HomeMy WebLinkAboutFile Documents.681 Moore Dr.0040-2024-BROF (3) ROOF/RE-ROOF APRICATION CHB MST
pRosEcrADDF 681 Moore Dr.,Aspen,CO 81611 DATE June 13,2024
NOTE All re-roofing projects require a Fbofinq Fermit. Roof work that changes height,slope,footprint,structural framing,or cavity insulation requires a
Building Permit. Patching less than 1 square(10'x10')does not require a permit.
THE FOLLOWING M UST BEINC UDEDWITHEACHBOORNGPERMITSUBMISSION:
O City of Aspen Re-Roofing Application Checklist-This form must be completed entirely.
O Permit Application Signatures Packet-Al 6 pages must be completed and indude owner or contractor signatures where applicable.
If you answered YES to the Asbestos Checklist in the Permit Application Signatures Packet,answer these questions:
0 YES 0 NO-Are all materials to be removed asphaltic,tar impregnated and non-friable(will not crumble by hand pressure when dry)?
O YES 0 NO-Will you be removing the roofing materials by hand(no circular saws)?
O YES❑NO-Will you dispose asphaltic roof shingles and NOT recycle them?
If you answered YES to all the above,an asbestos test will not be required.
O YES 0 NO-Is the address listed on the"Inventory of Historic Stes and Structures"or in a Historic District?
If you answered YE$HPCApproval is required for this project. Contact the Historic Reservation Cfficer at 970-429-2758.
O Ste Plan-The site plan may be hand drawn but MUST be legible.Ste plans must show the entire roof and indude the following:
0 Extent of proposed work
ImperviousAreas-You must illustrate and label all hardscape vs.landscaping
0 Downspout&Gutter locations-Draw and label each one and show if they drain to hardscape or landscaping
0 Showguards/stops-The se are required on all roofs that shed onto neighboring properties or potentially occupied areas such asa walkway,
stairway,alley,deck,pedestrian and vehicular exit from buildings or areas where there is potential for personal injury or property damage and
areas directly above or in front of gas utility or electric utility meters.(Ordinance 1,2023)
❑ Heat Tape-Snow location of all heat tape(including existing)
O YESO NO-Will you have heat tape(existing or new)?-RENIP worksheet/fees and controls required
❑ Existing or New Heat Tape watts/ft X Linear Feet: = Watts.
If greater than 1000W, RBV1P fees will be applied.
0 Controls(Provide Spec Sheets): 0 >40 deg F shut off plus one of the following: 0 moisture sensor or 0 daylight sensor or
❑timer to shut off at night
NOTE A sub-electrical permit is required for any roof with heat tape
O YES/0 NO-Are there trees on the property?-Parks has purview over all trees/forest
Note:City code 13.20.020 explains rules in and around trees.Contact City Forester or their designee @ 970-920-5120
O Two Photographs of Existing Conditions-One photo must dearly show the structure involved and one must show a dose-up of the existing roof.
O Construction Management Plan(CMP)
El Ste Plan-(information can also be included on the site plan from above)Slow all construction staging areas(i.e.dumpster,trailer,portable
bathrooms,etc)and any other requirements per the CMP form
O Proposed Roof Assembly Drawing-Show all layers/components from the roof sheathing up.Each roof layer must be dearly labeled to indude
product and manufacturer name and existing to remain components and number of layers.Slow flashing and ice/water barrier.
• Basting roofing and number of layers: 1 Layer
O YES12 NO-Isthere insulation currently installed above the roof deck/sheathing?
describe and list estimated average insulation i3value and thickness
❑ If YES to the above, insulate per the below:
❑ Commercial: R-40 above deck(or R-40 combo of above and below deck)
❑ Residential:R-49 above deck(or R-49 combo of above and below deck)
❑ Alternate design(must be approved by Building Department for a justified infeasibility)
❑ Letter of Structural Integrity from Structural Engineer-If adding insulation&building not constructed to current snow load
(100psf)
O YES/0 NO-Are you replacing damaged roof deck?0norn canalssr,ift of roof deck to be replaced
• ULor ICGESreport for the listed aassA roof assembly specific to your roofing product and installation(required for all roofs per
Ordinance 1,2023)
O YES 0 NO-Is the roof vented?If NO, (Mai yes to insulation rnu meet 2021 IBC 1202.3 or provide dew point calculations
RECEIVED -
Updated 6/6/23 06/14/2024
ASPEN
BUILDING DEPARTMENT