Starter Data Motor Rated Volts 120 Starter Manufacturer Thermally Protected Motor FL Amps 0.31 Motor Service Factor 1.0 Design Data Total Flow Design 36/75 Sheave Data Total Connected Design Flow 75 Drive Type Direct Drive Design ESP 0.25 in.wc Design TSP Not Given in.wc Final Data Fan Design RPM Not Given Total Fan Flow Actual 80 Fan Motor Design HP 10.2 W Fan Flow Test Method Flowhood Summation Fan Motor Design RPM Not Given Fan Motor Design Voltage 120 Measured Data Fan Motor Design Phase 1 Fan RPM Actual Direct Drive Fan Speed/Setpoint 80 CFM Electrical Test Data Operating Hertz 60 Motor Volts 1 Actual 123 Motor Amps 1 Actual 0.22 Test Pressures Corrected Nameplate Amps 0.30 Fan SP In Actual Atmosphere in.wc Volts/Amps Measured By RMS Clamp Meter Fan SP Out Actual No Access in.wc EF-02-05 Exhaust Inlet Summary System/Unit Area Served Outlet Size inch Design Prelim Final % Instrument Open Area Ak(sq ft) Final Type Airflow Airflow Airflow Final (sq ft) Velocity CFM CFM CFM FPM Inlet-01 M BATH ER 6" 75 100 80 107 Flow Hood Totals: - - - 75 100 80 107 - - - JEDI Balancing, Inc. Page 18 of 44 JEDI Balancing Fan Unit PROJECT: 134 EAST BLEEKER ST DATE: 3/7/2024 LOCATION: ASPEN, CO CONTACT: Josh Cota PROJECT#: 2024-10153 AUTHOR: Donald Pittser SYSTEM/UNIT: EF-02-06 Tested By: Bryan Hund Date: 3/6/2024 Unit Data Motor Data Fan Manufacturer PANASONIC Motor Manufacturer EMBEDDED Fan Model Number FV-0511VQ1 Motor HP Not Given Fan Serial Number 2024 Motor RPM Not Given Type of Service EXHAUST Motor Frame Not Given Motor Phase 1 Starter Data Motor Rated Volts 120 Starter Manufacturer Thermally Protected Motor FL Amps 0.31 Motor Service Factor 1.0 Design Data Total Flow Design 36/75 Sheave Data Total Connected Design Flow 75 Drive Type Direct Drive Design ESP 0.25 in.wc Design TSP Not Given in.wc Final Data Fan Design RPM Not Given Total Fan Flow Actual 85 Fan Motor Design HP 10.2 W Fan Flow Test Method Flowhood Summation Fan Motor Design RPM Not Given Fan Motor Design Voltage 120 Measured Data Fan Motor Design Phase 1 Fan RPM Actual Direct Drive Fan Speed/Setpoint 80 CFM Electrical Test Data Operating Hertz 60 Motor Volts 1 Actual 121 Motor Amps 1 Actual 0.23 Test Pressures Corrected Nameplate Amps 0.31 Fan SP In Actual Atmosphere in.wc Volts/Amps Measured By RMS Clamp Meter Fan SP Out Actual No Access in.wc EF-02-06 Exhaust Inlet Summary System/Unit Area Served Outlet Size inch Design Prelim Final % Instrument Open Area Ak(sq ft) Final Type Airflow Airflow Airflow Final (sq ft) Velocity CFM CFM CFM FPM Inlet-01 M TLT ER 6" 75 85 85 113 Flow Hood Totals: - - - 75 85 85 113 - - - JEDI Balancing, Inc. Page 19 of 44 JEDI Balancing Fan Unit PROJECT: 134 EAST BLEEKER ST DATE: 3/7/2024 LOCATION: ASPEN, CO CONTACT: Josh Cota PROJECT#: 2024-10153 AUTHOR: Donald Pittser SYSTEM/UNIT: EF-02-07 Tested By: Bryan Hund Date: 3/6/2024 Unit Data Motor Data Fan Manufacturer PANASONIC Motor Manufacturer EMBEDDED Fan Model Number FV-0511VQ1 Motor HP Not Given Fan Serial Number 2024 Motor RPM Not Given Type of Service EXHAUST Motor Frame Not Given Motor Phase 1 Starter Data Motor Rated Volts 120 Starter Manufacturer Thermally Protected Motor FL Amps 0.31 Motor Service Factor 1.0 Design Data Total Flow Design 36/75 Sheave Data Total Connected Design Flow 75 Drive Type Direct Drive Design ESP 0.25 in.wc Design TSP Not Given in.wc Final Data Fan Design RPM Not Given Total Fan Flow Actual 80 Fan Motor Design HP 10.2 W Fan Flow Test Method Flowhood Summation Fan Motor Design RPM Not Given Fan Motor Design Voltage 120 Measured Data Fan Motor Design Phase 1 Fan RPM Actual Direct Drive Fan Speed/Setpoint 80 CFM Electrical Test Data Operating Hertz 60 Motor Volts 1 Actual 120 Motor Amps 1 Actual 0.24 Test Pressures Corrected Nameplate Amps 0.31 Fan SP In Actual Atmosphere in.wc Volts/Amps Measured By RMS Clamp Meter Fan SP Out Actual No Access in.wc Log: EF-02-07 3/5/2024 Bryan Hund Used cord for temporary power. EF-02-07 Exhaust Inlet Summary System/Unit Area Served Outlet Size inch Design Prelim Final % Instrument Open Area Ak(sq ft) Final Type Airflow Airflow Airflow Final (sq ft) Velocity CFM CFM CFM FPM Inlet-01 GUEST BATH ER 6" 75 0 80 107 Flow Hood Totals: - - - 75 0 80 107 - - - - JEDI Balancing, Inc. Page 20 of 44 JEDI Balancing • Hydronic Pump PROJECT: 134 EAST BLEEKER ST DATE: 3/7/2024 LOCATION: ASPEN, CO CONTACT: Josh Cota PROJECT#: 2024-10153 AUTHOR: Donald Pittser SYSTEM/UNIT: CP-02 BOILER Tested By: Bryan Hund Date: 3/6/2024 Unit Data Motor Data Pump Manufacturer GRUNDFOS Motor Manufacturer Not Given Pump Model Number UPML 25-104 Motor HP 3-100 watts Pump Serial Number 2024 Motor RPM Not Given Type of Service BOILER Motor Frame Not Given Motor Phase 1 Starter Data Motor Rated Volts 115 Starter Manufacturer Thermally Protected Motor F.L.Amps 0.05-1.4 Motor S.F. 1.0 Design Data Pump Design Flow 20 GPM Design TDH 20 Ft Total Connected Flow 20 GPM Pump Design RPM Not Given Motor Design HP 2/5 Design Impeller Diam. Not Given in. Final Test Data Final Flow Actual See Notes GPM Electrical Test Data Motor Volts 1 121 Volts Motor Amps 1 1.36 Amps Corrected Nameplate Amps 1.39 Pump BHP 0.13 BHP Volts/Amps Measured By RMS Clamp Meter Operating HZ 60 Log: CP-02 BOILER 3/5/2024 Bryan Hund No ports or setter.Operational check only on high speed. JEDI Balancing, Inc. Page 21 of 44 JEDI Balancing • Hydronic Pump PROJECT: 134 EAST BLEEKER ST DATE: 3/7/2024 LOCATION: ASPEN, CO CONTACT: Josh Cota PROJECT#: 2024-10153 AUTHOR: Donald Pittser SYSTEM/UNIT: CP-03 SNOWMELT LOOP Tested By: Bryan Hund Date: 3/6/2024 Unit Data Motor Data Pump Manufacturer GRUNDFOS Motor Manufacturer Not Given Pump Model Number UPS15-58FC Motor HP 60/80/87 watts Pump Serial Number 2024 Motor RPM Not Given Type of Service SNOWMELT LOOP Motor Frame Not Given Motor Phase 1 Starter Data Motor Rated Volts 115 Starter Manufacturer Thermally Protected Motor F.L.Amps 0.55/0.66/0.75 Motor S.F. 1.0 Design Data Pump Design Flow 2 GPM Design TDH 20 Ft Total Connected Flow 2 GPM Pump Design RPM Not Given Motor Design HP Not Given Design Impeller Diam. Not Given in. Final Test Data Final Flow Actual See Note GPM Electrical Test Data Motor Volts 1 122 Volts Motor Amps 1 0.65 Amps Corrected Nameplate Amps 0.65 Pump BHP 0.12 BHP Volts/Amps Measured By RMS Clamp Meter Operating HZ 60 Log: CP-03 SNOWMELT LOOP 3/5/2024 Bryan Hund No ports or setter.Operational check only on high speed. JEDI Balancing, Inc. Page 22 of 44 JEDI Balancing • Hydronic Pump PROJECT: 134 EAST BLEEKER ST DATE: 3/7/2024 LOCATION: ASPEN, CO CONTACT: Josh Cota PROJECT#: 2024-10153 AUTHOR: Donald Pittser SYSTEM/UNIT: CP-04 SNOWMELT INJ Tested By: Bryan Hund Date: 3/6/2024 Unit Data Motor Data Pump Manufacturer GRUNDFOS Motor Manufacturer Not Given Pump Model Number UPS26-99FC Motor HP 150/179/197 watts Pump Serial Number 2024 Motor RPM Not Given Type of Service SNOMELT INJ Motor Frame Not Given Motor Phase 1 Starter Data Motor Rated Volts 115 Starter Manufacturer Thermally Protected Motor F.L.Amps 1.3/1.5/1.8 Motor S.F. 1.0 Design Data Pump Design Flow 2 GPM Design TDH 20 Ft Total Connected Flow 2 GPM Pump Design RPM Not Given Motor Design HP Not Given Design Impeller Diam. Not Given in. Final Test Data Final Flow Actual See Note GPM Electrical Test Data Motor Volts 1 120 Volts Motor Amps 1 1.20 Amps Corrected Nameplate Amps 1.30 Pump BHP 0.19 BHP Volts/Amps Measured By RMS Clamp Meter Operating HZ 60 Log: CP-04 SNOWMELT INJ 3/5/2024 Bryan Hund No ports or setter.Operational check only on low speed. JEDI Balancing, Inc. Page 23 of 44 JEDI Balancing • Hydronic Pump PROJECT: 134 EAST BLEEKER ST DATE: 3/7/2024 LOCATION: ASPEN, CO CONTACT: Josh Cota PROJECT#: 2024-10153 AUTHOR: Donald Pittser SYSTEM/UNIT: CP-05 FC'S Tested By: Bryan Hund Date: 3/6/2024 Unit Data Motor Data Pump Manufacturer GRUNDFOS Motor Manufacturer Not Given Pump Model Number UPS26-99FC Motor HP 150/179/197 watts Pump Serial Number 2024 Motor RPM Not Given Type of Service FC Motor Frame Not Given Motor Phase 1 Starter Data Motor Rated Volts 115 Starter Manufacturer Thermally Protected Motor F.L.Amps 1.3/1.5/1.8 Motor S.F. 1.0 Design Data Pump Design Flow 9 GPM Design TDH 30 Ft Total Connected Flow 9 GPM Pump Design RPM Not Given Motor Design HP 2/5 Design Impeller Diam. Not Given in. Final Test Data Final Flow Actual See Note GPM Electrical Test Data Motor Volts 1 121 Volts Motor Amps 1 1.68 Amps Corrected Nameplate Amps 1.79 Pump BHP 0.25 BHP Volts/Amps Measured By RMS Clamp Meter Operating HZ 60 Log: CP-05 FC'S 3/5/2024 Bryan Hund No ports or setter.Operational check only on high speed. JEDI Balancing, Inc. Page 24 of 44 JEDI Balancing • Hydronic Pump PROJECT: 134 EAST BLEEKER ST DATE: 3/7/2024 LOCATION: ASPEN, CO CONTACT: Josh Cota PROJECT#: 2024-10153 AUTHOR: Donald Pittser SYSTEM/UNIT: CP-07 DOM WATER Tested By: Bryan Hund Date: 3/6/2024 Unit Data Motor Data Pump Manufacturer TACO Motor Manufacturer Not Given Pump Model Number 006-B4 Motor HP 1/40 Pump Serial Number 2024 Motor RPM 3250 Type of Service DOM WATER Motor Frame Not Given Motor Phase 1 Starter Data Motor Rated Volts 115 Starter Manufacturer Thermally Protected Motor F.L.Amps 0.52 Motor S.F. 1.0 Design Data Pump Design Flow 24 GPM Design TDH 20 Ft Total Connected Flow 24 GPM Pump Design RPM Not Given Motor Design HP 0.6 Design Impeller Diam. Not Given in. Final Test Data Final Flow Actual See Note GPM Electrical Test Data Motor Volts 1 123 Volts Motor Amps 1 0.48 Amps Corrected Nameplate Amps 0.51 Pump BHP 0.02 BHP Volts/Amps Measured By RMS Clamp Meter Operating HZ 60 Log: CP-07 DOM WATER 3/5/2024 Bryan Hund No ports or setter.Operational check only. JEDI Balancing, Inc. Page 25 of 44 JEDI Balancing • Hydronic Pump PROJECT: 134 EAST BLEEKER ST DATE: 3/7/2024 LOCATION: ASPEN, CO CONTACT: Josh Cota PROJECT#: 2024-10153 AUTHOR: Donald Pittser SYSTEM/UNIT: RCP-01 DOM HW RECIRC Tested By: Bryan Hund Date: 3/6/2024 Unit Data Motor Data Pump Manufacturer GRUNDFOS Motor Manufacturer Not Given Pump Model Number UPMXL 25-124 Motor HP 3-120 watts Pump Serial Number 2024 Motor RPM Not Given Type of Service DOM WATER RECIRC Motor Frame Not Given Motor Phase 1 Starter Data Motor Rated Volts 115 Starter Manufacturer Thermally Protected Motor F.L.Amps 0.05-1.7 Motor S.F. 1.0 Design Data Pump Design Flow 5 GPM Design TDH 20 Ft Total Connected Flow 5 GPM Pump Design RPM Not Given Motor Design HP Not Given Design Impeller Diam. Not Given in. Final Test Data Final Flow Actual See Note GPM Electrical Test Data Motor Volts 1 123 Volts Motor Amps 1 1.58 Amps Corrected Nameplate Amps 1.66 Pump BHP 0.15 BHP Volts/Amps Measured By RMS Clamp Meter Operating HZ 60 Log: RCP-01 DOM HW RECIRC 3/5/2024 Bryan Hund No ports or setter.Operational check only on high speed. JEDI Balancing, Inc. Page 26 of 44 386 Indian Road - 101 W 11th Street 4109-C :.,7,......7, Grand Junction,CO 81501 Durango,CO 81301 Phone:(970)241-8709 k,..1 Phone:(970)422-7676 MECHANICAL ELEMENTS/VALVING HVAC&DUCTWORK SYMBOLS RESPONSIBLE DIVISION: EIEVE2E2 m7gura00- ,LIEF/SAFEN VALVE X A A....A 1 SECTION THROUGH aFruary ou, C,TION THROUGH EXPOUST AIR DUCT =117RTIRTNrOWCIT/F=1770'VERSTZDUCTZPOTXPL'Er=a=1 IN PLACE PNO WIRED,FOLLOWS Bighorn Consulting Engineers,Inc. Mechanical&Electrical Engineers ( = SECTION THROUGH SUPP,.. 011 OUTSIDE AIR OUST 'T WI:: LTA- F>T1 GATE VW, rA< ...A _' GUIDE _--0.. p„.ww0„2 wwwpww EQUIPMENT 23 „ TB - 1=' EXPANSION JOINT SUBSTITUTIONS, rATE1 GLOBE VALVE -11- AUTID,OC FILL VALVE --- so SWOPE DAMPER ...man.ansaass MOTOR WARW..mu5r.r.c SUPP,OR OUTSIDE AIR DUCT A SUBSTITUTIONS,SUBSETUTION OF SPECIFIED EOUIPM,T WILL FE AWO,D -1V1- PLUG VALVE +"" MAN,L MP VENT 4- FLOW SWITCH ASSESS DOOR.IBOTTOM OP SIDE/ MOTOIXZFERS VEERS WO 23,11 . 26E0 23 THROUGX A PRIOR APPROVAL PROCESS INITIATED BY THE OGHLRACTOR. IrIOT1===.1TI.U12MITZXALLE=CFo, -1 5- BUTIERFLY VALVE A'''4' AUTOMATIC AR VENT EXTENEP 4 TT TEMPE,TURE ....,: ACOUSTICAL, DUCT OP T N I E'CTIPP=:%tr.-- 'RA Sua nTZT.71-Va'sl=n,c rarkasms-rsa E/8E0,0MP, "linl 2g. Lc iigikEEEFEFEs FIRE DAMPER,SMOKE DAMPER,FIR 2 0 BAIL VALVE DISCHARGE,,,, y,,,.,,, ...„221 Egggg Fsr MITTER OR ='. MAX,VOLUME DAMPER PRESSURE SWITCH 1=IrElr,\IIIT'VST 2, 2, „ „ sawn..OF SITE swarms,SPECISICASIONa __13.,..1_ SWIPG CHECK VALVE -1., 61- rww METERNENTORI F.7,".... T. in i. INCLINED DROP IN DIRECTION OE/ARROW =37019,1E'Rr. Ityt FENT.'I IET.ViC7.3704 TOTS7341TATZP11:7,70179741 4..!0& _4•2,_ LIFT CHECN WOVE -III- ....ATA..... THERMOMEFER 29 23 26 23 'Cl- GATE MEW.ANGLE -NIP- DIRECTION OF FLOW --rISGergrt 8 SPPPON„EMS n . w INCLINED RISE IP DIRECTION OF ARROW TRANSED016,RECTANGULAR TO aou. T0'3 ITT'Erag173''''''' 29 23 26 23 THERMOSTATS EINE VOLTAGE, 23 23 e3 26 IF.fl3FIERFra:409FE AS,EZFI TTWIE:FEC'E'CFLPCi3.1TT 0 A''.ri -9.1 2 +1- GLosE vu,ANGLE -0-4--.... DIRECTION OF PITCH,ISE OR DROP AQUAST AT a FLEXIBLE DUGT TEMPERATURE corvra«PANELS 23 23 , 23 -I- .(4-g '1*ARE 2;FlEikir.41gN ikg7'4GIC 0,. -(31- IMPHRAGM VALVE IN.LINE FAN I,I =ITEWrr"'" n maws- M DRAWINGS. 4IrL)LIAI 1 101 BALANCING VAL, /.0 W IT,NSIQON.RECTANGULAR 7kanrifsMg''''' se ssm - nats1 L21%7JATZJ=74,TZTZL'07=1-2PA=, LF*A,1 E7i1E'Sli,1'3',ILS VE,IONSOF-DIE MECIONICAL PLUME,AND„ER,CONSERV,.COD,. ALL MEE.,„OMAR-EWA,REWIRED PT THESE CODES 5,,BERK/111,D —11... CIPCUIT SMOG •36,2 SPIWIN COL,R IX,ADAPTER OM TOP OF DUCT „ „ „ 2, ONS UN.S INDICATED OTHERWISE OTHER APPLI,B, - EVIANCING VAL, D PIPE DROPPING DOM t 11 -._ _.- CEILING SUPP,AIR REGISTER/GRILLE „2„,,FF„.„..„ 23 29 W 23. EOIRE:SfiETAINSTIIT''rEE VWEREEDtal,TPUBV"E FO 8 g]_0_ THREE WAX CONTROL VWVE 61 CONCENTRIC REDUCER 03, STEAM TRAP 0'O3. CR)173 . i zE.c.rozW H E;;INN,S T;;ALION;00,C;;;;ESE;6;0P A R,r;TzH EmE E p0;;;;E70;71 R.c, m=r4--------..---„--- TO BE IN ACCORDANCE WITH THE RE,MMENOPTIONS OF THE MAPUFPC, A.--1 ....T......... -I - ESPANS,1 LOOP num,.sown<MO'<Mr MO.OFF.PILOT L.TS. rTi TWO WAY CONTROL VALVE i ''.- 5...WALL SUPPLY AIR REGISTER(SR) OF THE MATERIAL Bow INSTALLED.PRINTED COPIES OF THESE 1''g. _./.__,_ LINION-SCREWED OR FLANGED IIIIMI ELBOW TURNED DOWN 'rArr4=1=CtrgUIPITEI:OrA=EritZTINMITLIZVZIZSTIVIENE uN.r,„„„,,,A,,,,,,,,,,,,,,,,•Eo.,,,,,,,,,,,,,,,„.,„ ,T E a• n ._ N' VACUUM BREAKER VOLTA,,RX1611 AND SPE UNDER DIVISION 23,CONNECT I1N,P DIVISION, s 5 s' -A-- SOCEN00 VALVE C1 STEAM LEAN DETECTOR 0 THERMOSTAT II. ,,,,,rup.,op =REDUCING PSI/ FIRE SMOKE CAMPER C DIGITAL SENSOR 'Q] - ELBOW.RADIUS TPR ABBREVIATIONS, AI' MOUNTING HEIGFLF ABOVE DIFF DIFFERENTIAL , w„p PT PRESSURE TRATEMITIER 0 ca..MONOXIDE 2 .SQUARE ON RECTANGULAR TYPE WITH AIRFOIL TURNING VANES FINISHED FLOOR TO OEHLER CP DEVICE ,,,,,,,,,,,,,,,, A AMPS NT NEIGKr wrnc PPCI,ED TERMINW, r CONGDON, DO anaon HTR HEATER T.' „MIDESATUREIRSES„RE C) CARBON DIOXI, 0 06 a .... , PLUG VP, RELIEF VALVE -0,- .. ACCESS DOOR ON Dom NWR HEATING WATER RETURN AAV elanonerreweva.ve wc POLVVINVL CHLORIDE DS DUCT SILENCER NWS HEATING WATER SUPPLY AIR SEPARATOR li HEAT EXCHANGER _ws E __ CEILING RETURN AIR RESISTER(RR) ABY ABO, as AIR,NDITIONING urvrt ows owns. sx HEAT EXCHANGER QTY WANT, RA RENRN AIR GRILLE/REGISTER HYDRAULIC SEPARATOR DX DIRECT EXPANSION NZ NERrz -... -..- SIDEWALL RETLI,AIR REGISTER,. as ABOVE COUNTER 4,1 EXISTING ,, ,,,,,„2.2.„2„ RGP RER,FED CEILING PLAN UJ A. .............. EA EXHAUST AIR GRILLEMEGISTER 10 ISOLATED GROUND RD ROOF OPWN UJ OREM ENO DUCT A.EC.PROVE FINISHED C., REL RELIEF EAT ENTERING AIR TEMPEFMTURE IN INCHES I ARC.ABOVE FINISHED GRADE EC ELECTRICAL CONPUCTOR INV INVERT REGO REGUIRED C jgs,K,,,c+ FLEXIBLE CONNECTION 'vs AMPERE nrERRuvrixo ECG EC,NTRIC JBOX amen.sox RF RE,RN FAN H OQRACITV RH RELATIVE HUMID, EF EXFOUST FAN I, KELVIN A.F'A.VE FW.HE.R.. EFF EFFICIENCY ICH naown, RHO REHEAT COIL Cr) A.. .R H....r.''...' EL ELEVATION INA NILO NO,-AMPS R, RATED LOAD AMPS 0 ALUM WUMIN, ELEC ELECTRIC L LENGTH , ROOM Et a AP ACC,3 PANEL OR DOOR LINE DESIGNATION SYMBOLS EL,ELEVATOR ion22„,ww.,222„wwwFww, RPM REROLVIEOPE PER MIBLFEE ATS AUTOMATIC TRANSFER SNATCH F.F..F.F,FL.F.F...... LV LAVATORY SA SUPPLY AIR GRILLE/REGISTER LI] Et AV AUDIO I VIDEO SC SHORT CIRCUIT 0 ENT ENTERING LE1 POUND -cswa- CHILLED WATI9Y RETURN AVG AVUMGE SC.A SHORT CIRCUIT AVAILABLE -i or ELECTRIC METALLIC TUBE L0 LINEAR DIFFUSER AWG AMERICAN WIRE GAGE -CHWS- CHILLED WATER SUPPLY EC EQUAL LF LINEAR FEET SCCR SHORT CIRCUIT CURREALF w a . COMPRESS Fus BASEBOARD w u BUILDING PUTOMW,SYSTEM F..,E...., RATI, . saw( ED AIR SS ..C' ...... UIV WSW/BLEW LID uoum Bo ex«oan EO ,DAMPER SD WIOSE DAMPED -I Z HOUSE OUTSIDE MR CALCULATION OR CONDENSER WATER PIMPS , END SWITCH LRA LUM, BFP BACK FLOW PREVEQFOR SEP SMOKE EXHAUST FAN co E- 101173,60,66,610,66,640, -CS- CONDENSER WAT,SUPP, BL BOILER ESP EXTERNAL STATIC PRESSURE L, LOCKED ROTOR AMPS SF SOPP,FM ET EXPANSION,. LV LOUVER Cf) -o - rwery K.BUILD., SH SENSIBLE HEAT EWC ELECTRIC WATER COOLER Lys Lsnvm H < a. BELOW SH SHOWER -HpR- ,AT,m,,,,,,s, EWI ENTERING WATER Larr LEAVING WATER TEMPERATURE „ ,„,,„„...„ CO BOG BOTTOM OF BEAM TEMPERATURE MN THOUSANDS OF BTU PER HOUR ::,, :=Zop,,E,„.„ <-HPS- HEAT PIMP SUPPLY soo so,-,,,,,,, EX EXIMUST MC MECHANICAL CONTRACTOR sop sou,.op p,p, EXPAN anamslon spas SPECIFICATION swa NOT WATER RETURN H.MIN...CIRC''IT'AAA.' W BSPIT BASEMENT EXT EXTERNAL MCB MAIN CIRCUIT BREAKER WATER SUPPLY BTU BRITISH new.unar , DEGREES FAHRENHEIT MO MOTORIZED oznIzor ss sovaL.s STEEL c a.w.ea FA FREE AR, , SAF,/SHOWER 71- -G - NATURAL GAS MOP mnsi DISSPIEnssos PANEL cap ...Tv FC FAN coil.utur mar,MEDIUM STD STANDARD Cr) . REFRIGERANT HON PRESSURE VAPOR co CIRCUIT BREAKER „ ppopc.„222 STL STEEL ,- BER MANUFACTURER a REFRIGERANT LIQUID AND VAPOR LINE PER CIRCUIT SPLANOI,VALVE p„,,,,,,,,,,,,,„2„ MIN MINIMUM SYS SYSTEM -RS- REFRIGERANT SUOQOX/VAPOR. II9rFIER=E'rE'C'E'' „ p,„www„, MI,MISCELLANEOUS TEMP TEMPERATURE ED FLOOR oacx on., mw 0.0,1, CET CIRCUIT 7a TAMPER RESISTANT -SIER- SNOWME,RETU, FIN FINISHED MOCP MAXIMUM OVERCURRENT CFH COM FEET PER K.. ss TEMPERATURE TFONENITTER FLA FULL LOAD AMPS A...... -SMS- SPOWMEST SUPP, CFRI C13191C FE,PER MINUTE F,X FLEXIB, .T. ..... rre TELECOMMUNICATIONS (DA,: EsuED,i, CH,CHIL,D WATER PETEURN TE,I1WE BACKBOARD -V - VENT PIPING F. FLOOR MUA MAKE.UP AIR utor a•uve CHILLED WATER SUP,/ .. .... mum,Revak FOB auvroueorrom u uevranL a ener Rou . T,NSFORMER 2.22.2222 cpww„,„3„.„22. FOT FLAT OH TOP NC NORMAL,CLOSED CL CENTER LINE UO UNDERCUT DOOR FP PIRE PROTECTION NEG NEGATIVE ow came UH me NEATER FP FI,PUMP NIC NOT IN CONTRACT OF,,NOR,E MASONRY WI Fp. „„„....„ urvo UNLESS NOTED OTHERWISE , CLEAN OUT 1,4.11.or NIGHT/SECURITY LIGHT-SO ....„ ...coup.. FPS FEET PER SECOND COL COLUMN NO NORAOLW OPEN UR URINAL FS WOW SWITCH COMP COMPRESSOR NOM RE , NOMINW V VOLTS FED FIOMO DAMPER CONG.CONCRETE NTS NOT TO SCALE VA VOLT AMPERE FT FEET KE COED CONDENSATE on OUTSIDE MR VA VALVE EEC FL,BLE CONNECT, COM CONNECTION 00 OPPOSED BLADE DAMPER vnv VARNBLEPIR VOLUME unrr OND OROBIND cow CONTINUATION OC ON CENTER WED VARIABLE„EWEN,„WE , GAUGE coma CONTRACTOR 0,OCCUPIED NW VARIABLE REFRIGERANT FLOW WE CALLON CRI COLOR RENDERING INDEX o, 0,,,,,,,,,,,,.... VOLT VOLTAGE CT COOLING Ton. oo OUTSIDE DIAMETER vsa PEN,HROUGH ROOF w„wwwww,F220„0„ CT CURREALF TRANSFORMER CONDUCTOR OL OVERLOAD W WIDTH CU COND,S1,UNIT GEC!/GE!GROUND FAULT CIREMIT oao OVERFLOW ROOF DRAIN Pi moss co COPPER ....... OS OUNCE W/ WITN CUR CABINET UNIT HEATER oc GENERAL COISITOOTOR PED PARWLEL SLADE DAMPER WO orraotrr CVS “NSTANT VOLUME BOX GPH GALLONS F£R HOUR PO PRESSURE DROP WEI WET BULB LUMN .- -) CWR GADENSER WATER RERI, GPM GALLO,PER MINUTE PR PI.MSE WC WATER CO CWS CONDENSER WATER SUFWLY GRS/LS GROINS PER POUND PPS POSLFWE PRESSURE WC WATER CLOSET DATE oys,,,,,,, on DRY au. H20 WATER POE POINT OF SAL, PIG WATER GAUGE JOB HQ A.. DEPT DEPARIMEHT . HOSE SIBS ,,,,, „E,„n,„,,,,,„AL„ WP WEAThIERPROOF DRAWHBV: FICE DF DRINKING Foonrr. ss .660....... p, „,,,,,,,,,,,,,, WPIU WEATHERPROOF IIMJSE c,,,,,,,,, SCE MG DIAGRAM HP HORSEPOWER %RIR TI,N6FORMER sew-rums., MO-1 J.26.2022.2:66.. Page 27 of 44 FAN COIL SCHEDULE MECHANICAL PROVISIONS ounDE Enemy Am 'a°""' HOT WATEMILATIMB COIL ELECTRIC. L:====.: OF THIS NATURE WK..°EOUAL.BY THE ENGINEER OR ARCHITECT. z.PERMITS PUMP SCHEDULE FEss .<Bl.xxwH<. .EHVICE umkn<x <.x MEAD Rw, v........ M.«L...,ixexe.«e. 01910%ccua<wE. B aHOP DRAW�Nes J DOMESTIC WATER RECIRC vs q -w ONIC SHOP NGS AND WNELT A.P,EBO DUCT WWORK-SUPP ORT/HANG.�Arvo DUCTS BABo CEILINGHSOI„TIox T.P. cva sN BOFAN ILER LOOP ION MECH.RM. 6 30 VARIABLE R90NI60 0.60 TACOVHISM NOTE-4 Toe c3 c COATED FABRIC WP11 A NINERIAL BASE FLEXIBLE DUCT CONNECTOS 4C...g•5°., pi, SHALL BE LISTED EV U L,CUSS 1 DUCTS,ARO SHALL HAVE A ,, 30/11E0 0 di TACO RATING HOT EXCEEDING Eh K SH.Lw55 DMNSOiO NOwoRBETHwaO QUENCENO ,, DOM. EECTiONWATER PNw MECH. .,,RM. RN 20 VARIABLE gwre< 40 .,,,,A. wS NOTE-5 FUME SPREAD RATING NOT ID(CIEENS 25 AHO A SMOKE NOTE a B.USE OF FLEXIBLE 0,CONTRACTOR uBE CAREFUL SOAS HOT TO KINK OR COLLAPSE ANa.F c'w FLEXIBLE DUCT0 LINEAR FEET PEP RUN. A2 LLJ— SxlaOs.n,CFMCDMBIHEBA.BECFMEKH .,PaEi,F,;uaTIRDxDAaWDEDMMOFDRPDwEaMaEi;iATMOFDRaiAaiE TmrEEFETAE',ialrvsrlArviEg7 rvEOTloxa.MOToaHOaaEPOwEAFES B.REPRMBRExr THB f� 0 a.Pao,IDEwIPH STAINLESS STEEL POWER DIacwNEDT.MOToaaiAR,Ea NON METAuici aEo.DNNEDxo.a.�masaA.e.ow.xE.xNwuE.xo.oa xDRaEPDWER SHALL e u<S�OE AR _�' MNrvTAIwNO HOVSESwwCSONEmNATiON. ` — S ,.PROVwFwHHwKw BAaix.MOOFLBA,OOPLFN wMParSTFwANOeLEANOwaIaLAaRMSAxOONP.E,Norv,aol,Eq.owAxo HlOxwATER.,ARMa.NrvOawi«xrROL w AHD IN SUCH A WAN,.TO BE x«rvsPlciOuanrvD FREE FROM ANY y etl POSSIBLE CONDENSATION. 8 . E.9"EUltBrE'TF,'IlE:E=ELRENEBri Gr.H=CUELI:TZEPit'VSLO'LTR' FAN LE ST TVPE FITTINGS SUITABLE FOP CONNECTION WITH SILVER SOLDER. ewe w xwwTMO. SERVICE cnw<x <w Emma.smile MSS Iww<I.D BCHE w xm<R euMFACTNwaewxeL <FnwxwACEewwa :;I8 m a.DUCTWORK - - F4 NW 120/1/00 PANASONIC-FV30V03 NOTE-1 L i c"°"' R RESTROOM CEILING 36.5 0.25 10.20 - P./ 120/1M0 PANASONIC W-079MM NOTE-1 i 0 03 B.AZUZZORR SHALL BE THE LOW VELOCITY TYPE.UNLESS SPECIFIED 17X.I.A,m,<wF„<<LT1g..,H.RxA,T.T..x<NLt.,,.o,1.eaw<.<w. •P =y m VERTICALPENETRATES A HOREONTAL OR EIRE PARTmorv.oRAs ou OTHERWISE SHOWN 014 DRAWINGS. INDIRECT WATER HEATER SCHEDULE aurarw ...may RECOVERVOINOERE.RIZE ery FEE xa eweR xenw<w weTwt mamma wx R m mww ww eI< c <ueee E.ALL DUCT JOINTS TO BE SEALED IN ACCOROANCE wm1'sMACxA HIVN� STANDARDS ARO ACCEPTED GOOG PRACTICE F.ALL MCI'DIMENSIONS SHOWN ARE NET OPEN INSIDE VALUES. o DIMWSIONS NM, WH-R eR 266 1E0,000 3 y-1/R' LOCHINVAR SITO NOTE-1 BE CHANGED SO LONG AS-IRE NET FREE FACE AREA IS MAINTAINE BLANKETWall ALUMINUM Ora-INO OP 1-1/V LINER. T"4ETA PBRM E''''RSR. W ALL SEAMS SEALED H.ALL SUPPLY'AND RETURN DUCTWORK 13 FEET DOWNSTREAM OP TUE ss OALDLOT UNER WN T oRNxsaSvw cxoreD Dx THE DaAwwOs. BOILER SCHEDULE CC A(«NOECTIgAISHABLBEscH6DOLEmwcPIPEwTRIrS FNTJOIx.. !MOMENT. wmae a ewE__ Wlwwcmlwl L ORROXWA«we<wES CO ROUTED TO NOTE-1 0 B.HVAC CONTROLS FLOOR aMAN,rsoca MAN aLaLc INDIRECT ONio WIRING AND 1.PROWOE MNOWMELT �wnA mm,a.l Ieu�cHn ew Bwxwl aw 1Ro/150 RAVPACKXVERS CO6L MNlVU RESET, Et a W a ELECTRICAL /TOTAL HNGTEMPEaATURE GGM R�EoNo��;,ENE°Wa�1vNGKr��L�"a.,IT'l=R71 ooER NS E,Anax',a oa�o1TRNo oR7' o B. Drvi iGaPDa ino wDN DPW MxRPDa HHx«NrvaTn'AL AIR COOLED CONDENSING SCHEDULE in ,0.Fps SOPPORTS RD `°N^`< <eFA<m Lm7 w...<R x ..., esursow.<ReeweL <Piconueeecess CO a SUPPORT PIPES WILL HOT BE PERMITTED SPACING OF PIPE SUPPORTS CU-1 PC-1 3 3/8 7/8 230/1.0 21 3.5 DX17V55381.1, NOTE-1 SOPPORTED�ERv.PEET.SHALL NOT EXCEED a FEET FOR ALL PIwx0.Pl„STmPIPING To6E 3/5 7/3 - H 24 ,GASA. LL BE SCHEDULE 40 SUCK STEEL PIPE WITH MALLEABLE IRON ,.PF,w,<E,.,,,,xwEE�wa SA<,w w mN..,,e,E<SEa<IB<.L,Kww W x. e,A.< EBE.. .wFA�:E<..� N,x. 35 ouKlN aMxs36Rnrv0u NOTE1 CO L W.G.UNION.WS PIPING CONTAINING PRESSURE GREATER THAN IV SHALL BE SCHEDULE NO BLACK STEEL PIPE WITH WELDED JOINTS. HUMIDIFIER SCHEDULE tx.WscELurv[ous r wiwEXT MO. sem. Lamm Ou,wT lwwal Amps value wwFA<TUlm wmxw te won nce<weeOF OUTSIDE AIR INTO CONDITIONED SPACE COORDINATE INSTALLATION OF ALL ROOF FLASHING AT POOP P.ETRATION. NOTES: B.00 HOT SGLE-.IS DRAWING FOR IXACT DIMENSIONS. 1,PROVIDE WITH EA.C1-1 HUMIDIFIER DUCT MOUNTED HUMIDISTAT,OUTDOOR AIR RESET NIGH LIMIT SWITCH DRAIN PAN STEAM TUBE MTH SAM MANIFOLD. CONDESATE TUBE.DRAIN.ETC. ITEM IN ITS EXACT LOCATION.TIE EXACT DIMENSIONS.OP ALL TNE MOOR,REVEW DETAILS OF TNE EOUIPMENT. mums.so. sox moms lakxurAcTuRER Emil ornomusoneeoRee A KRUEGER PER OWNER NOTE-1 A SEALED TYRE WRITTEN REPORT SHALL BE.131,1ITTED TO THE B 12"X30, S8OP KRUEGER PER OWNER NOTE-1 ARCHITECT/ENGINEER FOR REVIEW AND APPROVAL. ,<.GUARANTEE iwOt NATEWrtHMWMINGTYPE `"ANONMSH FEE wmER. / DURINGA.MATERIALS.EQUIPMENT AHO INSTALUTION SHALL BE GUARANTEED FOR A PERIOD OE OHED)YEAR FROM DATE OF ACCEPTANCE.DEFECTS WHICH APPEAR THAT PERIOD SHALL BE CORRECTED AT THIS CONTRACTORS AIR BALANCE CALCULATION rvsHIPoawiHE PROJECT: DATE: WORK OR EQUIPMENT FuarvisxsD,wwoa INSTALLED BY HIM R EQUIPMENT BEXHAUSM AI OUTSIDE.. II BATH FANS AT IDLE 252 MAKUP AIR THR0UGHFC1 250 0 K_ J !MHO: 20-102 DRAWN BY: BCE AS SHOWN SHEET M3-1 Page 28 of 44 r.«.o a.°°>°° ° .nAEA r J Q Q Q Q Q VS Y Y Q Yo c 1 1 1 1 1 1 ,w` 1 ...-- ' 1 1 1 tiplY: Z 1 1 1 r H� 1-------- I— H a la ) I i Ct o ° - - - - - - - - - - - i- - - �° ° r - - - - iw o ,r 1co � — - - - - - - T - - - - - - - . - - - - — - - - -�— - - � H a i '1 I CO I 1 ' w �� 71- 1 1 j 1co (D— h - - - - -I- - - -- —1 - - - - ------� r F 1 --_ I - — -0 _ i___ I_____ J_ �_____ �__. 1 1 1 1 __ T_ 1 b b b b ;-- ---------:----- b b b b r EA. 00011zou DRAWN ire BCE ® MECHANICAL-CRAWLSPACE PLAN SCALE °° FIOWN iliMPER MIRTH Page 29 of 44 Ei5.1'72:7:iW: FLAG uurEs. .77:;12:475.752 FAVEZW===igrOP Rzuz=s;rz eamo,FLENGT I is ovER as ' Eir==7O ini=r7:=IMMT _I T T 4) 4) cr) ?I T 1 1 1 1 1 1 1 1 :1i ill I %tip I A 1 F.8 g I o'Zs 0 Z ....., 0--—,- ..A..E 'Args,`,"A r--EF0201 — I r 1 „c.„,,c . I-I; M M. • _... 41 1 1 g II ] \non eI ' vls-w -----"Iram• . — 1 , 0—/— --11 CII. 1 IAL- pi ST=.1 :2,,,t,t 1111 A, \ ;soma co,,,„ ,--r-A. -, TYPE A ' 6 _ III 6 1 w ilII 1 I rI Mfill — INININIPMENIPIIIMPIII Till 0 - 1 a w I Li V' . iii w g i ,_ _/-8 awor wow' c., T {1.•TE FLUE IWO in IND.IL1 i 1 PE EIRPT ON S U X EVPS E . ,I Z IMI 1 I IT' co Li - -0 & 4 LTNTISC'EPP% I H (<2 Li FC 01 EF 02 03 '01 1 < - I ILI.,,,..., ...E,.— I' hi Ill . PROME WITH (:=) 7t OrNe.'''''''' I 1111111FM1 _ co _ — l . 125 LFI11 in TypE, r —o ,„.,„ a — F , 3 , 1 0-00 , A I 1 1 1 I I I I I 1 1 I 1 I I 1 ) — —_ (iv MECHANICAL-BASEMENT PLAN MAMMY ... PS SHOWN SCALE 1 4,1 d SHEET KNEER NR7/i1 M1-2 Jy,2022 2 NM, Page 30 of 44 F.)..F:14:47,77:272 ar=r4==trag EturpEEEL:=7-0 I POLITE LINESET PER WM/FACTURE.RECOMMENDATION 2 9 9 9 9 9 9 T 9 r-5) 9 rii I' I I I I ! I I t I.Li ! ! ! ! ! ! I ! 1 ! 1 1 _I-I i_ i_ L 1_ 1 1 1 1 I 1 1 Wie41- 4. ! EF 02 04 1 1 I 1 lit6.-dirlaTeri7T06---- ' L -0 T ie: t 1 ' MIMI 41111111151 Ns -111 SNOWMELT i'1 T1 iti -----''=°1-=-------- 1 II 1 ...... .g] .rr 1 _ 14 UM FRE.AIR \JP,0 n. DM, POWDER.MD . Pile; g BOILER . LNING 0--/7 illEP TAM i LI- TYPE A I 125 CFM <>1[1:4 111•111 1 1.111 _ i H 1 2 , 1 7n. 1-15' -AIH.--ra- , ,.., ...,„ 1 ,.AiMliTill - SNOWINELT ,, E A ill 1 'FO'R'L=ITT 1 H 1 T;OTCF1.1 I I 15 CI)1 'TM low 41 I 1 UNDER I 1 CAP Ci PLEP r 1 AREA SEE L'F°:::::ET ' • GRAYEL viumm I. ill ,FgarATZ'' : CCI 'nu_ ` i o -1 A HISTORIC eArlITI LE _MIMI U) PA' nffil 1 :Ti Z-111Fam, 1111 EF 0 I 1.-'. - Cr) 0 N- & IL 1 12) -II- _JO I a ' L 1— ' 1 1 . I MUM,REVIEW I I I I I J-----I. I I , 1 1 1 1 1 1 1 1 I 1 1 DATE 000112022 rift' MECHANICAL-MAIN LEVEL PLAN HOWI-1 M1-3 Page 31 of 44 2 VS b T Q Q 4 P b Q ��� I 1 1 I I I I I '"a i I 1 I I I I 1 1 o>w ADO TA o- + - - - - - - - - - - - - -a- - - - - - - - -i- - - - - - - - -- - - - _ b - - - -0 T =- war/ 1 1,1!;', b' EF0205 lit EF0206 1 1 a — — — — - - — I I C WiWMrrIIYY�'�� v7 . H r -__ FaEa M W 1111k111111 s o \ 02 — �Iw�iii1 �.N.. .00MEh p (�, o (2 �,, ww — W cc in 0 I_ WIMPal kin : ill i --I--- __i-- Y H 0— rt — — — — — — — — — — 1 — — — — — — — C— rt — — — —J— — — --------0 .„.. mo 1 1 1 1 1 1 1 b b b b b b b b b b b ® MECHANICAL-UPPER LEVEL PLAN "`" ��" MI-4 Page 32 of 44 2 VS ii 1 9E9!O Ne o= m Pi@ i C I? Q Q Q Q Q QQ Q 06 C E.// �w 1 L PROBES,LINE I I I I b I I € °m o- � — - - - - 1 I I �. I i L - - mo o 7.07 �a m uses moss - sucosy XTERIOR.VERIFY USE a�.o E.� g_ 0 aTM���"aPowTM" w LLI I •• " I l VV ac o-- i e 6T,HR TaM - _ o o ° ,E�,��,�oN. — o�o 0 0 0 - - e - CPRoRE ��.. e 'P - zFPE E.�n� Q K WAY AIALSW V N 3°T.S. (DATE ISSUED POI, -Rosa..,. r I I i i I b b b b b b b b b b b 10..010, BOP ® MECHANICAL-ROOF PLAN 99 sown scum mcum suss.: "" mums M1-5 Page 33 of 44 GExAETUBxGNOTES r w TUBING IS LB'HEATH% SURFACE TEMPERATURE.3, vxoIDBANNmua N-,SixSDLATION UNDER SNOW.LT SLAB. 2 VS 17 N o U C m @ ,.,x� uRNEx 3_ a w 41. w TTI AIR SEPARATOR _ •Now,.evT NAw OLD :4 — — ,xowuBL MAIOLOLD i4 re '' sB �$ p1n Lg u 2 T. Ol „sue sx� g y c AIR VENT CO m LUSOSREOTN-.E,PINGE.00T v.� �`u sNowNE,r,000 TvvICTL Sxown,uT LOOP,rrvicw SNowNE,Twoo TYPICAL BxvANSioxru=N� � da sEw_.FDRERwnoN. SHALL re aFAN<, 6 E W DG BTGPEB TGxANDN xrAxsxD �T Tx , XO'Z xT,Dv B INDIVIDUAL BD�x<x<DLATDNVCN <, �N'E n TMBBD�<Dx��Gx II TO DRAIN STA DwxR:lIERBTDRDxiNDRSTC D CO WATER OF,GOIREAnPCP CONTINUOUSLY or CtlLFRMNFO„ NGGMO " G. DEMANDSIGNALA~DDVBN„ETOMEET.ANCOIL Fe Et TMERxDN NR re W g RxxER 0 AIR VENT TORAUNCSERAR iATDR r W o • , = o W '''. 0 NNR rs m a — re R, Ia e co w I -D EXPANSION TARN o . _ o DDNE C D WATERN— CAL ING VALVE o �„ _i 0 iG SOURCETO -:' AIRY s,�ANsIONTAxN © r el © yam,r ii,__E__ __,...6—c121-6,--,—,01--,' OIVO3/2021 REVIEW �.OBDD�s�«xGSO�D,xmsD N.. IIMOM WE. ,© cU Q 'Y I cU 1 — DDN0 1 GLYCOL FEEDER _\ l OONESTGGOOwATEB AW — 'G° �NI G°vN _�J �NI BUILDING HEATING BOILER PIPING DETAIL r SCALE:NTS NOTVINAL TItUrul SHALLDE WITH SOLUTION OT K_ J DRAW., BCE AS SHOWN SR.M3-2 USE THE GRIDS ON THIS SHEET TO LINE UP YOUR DETAILS.SETS OF NOTES AND ALL OTHER ITEMS PLACED ON THE DETAIL SHEETS.A DETAIL CAN TAKE ,.N.._.==.eemv^ MORE THAN ONE SPACE IF NEEDED.LINE THE DETAIL TITLES IN THE NARROW SPACE AT THE BOTTOM OF THE BOX.THIS NOTE WILL NOT PLOT. Page 34 of 44 7.7 DETALTxE=IEET R MAIN �a.. nIUI G °`� 1121204 �� VANES w BRANCH r 1 DDDING �aa w SHOWN w DNH D DFxGxxDm " �osEawUSxT IMP ELBOWS ARE EXHAUST v:-• •.���IZ=M.EK o"PuNS ON PANE SCREW ROUND BRANCH TAKEOFF MR • /o ,pi R ELS ARE SHOWN TYPICAL N BRLI ER DAMPER MIN AIR INTELBAKE •,• DIµPJ °E ROUND 45 CONNECTION SQUARE 45 ELBOW ROUND `'•=CROW SQUARE eD ELBOW u: E" ACT f';,,- TURN JFINISHED CONSTRUCTION OF0.5BLBOWs CONSTRUCTION OF9DBLBOWS 7 RV 71EI -IIIC i■ ANE SHEET I BRANCH i o 0 15 CONCENTRIC WALL TERMINATION ,�l, xDDD Dr "° Mo"°" "r°" f W INSTALLATION DETAIL J°xo..DIX°�� OF BRANCH TAKEOFFS FROM a rv°r MI Duct TYPICAL VOLUME CONSTRUCTION OFBRANCHTANCH TAKEOFF MAIN (tlipv_ TYPICAL RECTANGULAR TRANSITIONIRCAL RECTANGOSROUND TRANSITION * 01 W(TYPICAL FOR HIGH EFFICIENCY GAS FURNACES) i W'�ULAR , p Nxl §g o 1DETAIL OF TURN VANES O^� V m DETAILS OF THE LOW VELOCITY DUCT LAYOUT F o L NO sco,t "q rc rn W,�,„, -a ai m C$yyy:;6e n L e e° �ee�®� II rur ROOF aa _ 0 O. ':X:i' M ALLnaoUNo�'•y��i RASING CURB ROOF LOUVER AS SHOWN ARCHITECTURAL 12-MINIMUM —:•,2 PROVIDE LINTEL OVER.II► Ex�o GEWD SNOWADGUM,ATIOx lABOVE AVERAGE I! °Co,` 1011=- F Nl ► w D DGr a EINT K �W �I BxFFrMFr.LsrR P ��� Fµ a // w DD�R CEILING EXHAUSTFLUE '1\ COMBUSTION �^°eiW� $ ,� �h ~ II BIRD SCREEN 4- CLAMP t •�I ° �' �I µCol NneW TD O nII II CEILING EXHAUST FAN DETAIL ; P o411.01 MOTOPUEDACTUATOR ! N rro SOALe RwsmN6. , F R li �� 'FRS w ceN � ,, CONCENTRIC SLOPED ROOF L" `` o e, coryNaLB� Y :;S TERMINATION INSTALLATION DETAIL � 111 . � F" W O EXTERIOR WALL (TYPICAL FOR HIGH EFFICIENCY GAS FURNACES) A � W NJJJJJ:':p) Nis � J Z j OO��OJy ... = Ego WALL CAP ORF Q m a �� DAMPER " I II a H a MOTORIZED LOUVER DETAIL NOT TO SCALE ar- -/, is��� �� ` N 0 Q 0,- GRILLE CEILING DD-Gr �roR LLI 71- BATHROOM EXHAUST FAN DETAIL HORIZONTAL FAN COIL UNIT WITH co -SIDEWALL DISCHARGE ATTACHED HOT WATER COIL DETAIL FAN GUARD MOM2021 REVIEW .. CONDENSING UNIT MANGE ORDDGImCD MANUAL SHUT OFF VALVE II RASING \TEST GAGE CONNECTION TO D� ARCORO-DON!.CNDAIR HANDLING UNIT OR tC�->>>) SUPPLY 0 Q SECTION aL �/' DxNEO ON TAPPING ACCESSIBLE FOR ROM BE INSTALLED TOTHEAPPLuwcE. JII .::,.THE GAS ' II • _:_s II ADAPTOR-I ii1 Ae .4 AMP .. .�—`E. ��,. TO CONTROLS =IIi■im• in. SUPPLY FLUE NwG PIPE ��� COMBUSTIDNAIRN E �Il�p TO CONDENSATE TePDMP T ON 1 REFRIINSUUTLIGDID LINE 171 MF IIi1 li •aJ N MDIaRE 4 D NN PLUG DID..D W.FILTER DRYER CO�;OL POWER AND J (DRIP LEG) CONCENTRIC FLAT ROOF CONDENSATE DRAIN DETAIL AIR-COOLED CONDENSING UNIT TERMINATION INSTALLATION DETAIL NOT -SLAB MOUNTED AT GRADE JOB NO 243 102 (TYPICAL FOR HIGH EFFICIENCY GAS FURNACES) xraDRAWN BY ,o, GAS CONNECTION TO EQUIPMENT DETAIL _ AS SHOWN SHEET NUM NOT TO SCALE M 3-3 Page 35 of 44 1, DO NOT REPRODUCE THESE DRAWINGS AND SPEOIRGTIONS WITHOUT THE EXPRESSED WRITTEN PETSAISSION OP THE DESIGNER THE OPAVINGS MD SHALL RENISIN DiE PROPERTY OF DiE DESIGNER WHETTER 11.1E PROJECT POD DNIOS DIET ARE MADE. EXECUTED OR NOT, THESE MEDD. AND GENERAL NOTES: SPEODIOPTIONS SH.1 NOT SE USED SY MTG.ON FLAG NOTES: ANY OTIER PROJECTS FOR WINDOW TO TWO PROJECT BY OTHERS EXCEPT SY THE EXPRESSED WRITTEN 1. DRAWING IS DIAGRAMMATIC IN NATURE.LOCATIONS AND SIZES MAY VARY DURING FIELD COORDINATION&INSTALLATION OF 1. ROUTE LINESET TO UNIT PER MANUFACTURER sEusswxarmsDEsiorvErz. MECHANICAL. SPECIFICATION AND LENGTH. 2. ALL DUCTWORK SHALL BE INSULATED TO MEET IECC AND LOCAL 2. ROUTE INTAKE AND FLUE TO MANUFACTURER CODE. SPECIFICATION. 3. GENERAL EXHAUST TO MAINTAIN 3'CLEARANCES FROM BUILDING OPENINGS AND FLUE EXHAUST TO MAINTAIN 10'CLEARANCE PER CODE. Concrete Wall/Window Well wall on o CIn N B 4 Move Boiler Floe and Fresh Air up Me hancal Chaseq ° � c togoN• I I q cn j o c Steeplechase Constr ction ! Inc. ! If/ Y LINE w N LO `-' I I a os O L c _ I I SETBACK I _ O O N CI— �_—_---_—_—_ A QS C O mom m c a u r l m m o L v I \„m(7a \ Or Lre ``` 18"X12" C H 18"X12" 18"X12" III w O ? w o j� rillt LLJ RL , w a 0 i� 1 6"X8" AKEUP rc O , k 7"0 FANTECH 1 a 14"X8" MUAS1200 m 111I rcr 18"112" ® ) o 1 7•0 6"X6"FRESH AIR- - - - - - - - - - - - - - - - - - - - - - I - - - - - - - - < m TL � Y °1 I—L c t ' W °0-- � �1 Jz L```� 16"X12" COW LnLJ LL CC �_________— 1 _ L_—_—_—,—_—_—_—_—_—_ I 1 —0 U) II DRYWALL I W 2. ALL DUCTWORK SHALL BE INSULATED TO MEET IECC AND LOCAL CODE. 3. GENERAL EXHAUST TO MAINTAIN 3'CLEARANCES FROM BUILDING OPENINGS AND FLUE EXHAUST TO MAINTAIN 10'CLEARANCE PER CODE. IT- C X 0 cill) P aB P P O P U I In this mech chase we ha'e 811 fireplace, borer flue & fresh air 2- II for lower evel dryers i I Ill I I I I I I I I I I'll I SNOWMELT I I I I AREA SEE I A __,_-_-_-_-_ - I I I I FORIAVOIIT I _RR A LANDSCAPE AIISET CKowe/ f�� VT v -----� III III O r I T]6"0 TYPE-A _ TYPE-A 4' TTT13ELEcTRicBEjTFans8" ,■%�I l S- I \ nd RI IIII „� �. f : - • _-_-_-_-I -I_-_-_-_ g � L �ia� x14 L�D B �OM2 0 j , 7 - BEDROOM 1 !i - -T,_g - I 1 �i 7'O �� �� :. ;.; DYLAN) rE •,.g. STORAOOGEISKI TYPE _ W a I I 002 � s�� LOCKER . BENCH L ' LO2 I I I L_ _ 7"0 ` 1a�xa^ �� -' ` I RAT F I l z �� 20"X10" -cc' TYPE-A , MI � E I UM II I 11 w ,_ j �1 18„ (--- I _I 1III s-yI-°Bq I, ______..... A I 1 A_C EP 1 1 L� 8"NIII 6.0 ON j L` 1\\\\ II II GALLERY r j } LAUNDRY V 6 , , m _ Bag _ m 14 FRetu rn I m — — — — II p H L I �/p�� • RO` D Pet,,, „ _ I\ 1'"II�IIgilki Il1j� I II 0 -t--------- -7 I •./ A !- ll O +�'- 1- - J 41.: :,. ' ---------r--------® 1 E I 11 UN'CHIEVABLE I �� I z> i 11 �I _ _. ,r-4 -_ 1 �' "" r 11 II SNOWMELT CC _-_-_-_-_ 'I �� AREA SEE RE Re MON r ELECTRIC 1 o x 1 o LAN SCAPE.. - ------_ I CC 009 y HEAT MAT I Q FOR LAYOUT -P—-—-—-—- 1 ROUTE FLUE j -UNDER BEAM ' = L I1 1 q� BATH 3 I - 11 az x6 Retu r ,a16 I Retu . j PROVIDE WINE LL ( �) j GUARDIAN MODEL:TTW018. / i� I p _ _—_—_—_—_ _� PROVIDE WITH ,� 6"m lar�i)ll'� _—_—_—_—II —iii : _ F CONDENSATION , Bove TV IFEBHC ov I013or ITYPE-A _—_—_—_—125 CFM j " 125 CFM I j +._ _._._.- _Q__.-I--__._.__-__ T_.__._._- I SETBACK DA 08/0; /`F.l- -_T_-_-_-_-_-_-_7_-_-_-_-_-_-_-_-_-_-_-_I-_-_-_-_-_-_-I_-_-_ _-_ _-_-_-_-_-[-_-_7_-_-_T_-_-_-_ PROPERTY LINE I �'� PERMISSION Of r.DESIGNER.THE ORM..MO GENERAL NOTES: FLAG NOTES: 1. DRAWING IS DIAGRAMMATIC IN NATURE.LOCATIONS AND SIZES MAY VARY DURING FIELD COORDINATION B INSTALLATION OF 1. INSULATE DUCTWORK TO PROTECT INTERIOR AGAINST MECHANICAL. VARYING TEMPERATURE INSIDE DUCTWORK. 2. ALL DUCTWORK SHALL BE INSULATED TO MEET IECC AND LOCAL .xr ay OTHERS EXCEPT ry THE EXPRESSED MITTEN2. ROUTE KITCHEN HOOD TO EXTERIOR PER MANUFACTURER CODE. SPECIFICATION.INTERLOCK HOOD WITH MAKEUP AIR LOUVER \�xx+arwos+xEOEraxrn AND MOTORIZED DAMPER. 3. GENERAL EXHAUST TO MAINTAIN 3'CLEARANCES FROM BUILDING r 3. INSTALL UNIT WITH HEATED PAD THAT ALLOWS DRAINAGE TO OPENINGS AND FLUE EXHAUST TO MAINTAIN 10'CLEARANCE PER PROTECT UNIT FROM CONDENSATION BUILDUP.ROUTE CODE. LINESET PER MANUFACTURERS LENGTH AND RECOMMENDATION. 4. ROUTE LINESET PER MANUFACTURERS RECOMMENDATION. U o 10 d•Ao_co� N O a /� mU� U 16 68 Q T L°J O C T V1 co L C N N Line sets beside !each! C/U ! a 2-4 dryer vents low - - - - 1 ►1 pca i Q"_-hood vent does nab _flue and fre k� i dove RTYLINE �__, �� w �«_ __ 'er burif =fr ptec r- l •penetrations within 3 �• in TechI I . chse dryers ®� ®� �e� I �� o 7, • R ,i. ,ow fixed or otherwise. Please advise °� 11 CD- �_—_---_—_—_ -. _JNIIII— -�• 11 -•_- _a__.� -_ A s_ ,II�TI ! TYPE-A — !-- — I , n� '1�EETEACK _1I— I__—_ _-0 OON -� 1��ilY �200CFM ��W�� 1 m�� p_) ��1®®® m ®I ` SNOW ELT m ® �� ARE.• E • • 1i �1 ��. . = it III III L. -� ELECTRIC I��I 1�� 1 •-LAVO M(�O HEAT MAT IN II ENTRY, 1 INTAKE FOR I POWDER,AND 8"' I`�1' 30" x BOILER , �- I LIVING. - ,'�+.r ' VER _ -8.., Lry� —© - • N�a _,--.---.—N.1 �,_I i HHM 5/15: ���Il[. ��� ��N, ' BHE,PLEASE 125 CFM III ' N 1 00 CFM Pe� —_O(_ IIIII I ��� a����1 ® I ADVISE-CAN THIS H SNOWMELT FREEZER 125 GFM 40 AREA SEE GO OUT AT GL-5? W/ rill �1 I g aa°NNER A I KITCHEN OPEN TO BELOW A LIVING R0ONRESH AIR 1.1 4 AT ` ApE II VENTURE 6PECIALE w 11 " NT PER I ���11P�I p�_ �N�B�1I� FOR LAVOUT C�p GE rc III III IU2 ��� NDFADTURER �III■1111��RII,II!!lll.11ll.l , I'�x' -I �,. c2 """MIN "_" - 8"0 1 IIWUVIIIW�� uil SNOWMELT I- TYP&AFICE B ® _A FG2 UP L'll/ AREA SEE H 125C NN1 C_ �/1 TYPE-A x �a -LAY01 `/J B` ® 200 CFM , _ If I III 1I ESTIBULE 1P 6" IN 411 I O o TOE KICKS 1 IIIII 0 III y UNDER TYPE-A I 1. ______ 6 ease awl vie e F 3 location w g CASEWORK 125 CFM 3 I , k 8.0 _ I O HARD 1L. _ � J z ,_ 11•_ AM���_ - - I �� r� �� TWORK _ _ ��II��P�U� I TUBE IF I M a ® 1 I SNOWMELT I ��I�I ,,1 1 1�1 r^ _ _—_—_—_—_—_ ---- ® HISTORIC ENTRY I,1 4- I I V' I AREA SEE Pow ERA^• •'1. —_ CC': v, o- I'°° FC 12 x • db t fit IIlr cn _ fan h HHM 5/15: Q - TYPE A i 110"X10 1 W II 1zscPM i 1 BHE,PLEASEin ceiling. Please advise ADVISE-CAN THIS o- LI I _j USE EXISTING zspcFM WALKWAY I .�<....v > OPENING? CO o- `1, 111, _ I �� C) it CY 1 I EE -- - - - - - -.-.-.-.-.-.-.-.-.-.-.-.-.L-.-.-.-.-.-.-.-.-.-.-.-.-.-.-.-.-.-.-.-.-.-.-.-.-.-.-._ SEE: I HHM 5/15: SETBACK I I ROB-CAN YOU CONFIRM ATE: ISSUED FOR: SPACING OF FLOOR 08I03I2021 REVIEW o- I JOISTS?STRUCTURAL I •.Ill I OT/OB 2022 CHANGE ORDER 100 CO 1 1 SHOWS 9 1/2"TGI @ 16" I _.-.-.1._ OC -.-.1._.-.-._.-.-.J.-.-.-.-.-.-.-.-I-.-.-.-.-.-.-.-.-._.-.-.1.-.-.- -.-.-.-.-.-.-._I-.-._. I 1 1 I 1 PROPEWTYLINE PROPERTY LINE 1 1 I 1 SIZE TO CAN FIT WITHIN ADJUST FLOOR JOISTS? 1A 7b 7B b b f9 I1 b b b b DATE: 04/01/2022' JOB NO: 20-102 10)1 CHECK MECHANICAL-MAIN LEVEL PLAN CHECK D BCE ED BV: BCE SCALE:1I4"=1'-0" SCALE: AS SHOWN SHEET NUMBER: NORTH M1-3 July 25,2022-2:56:28pm T T T T T T T T - T I II II I I I , I -.-._._._._.T.-.-.-.-.-.-.-.-.-.-._.--.-.-.-._._.--.-.-.-._._._._PROPERTY LINE .-.-.-.-._._.-.-.-.-.-.1._._.-.-.-.-.-. .-.-.-.-.-.-.L.-._._.-.-.--PROPERTY LINE.-.-.-.-.-.-.-.-._.-.-. .-.-._._.-.-. .-.-.-.-.-._._.-.-.-.-.-.-.-.-._._.-.-.-. .-.-. I I I I I , I ® ! VarluospIumbih ' 0_ 0_ w , , ,SETBACK , �- ---.-.-.-.T.-.-.-.-._.-.-.-.-. ® I_ _ _ __ M. - __ _ -.-.-.-.-.-.-.-.L.-.-.-.-.--._.-----.-.---.-.-- -.-.�.-._.-----J---SETBACK -- -- +• a_-_ O M . 0 � � . . . 8"0 DUCT TERMINATION Vents ' THROUGH ROOF WITH SLOPE CAP 4" 2" 4":12" hoodvent . _ SLOPE SLOPE BALCONY TI ® 12":12" 12":12" j 12"FLUENENT TO a I ❑ EXTERIOR.VERIFY USE O ] OF EXIST CHIMINEYOffice F/P 13;;2";2" 0;;2";2" m a 1> 0 8"0 DUCT TERMINATION SLOPE SLOPE 2-8"FIREPLACE FLUE N w w THROUGH ROOF WITH 0 M CAP 13 1/2":12" 13 1/2":12" VENT.VERIFY USE OF w N of :' o9 . 0 . c 0 EXISTING CHIMINEY VIP0., Lki N - ao • rn O N O N O N Living Roo / here or ,_ :,.. O N O N _ _ WALKWAY w „,_, j M I I O N O N O N O a M co M coco N N UP i F8 0 FIFROM MAIN LE FLUE. UP gg ❑ ❑ o ❑ --_— FROM LEVEL. VERIFY SIZE WITH UNIT SLOPE SL APE -—- O ❑ 4 ❑ ❑ ET.SIDEWALL - 131/2".12" 131/ .12" } o TERMINATION. I o TERMINATION. 0 0 0 0 SLOPE SLOPE o - 0 0 O j I / 13 1/2":12" 10 1/2":12" j a EA ® o n I 8"EXHAUST TO EXTERIOR. 6"0 DUCT TERMINATION Up / = VERIFY USE OF EXISTING THROUGH ROOF WITH o BALCONY !��//FROOF PENETRATION CAP FROM DRYER 6"EXHAUST TO EXTERIOR. VERIFY USE OF EXISTING = CHIMINEY 3" Plumbing Vent = .. 1::1 --- WALKWAY GRAVEL WALKWAY \Existingdryer vent 0 V N _._._._._._._._._._._.__________________________________________under_� v_e____________________________________ o SETBACK ---- 0 -.-.-.-.-.-.+.-.-.-.-.-.-.-.-.-.-.-._I-._._.-.-.-.-{-.-.-.-.-.-.-.-.-.-._.-.-.-.-.-.-.-.-.-._.-.-.-.-.}.-.-.-._.-.-.-.-.-._._._._._.-.-.-.-. ._._._.-._.-.-.-.-.-.-.-.-.-._.-.-.-.-.-.-.-.-.-._.-.-.}.-.-.-._._.-. .-.-.-.-.-.-.-. -._.-.-.-.-.-.-.-.-.-._.+.-.-.-.-.-.-._._.-.-.-.-. PROPERTY LINE 1 1 1 1 1 1 1 1 1 2. ALL DUCTWORK SHALL BE INSULATED TO MEET IECC AND LOCAL nvu 1=vn•mn annnwi 1v imnivn.it Lmiv.ain iavvan au `r. aorvarmeoexxev. J CODE. PROVIDE UL BOOSTER FAN. J 3. GENERAL EXHAUST TO MAINTAIN 3'CLEARANCES FROM BUILDING OPENINGS AND FLUE EXHAUST TO MAINTAIN 10'CLEARANCE PER CODE. m M O_ Ir OCV ci T O T (4) 1B I D/ I b / 1 tl) 92 L 7 7 Y Y p0 N This isthe shower. Fan Will need to ; % I" LLI tLi ,To i____________i_______i_________________________t be rdv �l #o wales ! ! i___ ________i_____________i__, W Power Vent on existing ° To '^q� p LBO - _. � 11 , UO3 U netratioin r' Rec Room VPEAirMI H^q, N o-_ _—_—_—_—_—_,r_—_— —_—_—_— _—_—_—_—_—_—_—_—_— OO CFM ELECTRIC �_+_—_—_—_ U O^ 2 ii M TER BATH C C Fireplace ,205 L 1 I 1 ' -Eli 7 col 1.1 ei I I I A I I I _ III ---- I ,' I I I r I 11.11111.111111_ 1111 e, am willow* O 19. YPE-A�w � 200 CFM �•y�'� ® �� ' ENT PERI MANUFACTURER ll �_- �� MASTER • BEDROOM iIIii �I: 204 = I J ■..�,y Build cover 10" vet \ Cl)/' ������II E� OPCF �r/!� �� I HEAT MAT GUEST BEDROOM ;III VJ ELECTRIC ' • I I v,iIiII///`` I h� zos III O !I /I �/ fit sit / • V� I TYPE-A 'III in Q —�—_ - ,ill I I , (I(I from o • t ��i �C i[. re �� 200 CFM �J --_ 0in 0 txisfingl-list'a 1orth V� , i ' • to 1eUa. Q 1 0 M -50CAill O �� I \/ U rlca chimney ,DD SO.IN. 2-8 MI I w FREE AREA �I I-�11 in _- _�!— _I _L"1 I I Z dot bienou � h fon anythin �r► �i►rl�_ <'�; , .��' 'I'I�. "'� - - - o LLHI Cl- other than 6 /8" 9ffice LAUNDRY �1 � Ac e s for FC 4 MI to �e � e,,�� GU IS OBAiH ®-i CC a I ' HHM 5/15-SHOULD fj r c� - - ��� �� here I BE REVIEWED WITH a n_ 0 1• w ELECTRIC _--- �} I I� � HEAT MAT p' � _ _ MR/INTERIORS--OK i i �1 � --7------------------- I - FROM EAD •�_——__�� --i------- M i STANDPOINT r - .- .- �r�-r�r- 1 -.T -�_r_�_ . -___-__._._.-._ _ - - _ ~_ -_,------- EE J I A cess to C 5. Do we;walk over the duct to {siervic- T DATE: ISSUED FOR: I 08/03/2021 REVIEW 1 07/08/2022 CHANGE ORDER/100 CD o- rt L. — — — — — T — — 1— - - - - - i- - ran c of f tsi-t his-ctoara nice ad ate-to T arnove - -r- - - - — — — —0 _._____________._1_.___.___.l__.___.---.---.---.---.---.____ _.______._______g__ tau-_-_._-__-__-__' I replace fart coil? Pleas advise. 1 I 1 I 6 15 b �p Y ® 0 / �l HH 5/15- BHE,PLEASE ADVISE ON CLEARANCE, ACCESS REQUIREMENTS Certificate of Accredited and Traceable Calibration I w Laerie,Inc.Issues this Certificate of Calibration to: Certificate Number:188589.8070 °an JEDI Balancing customer Purchase Order: e calibration&nnetrology services 568 Briggs St.PO Box 525 Erie,CO 80516 Calibration Type: CAL-2 NEBB bD .E O'5 ,-8,"5 "5 $ For Asset This calibration is traceable Co the international system of units(SI),through National Institute of Standards and Technology(MIST). H ,= O. & l' Hutchinson's method is used including Guard Banding and TUB Strategy,False-Accept Risk normal distribution and 95%confidence level typical with coverage factor of 2. fi l= 'a' U 44 a a vk .accepts and understands measurement uncertainties and risk assessment in all measurements involved a calibration. e W CI @ F V h li i, Manufacturer Serial Number Description iii" I°I.min., 1tl-1..,1 Z1 5 _ _ J �' m F 71 I 71 l71 V I Nidec-Shimpo MT-200 B175B5015P Digital Laser Tachometer 3-May-2023 12 3-May-2024 U # 'S' o 5 E L j l I a, C-Procedure As-Received Physical Condition(s) N y" .`�+ I MCP 73.4°F t9°F,40 to 65%RH 0 AS-Received Annual maintenance performed,nominal exterior cosmetic near,exterior cleaned where pestMe. ], m A e d Calibration Event initial inspection PASS. W o rG S ` o $ 2FL:NEBB Compliant Calibrator performed published data no adjustments required or performed. p F m m m m B cci U v d '� 5 5 ua m_ e, c Prii -♦Reference.,Traceuhility Number Used in Calibration e — .'«.— oo.. e g [)p, u U REF vml Cal.Qe oar, Description REF rsa Cale Sea- Description J �C F r^.,7,if R m w ,` ` G e L E' I . 8 0276 4/2023 Laser Strobe O ; $ y e. C C R e „ $ c P <P A Y F p D d 2fi o f o o N.g2. o ry m < in _ e e `g E 1 . 2 L m &' v U Z G m m 2 R 11 9 i : v �C E .1 E .. a O ' 9I v i g www.laerie.com e,S ee F y 4 1 a E 1 8 0 afar`" _ _ p LaboratoryAltitude:5,063.25 Ft. a ii a , a 4 56 Gateway Cirle Berthoud Colorado 80513 L.E.Armfield CEO/President V i P O y Q Er..)c)W F b a a s 3 5 n o' 8 o F '' NOH 877-532-7990 970-532-7990 TCC 2021-18C c CALIBRATION LOCATION:ILaerie Inc.Laboratory .a Certificate of Accredited and Traceable Calibration NEBB 2023 LAERIE Calibration&Metrology Services nuv,mmnmblrra ra(9'F)Rx(6dm6sl% Laerie,Inc.Issues this Certificate of Calibration to: Certificate Number: 187606.4885 LAERIE Jedi Balancing Customer Purchase Order: calibration&nnetrology services 568 Briggs St PO Box 525 Erie,CO 80516 Calibration Type: CAL-2 NEBB For Asset This calibration is traceable to the international system of units(SI),through National Institute of Standards and Technology(NISI). Hutchinson's method is used including Guard Banding and TUR Strategy,False-Accept Risk normal distribution and 95%confidence level typical with coverage factor of 2. .accepts and understands measurement uncertainties and risk assessment in all measurements involved in calibration. CUT Manufacturer: Evergreen Telemetry I Calibration Event: FOUND-LEFT Calibration Performance Report for: Model: !Description: Temperature Probe — S/N: 1700353 ID: 1700353 Eng./Metrologist JEDI Balancing .l anufaelnrer Serial Nu tuber Description IS=I t°rmt, a,-r..1 CAL-DATE: 7/14/2023 CAL-DUE: M 7/14/2024 SRN Evergreen Telemetry PR-T-I 1700353 Insertion Temperature Probe 14-1111-2023 12 14-Jul-2024 REF Calibration Performed: NOMINAL REF Min UUC Ind Max Compilation C-Procedure As-Received Physical Condition(s) • MPS/LAP 73.4°F t9°F,40 to65%RH 0As-Received Annual maintenance performed,nominal exterior cosmetic wear,exterior cleaned where pnsamte, FOUND-LEFT 40.0°F 39.83404°F 37.6°F 39.8°F 42.0°F Calibrated Calibration Event initial inspection PASS. Temperature 2F N Compliant Calibration performed published data no adjustments required or performed. t.5%R t 2'F 100.0°F 99.98052°F 97.5°F ]00.0°F 102.5°F Calibrated L: EBB t Range 0-200°F 160.0°F 160.00263°F 157.2°F 159.7°F 162.8°F Calibrated EMII REF Pm17n6 R. Description REF rot Cg'd Re- Description 5467 5/2024 ry Dual Block Calibrat LAERIE Calibration&Metrology Services 56 Gateway Circle Berthoud,Colorado 80513 Office:970-532-7990 TF:1-877-532-7990 Fax:970-532-7992 www.laerie.com www.laerie.com This report shall not be modified or reproduced except in full and with the written approval of Laerie Inc. Laboratory Altitude:5,063.25 Ft. 56 Gateway Circle Berthoud,Colorado 80513 L.E.ArmOeld CEO/President ]RN 877-532-7990 970-532-7990 TCC 2021-18C CALIBRATION LOCATION:I Lurie Inc.Laboratory I Laboratory Altitude:5,063.25 Ft. Page 41 1 0 f c44Rc:c,°:VR@Laeric.com Page 1 of 1 Certificate of Accredited and Traceable Calibration NEBB 2023 LAERIE Calibration&Metrology Services Ruv,mmam5173.4 ra(9'r)I2H(40005)% Laerie,Inc.Issues this Certificate of Calibration to: Certificate Number:180173.4803 I Jedi Balancing Customer Purchase Order: calibration&nnetrology services 568 Briggs St PO Box 525 Erie,CO 80516 Calibration Type: CAL-2 NEBB For Asset, This calibration is traceable to the international system of ueits(SI),through National Institute of Standards and Technology(MIST). Hutchinson's method is used including Guard Banding and TUR Stategy,False-Accept Risk normal distribution and 95%confidence level typical with coverage factor of 2. .accepts and understands measurement uncertainties and risk assessment in all measurements involved in calibration. UUT Manufacturer: Evergreen Telemetry I Calibration Event: FOUND-LEFT Calibration Performance Report for: Model: 'Description: Temperature Probe ,] �. S/N: 1700204 ID: 1700204 Eng./Metrologist: Jed'Bealaancin ww Manufacturer Serial Number Description i� Int MTh'a Re-Cal g CAL-DATE: 7/14/2023 CAL-DUE: M 7/14/2024 [RN Evergreen Telemetry PR-T-4-6" 1700204 Water Insertion Probe 10-3u1-2023 12 14-Jul-2024 REF Calibration Performed: NOMINAL REF Min UUC Ind Max Compilation C-Procedure As-Received Physical Condition(s) MPS/LAP 73.4°F t9°F,40 to 65%RH I)PS-Received Annual maintenaueeperformed,nominal exterior cosmetic wear,exterior cleaned wherepoeurmse, pera 40,0°F 40,01868°F 40.1°F 40.2°F 42,2°F Calibrated Calibration Event initial Mpectioa PASS. Tern tore 2FL:nov Compliant cal hmtion performed bushed data no adjustments d or formed. t.5%R t 2^F 100.0°F 99.98815°F 97.5°F 100.0°F 102.5°F Calibrated p p published j require per Range 0-200°F 160.0°F 160.07153°F 157.3°F 160.0°F 162.9°F Calibrated REF "Cal Re- e Description REF r*Ll.Re- Description 5467 5/2024 ry Dual Block Calibra LAERIE Calibration&Metrology Services 56 Gateway Circle Berthoud,Colorado 80513 Office:970-532-7990 TF:1-877-532-7990 Fax:970-532-7992 www.laerie.com www.laerre.eom This report shall not be modified or reproduced except in full and with the written approval of Laerie Inc. Laboratory Altitude:5,063.25 Ft. 56 Gateway Circle Berthoud,Colorado 80513 L.E.ArmOeld CEO/President 3RN 877-532-7990 970-532-7990 TCC 2021-18C CALIBRATION LOCATION:ILaerie Inc.Laboratory I Laboratory Altitude:5,063.25 Ft. Veridical Review:VR@Laerie.com Page 1 of 1 Certificate of Accredited and Traceable Calibration NEBB 2022 LAERIE Calibration&Metrology Services nxx,mmarebl7r.4 ra(9'r)I2H(40m65)% Laerie,Inc.Issues this Certificate of Calibration to: Certificate Number:111978.9285 I Jedi Balancing Customer Purchase Order: calibration B nnetrolmSV services 568 Briggs St PO Box 525 Erie,CO 80516 Calibration Type: CAL-2 NEBB For Asset, This calibration is traceable to the international system of units(SI),through National Institute of Standards and Technology(MIST). Hutchinson's method is used including Guard eanding and TUR Strategy,False-Accept Risk normal distribution and 95%confidence level typical with coverage factor of 2. UUT Manufacturer: Ex[ech I Calibration Event: FOUND-LEFT "'Calibration Performance Report For: .accepts and understands measurement uncertainties and risk assessment in all measurements involved in calibration. Model: RH390 'Description: Psychrometer S/N: 1700295 ID: 1700295 1 Eng./Metrologist: JEDI Balancing Manufacturer Serial Number @scripaon IS=I lei,arc, l"-,al CAL-DATE: I 111a1-2023 CAL-DUE 14-Jul-2024 JRN Evergreen Telemetry S-H-3-5" 1700295 Humidity Sensor l4-3ul-2023 12 14-Jul-2024 Calibration Performed: REF RH Min RH UUC Ind RH Max Compilation C-Procedure As-Received Physical Condition(s) 33.07%RH 30.1%RH 36.0%RH 36.1%RH Calibrated MPS/LAP 73.4°F t9°F,40 to 65%RH I).-Received Annual maintmaoee performed,nominal exterior cosmetic wear.exterior cleaned where powble, Calibration Event: initial inspection PASS. HUMIDITY 42.34%RH 39.3%RH 44.1%RH 45.3%RH Calibrated IFL:NEBB Compliant Calibration performed published data no adjustments required or performed. ' 75.47%RH 72.5%RH 73.1%RH 78.5%RH Calibrated Primary References Traceability Number Used in Calibration ZEIIMI REP en errs Re- . Description REF rsi,i'd at,- Description 4272 4/2024 HumidityfThermometer LAERIE 4273 4/2024 Calibration Salt A727 8/2023 Temperature Kit Sensor Calibration&Metrology Services 56 Gateway Circle Berthoud,Colorado 80513 Office:970-532-7990 TF:1-877-532-7990 Fax:970-532-7992 www.laene.com www.fve.wm This report shall not be modified or reproduced except in full and with the written approval of Laerie Inc. Laboratory Altitude:5,063.25 Pt 56 Gateway Circle Berthoud,Colorado 80513 L.E.ArnrSrld CEO/President ]RN 877-532-7990 970-532-7990 TCC 2021-18C CALIBRATION LOCATION:ILaerie Inc.Laboratory I ,t Laboratory Altitude:5,063.25 Ft Page 42 o I'f c44 c,:i,:,,-:VR@Laerie.wm Page l of t Certificate of Accredited and Traceable Calibration ge�� ak deco ° ° ° e. I Laerie,Inc.Issues this Certificate of Calibration to: Certificate Number:304074.7529 .5 g f ., o 0 o a EEDI Balancing c o A a a Customer Purchase Order: E ry N U calibration&nnatrology services 568 Briggs St PO Box 525 Erie,CO 80516 Calibration Type: CAL-2 NEBB 2, & For Asset This calibration is traceable to the international system of units(SI),through National Institute of Standards and Technology(MIST). ItC / 1 •1••1 Hutchinson's method is used including Guard Banding and TUB Strategy,False-Accept Risk normal distribution and 95%confidence level typical with coverage factor of 2. u A .accepts and understands measurement uncertainties and risk assessment in all measurements involved in calibration. " ^1 cd a Q Manufacturer umber Description iii� N:.nab, ne-cai c i l $ a e Fluke 323 49251381 WS True RMS Clamp Meter I-hlay-2023 12 1-May-2024 u fuT 1 d— — ro — — U o .2 1 = V ,, a C-Procedure As-Received Physical Condition(s) N _ E, a MCP/Fluke_323 73.4°F+9°F,40 to65%RH I)AS-Received Annual maintenance performed,nominal exterior cosmetic wear,exterior cleaned where possible, E 4 rn V Calibration Event: initial inspection PASS. W o d $ 2FL:Z540 Compliant Calibration performed published data no adjustments d or rformed, d nR pe pu j require performed. 11y11 O a a 2 a Pn,ean lieferenre,TraceaM1ility Nun:M1er 1',ed in falilrrarinn W -fir' o v: m - V it V REF Proi Cal.d Qe- Description REF rei tax Rn Description J 9 18 a a `y9 d A a E a 1 Cal.T0C22 4/2024 Calibrator O iy tL 0 d U 1.5i a 9707 9/2023 50 Turn Current Loop N , O E: o' C I Das , i` e • F lJ F �` a = d a j a A To 74 o « 5 a a a a aYgp il: ad 8 " o www.laerre.eom a > g2 V���°yyy 1 a a Laboratory Altitude:5,063.25 Ft. d e = 7 O _ 5 L.E.Armfield CEO/President '1 ° rj d t d 56 Gateway Circle Berthoud Colorado 80513 e „„ .. � n° � � d a U 0 Z 'E o 877-532-7990 970-532-7990 ' z=° a s D w E pp CJ p ;j IMMLF,AIMI TCC 2021-18C a` ,g q q Q V d o f . CALIBRATION LOCATION:Lurie Inc.Laboratory I _ S 'S m pp a 3 1 x of B°U o m m C D ]o" c 'j S 3 a S 8 a o C" C r r d a 'o a m a q a * C E a � c W ry U W U — _ U_ _ c u W r c U O a a > w Q a w a _ v 3 .E m E a o 5 I ti m g B • rn 8 p na o w 5 6 4 rn 'c 111 n : 3) w o U — _ O— _ — _ .,—G,a C _.0 5 w o °'c 7 W of d o ; 5 o ° o .6— a a u p c E 5 _ 0 y °O o a 82 E o SoII W 41 < 0 O— w—E— 4— — —. — d 3 < 0 . uo 2 vva - c5 > > > w > > e > > o � > a a a w a •.S JO coc < •d3 ns 1 1 O 9 a a r a I = -, ° B p"r= a j0 " e — V * b ,a, " _ VH d, o N p at S oo > > a > > > ` > e > V - 9 l•J oa oa g O A A U ii — — — w>w> o m > > > 8 > > '� > > i > a u CCP- °o °g B w ., F. A c a a t e e c 00 ., " A c to J — �di> s at a,M .. 5 2 H 1 1 t 2 'f'u =u .� `8 I s I. .c M u 5 .wtul 5 d p - s <= a= a a00 .4 a a R° 1. Page 43 of 44 Certificate of Accredited and Traceable Calibration NEBB 2023 LAERIE Calibration&Metrology Services anme,rr eotalu3.4 Fa(9'F)It11(4am65)r Laerie,Inc.Issues this Certificate of Calibration to: Certificate Number:117586.6714 I JEDI Balancing Customer Purchase Order: calibration&nnetroloxV services 568 Briggs SE PO Box 525 Erie,CO 80516 Calibration Type: CAL-2 NEBB For Asset, This calibration is traceable to the international system of units(SI),through National Institute of Standards and Technology(NIST). CUT Manufacturer: Evergreen Telemetry I Calibration Event: FOUND-LEFT Calibration Performance Report for: Hutchinson's method is used including Guard Banding and TUR Strategy,False-Accept Risk normal distribution and 95%confidence level typical with coverage factor of 2. Model: S-PVF-1 'Description: Pressure Velocity Flow Meter .accepts and understands measurement uncertainties and risk assessment in all measurements involved in calibration. S/N: 8601242 ID: 8601242 Eng./Metrologist: JEDI Balancing wiw CAL-DATE: 3/17/2023 CAL-DUE: !3/17/2024 JRN Manufacturer 3 Serial Number Description 12=1 Int.MI'is Re-Cal Percent of REF Min UUC Ind Max Evergreen Telemetry S-PVF-I 8601242 Flow Meter,Pressure and Velocity I7-Mar-loot 12 17-Mar-2024 Calibration Performed: Range inH:O inH.O inHoO influO Compilation C-Procedure As-Received Physical Condition(s) Pressure 20.0 -9.0000 -9.180 -9.0215 -8.82 Calibrated LAP NEBB 2023 73.4°F+9°F,40 to 65%RH 0 AS-Received Annual maintenance performed,nominal exterior cosmetic wear,exterior cleaned where possible, .2%Ru.oat inH.O 50.0 0.0000 -0.00010 0.00000 0.00010 Calibrated Calibration Event initial napection PASS. RANGE.15 l aH:O 80.0 9.0000 8.82 8.9805 9.18 Calibrated 2FL:NEBB Compliant Calibration performed published data no adjustments required or performed. MIN UUC MAX f Prima,References Traceability Number Used in Calibration Calibration Performed: Ire g 8 nH nH inHgCompilation 8 ama Re- Pr'''''''no Absolute Pressure 25.0530 24.5518 25.10 25.5542 ' Calibrated REF erol Cal Description REF Cal. Description Note Absolute Pressure(Le-Barometric Pressure)is not part of NEBB Requirments.In(ormaion is for Comparison only. 40021 9/2023 Pressure Calibrator 10014 9/2023 Pressure Calibrator ^E L RIE _ Calibration&Metrology Services 56 Gateway Circle Berthoud,Colorado 80513 Office:970-532-7990 - TF:1-877-532-7990 Fax:970-532-7992 www.laerie.com www.laerie.com Laboratory Altitude:5,063.25 Pt. 56 Gateway Circle Berthoud,Colorado 80513 L.E.Arm field CEO/President This report shall not be modified or reproduced except in full and with the written approval of Laerie Inc. 1RN 877-532-7990 970-532-7990 TCC 2021-18C CALIBRATION LOCATION:ILaerie Inc.Laboratory Laboratory Altitude:5,063 25 FL Veridical Review:VR@Laerie.cum Page 1 of 1 Certificate of Accredited and Traceable Calibration NEBB 2023 LAERIE Calibration&Metrology Services en.uoNneota1o3.4 eF p,FI R11(apm65)r Laerie,Inc.Issues this Certificate of Calibration to: Certificate Number:169394.6759 I Jedi Balancing Customer Purchase Order: UUC Manufacturer: TSI I Calibration Event: FOUND-LEFT Calibration Performance Report For: calibration&nnetrolnxv services 568 Briggs St.PO Box 525 Erie,CO 80516 Calibration Type: CAL-2 NEBB Model: HM675/801290 I Descri pt ion: Hydronic Manometer&Probe For Asset, This calibration is traceable to the international system ofunits(SI),through National Institute of Standards and Technology(NIST). S/N: 71646134 ID: 71646134 Eng./Metrologist Jedi Balancing Hutchinson's method is used including Guard Banding and TUR Stategy,False-Accept Risk normal distabution and 95%confidence level typical with coverage factor of 2. CAL-DATE: 7/25/2023 CAL-DUE: 7/25/2024 JRN .accepts and understands measurement uncertainties and risk assessment in all measurements involved in calibration. Calibration Performed: REF Min UUC Ind. Max Compilation Manuracwrer Serial Number Description tm.Nabs m'-cm 0.000 PSI -1.000 PSI 0.000 PSI 1.000 PSI Calibrated TSI HM675 71646134 Hydronic Manometer 25-3u1-2023 12 25Ju1-2024 Pressure 60.000 PSI 57.800 PSI 60.03 PSI 62.200 PSI Calibrated ±2%R+1 PSI RANGE 0.4 TO 200 PSI 150.000 PSI 146.000 PSI 150.1 PSI 154.000 PSI Calibrated C-Procedure As-Received Physical Condition(s) 200.000 PSI 195.000 PSI 200.2 PSI 205.000 PSI Calibrated NEBB 2023/LAP 73.4°F t9°F,40 to 65%RH U GS-Received Annual maintenance performed,nominal exterior cosmetic wear,exterior cleaned where powhle, Calibration Event initial inspection PASS. 2FL:NEBB Compliant Calibration performedpubliished data no adjustments required or performed. Calibration Performed: NOM REF Min UUC Ind. Max Compilation Primary References Traceability Number Ikea in Calibration Temperature 18.0°F -2.000°F N/A 2.000°F N/A ±.5%R+2°F 105.0°F -2.000°F N/A 2.000°F N/A REF Proiected Re- Description roti REF `free e- esc Dription Cal. Cab RANGE-40 TO 200°F 192.0°F -2.000°F N/A 2.000°F . N/A 10014 9/2023 Pressure Calibrator Temperature probe not provided for calibration • LAERIE Calibration&Metrology Services 56 Gateway Circle Berthoud,Colorado 80513 www.laerie.com Office:970-532-7990 TF:1-877-532-7990 Fax:970-532-7992 Laboratory Altitude:5,063.25 Ft 510= www.laerie.com 56 Gateway Circle Berthoud Colorado 80513 L.E.AortSeld CEO/President 1RN 877-532-7990 970-532-7990 TCC 2021-18C_ CALIBRATION LOCATION:�Laerie Inc.Laboratory This report shall not be modified or reproduced except in full and with the written approval of Laerie Inc. Laboratory Altitude:5,063.25 Ft. Page 4.4. Q f e44Review:VR@Laerie.com Page I of t