Loading...
HomeMy WebLinkAboutFile Documents.681 Moore Dr.0040-2024-BROF (6) 1 A Safer & More Secure Roof The Right Choice Is The Choice You Only Make Once. Class A Fire Rating • Class 4 Impact Rating 110 MPH Wind Rating • Lifetime Limited Warranty Backed by a lifetime limited warranty, our tiles not only protect but enhance the look of your home, without the maintenance and frequent repairs associated with other roofing materials. DaVinci products have achieved the highest possible test ratings for fire, wind and impact, giving you a more secure home for your family. Our products have been approved and preferred by cities and subdivisions nationwide. Select your roof with confidence and enjoy the peace-of-mind that comes with making the right roofing choice for your home. Attractive, durable and reliable, a DaVinci polymer roof brings decades of beauty to your home. TESTING SUMMARY* Type of Test Standard Results Fire Test ASTM E 108 Class A Impact Test UL 2218 Class 4 Wind Test ASTM D 3161 Certified to 110 MPH* Building Code Approvals: ICC-ES ESR-2119, Miami Dade County, FL and Texas Dept. of Insurance *See DaVinci website for most up-to-date testing and certifications. TECHNICAL SPECIFICATIONS Multi-Width 9", 8,, 7',, 6", 4" 5/8" 10"-304 lbs, 9" 342 lbs Single-Width 9" 5/8" 10"-283 Ibs, 9" 315 lbs Bellaforte 12" 1" average 12"-190 lbs �.�41_i( i `,1 I;�_ iili'_ i i r,�;fi( �:5 (�'.tr1�i 1 � i %'� - I 8"-260 Ibs, 7.5" 277 lbs Multi-Width 12", 10, 9", 7'; 6" 1/2" 7"-297 Ibs, 6" 349 lbs 8"-257 Ibs, 7.5" 274 lbs Single-Width 12" 1/2" 7 -294Ibs, 6" 346 lb `" •"rEWED Bellaforte 12" 1/2" 12"-182 lbs -- t ` . 14 2024 NOTE: Printing reproduction of colors shown in this brochure may vary from actual product. ASPEN BUILDING DEPARTMENT DA NCI DaVinci Shake Select Shake INSTALLATION • GUIDE DaVinci polymer shakes are carefully engineered to provide the authentic look of hand-split shakes with dramatically increased durability and resistance to fire and impact.Special care has been taken to make the product easy to install.By following these instructions,and using good installation practices,you will be assured a quality installation. NOTE TO INSTALLER 22' DaVinci Select Shake offers a 5/8"thick profile,yet remains i lightweight,because the shakes have an engineered rib struc- ture.When cutting shakes for valleys or at overhangs such as eaves and gable ends,the ribbed support structure on the • underside of the shake needs to be hidden by standard metal fiashings. �1 Pay special attention to recommendations for accessories and installation at eaves(page 2).gable ends(page 4)and valleys (page 6). I I I I I JOB SITE READY! $ 10 DaVinci shake bundles are delivered to the construction site pre-collated with shingle widths and color variations in the ordered blend.This pre-planned distribution produces the right aesthetic effect every time.Collated bundles also simplify installation and save time by eliminating hand sorting on the job site. This information is provided for the use of professional roofing contractors.This Installation Guide does not supersede local building codes which should always be followed.DaVinci'Roofscapes does not warranty or have any responsibility for installation of its products.The DaVinci Roofseapes Lifetime Limited Material Warranty outlines its warranty responsibilities for the roofing materials it manufactures. For questions about DaVinci Shake or its application,contact Westlake DaVinci Roofscapes,LLC 913-599-0766 or 800-DaVinci(800-32R-4624)or www.davinciroofscapes.com Please he ruts'en check Da l'uci h mebsite for updates.Installation Guide is subject to change without notice. 2;2n2a 4111110 RECEIVED 06/14/2024 -ASPEN BUILDING DEPARTMENT INSTALLATION asking Distance from butt-line Felt Interlay to felt is equal totwice \\+ DECKING the shingle exposure DaVinci Shake must be installed on a smooth flat surface(plywood ur OSB); shingle \ • minimum 15/32"APA approved plywood or 7.16"approved OS13.It is necessary exponure that all previous roofing materials be removed prior to installation of DaVinci Shake.Imperfections in the decking may transmit through to finished roof. Prior to installation over any plank type decking please see the -- - technical bulletin.RE:Dat7nci&Installation Over Plank Decking. dated October 24.2022%'possible concerns or warranty exclusions. ` DRIP-EDGE i Metal flashing is required on gable ends and caves.An overhanging drip edge is recommended on gable ends to help mask the rib structure on • the underside.An overhanging drip edge may also be used on caves although non-overhanging drip edge styles are acceptable options Style Dor . • Self-Adhered Style F Drip Edge Membrane can be used Starter Course SELF-ADHERED MEMBRANE (Severe Climate underlayment in accordance with Chapter IS of the(IBC) In areas where the average daily temperature in January is 25°F or lower or where ice buildup is possible,DaVinci requires self-adhered membrane be installed:from the bottom edge extending two feet above the exterior wall line on all eaves.The self-adhered membrane is required in all valleys regardless of average daily temperatures or the possibility of ice buildup. UNDERLAYhI ENT AND INTERLAYMENT(See Davinci Document Library for possible additional options) Typical Unrated Installations:Minimum underlayment options are One layer ofASTM D226 Type 11(30 lb)Asphalt-saturated organic felt,or,One layer of synthetic underlayment approved as an alternate to ASTM D226 felt,or,One layer of self-adhered membrane covering entire roof deck. Rated Installations: Method 1:Class A installation One layer of GAF VersaShieldlc Fire—Resistant Roof Deck Protection(ESR-2053(in addition to required self-adhered membrane. blethod 2:Class A Installation One layer Fontana VulcaSeal G40 in addition to the required self-adhered membrane(This system is not recognized by 1CC-ES). Method 3:Class A Installation One layer of Eco Chief SOLARHIDE(ESR-4035)in addition to the required self-adhered membrane. Method 4:Class C Installation The entire roof must be covered with an approved underlayment in addition required self-adhered membrane. Pitches below 6:12 Felt Interlay/Alternative Options—Felt interlay may be added to any Davinci Shake install for additional protection from weather and is one of the options to cover additional requirements with certain installations.DaVinci Shake must be installed with 30 lb.felt interlay or an appropriate option if the pitch of the roof is under a 6/12 and an exposure beyond 9"(for example 10"straight or 9"staggered)is desired.An alternative to using felt interlay is to use two layers of an approved underlayment with their laps offset.(Felt interlay is installed by rolling out IS"wide rolls of 30 lb felt at the same exposure as the shakes. The felt should be applied over the top portion of the shakes and extend onto the plywood sheathing so that the bottom edge of the felt is positioned at a distance above the butt equal to twice the weather exposure.So for an exposure of 10",start the layer of felt 20"above the butt line of the course below). Class A Installation • Felt Interlay-must be used in addition to one of the other Class A approved underlayments listed above. • Two layer option-An alternative to using felt interlay is to toe two layers of approved underlayment with their laps offset. One of these layers must be Eco Chief SOLARHIDE(ESR-4035),GAF VersaShield,or Fontana VulcaSeal G40. Note 1:Approved underlayment refers to any underlayment that is listed as a component of a Class A roof deck assembly by an Approved Agency when tested to ASTM E 108 or UL 790. Note 2:Under(ayment and Asphalt Shingle components arc to be installed with mechanical fasteners in accordance with the manufacturer's pub- lished installation instructions.Self-adhering or adhesive applied underlayment and asphalt shingle installations arc outside the scope of this listing. RECEIVED 06/14/2024 -- ASPEN BUILDING DEPARTMENT INSTALLATION FASTENERS Tiles should be installed with nails long enough that they will penetrate through the roof deck by at least 3/I6 In most instances.I li' roofing nails are acceptable.\Ve recommend copper,stainless steel,or hot-dipped galvanized nails.Ring-shank nails are optional for plywood,but must be used for OSB decks and in high wind areas. STARTER COURSE Each starter tile should be installed so that it extends past the drip edge by approximately t':If using overhanging drip edge,the starter shingle may overhang less if it is appropriate for the gutter system.The starter tiles should he installed with the DaVinci logo on top.The starter tiles should be spaced 3!8"apart as tiles will expand when warm.Each starter tile should he nailed with two approved nails on a line approximately 6"from the butt and from outside edge. GETTING STARTED Use approved nails in each shake at or near nailing location shown on the shakes(see page 8).Nails may be placed lower than the in- dicators as long as the tile above it covers the nail.Once the starter tiles are in place,begin installing shakes in the lower left corner(or lower right corner for a left-handed roofer).The shakes should be flush with the starter tiles on the outer(rakes)and lower(eaves)edges. DaVinci recommends a minimum 3/8"gap between shakes. Two methods of installation are available: 1.Straight:in which the exposure of each shake is kept consistent 2.Staggered:in which the exposure varies by a maximum of I"on adjacent shakes Use the alignment indicator at the top of each shake to help manage the exposure.An exposure of between 9"or 10"is acceptable for straight courses and 9"for staggered courses.As you progress up the roof,he careful not to damage shakes a ready in place.Put some- thing.perhaps a piece of cardboard or cut shake,under toe irons(scaffolding brackets)to avoid scratching or marring the shake already installed below, STRAIGHT COURSING Straight Coursing on DaVinci Shake at a 10"Exposure Install the shakes one at a time starting in the lower left hand corner if right 42,, handed or lower right hand corner if left handed.The first course of shakes / \ should be laid directly on the starter tiles with the butt of the shake flush with the butt of the starter tile.The shakes should be installed individually with - + 32" two nails in or near the defined areas.The shakes should be laid individually with a rack type system,also known as rack-style,stair-stepping,or pyramid- ing;to prevent same size shake directly on top of another.The shakes should 22" be laid with an approximate 3/8"gap between each shake.The gaps between shakes on adjacent courses should offset by a minimum I Y_".To assure proper horizontal alignment we recommend that chalk lines be snapped frequently. These chalk lines should be placed on the underlayments so that the shakes are aligned by the tips of the tiles rather than the butts. Chalk lines.should he snapped on ttnderlayrnent with the tips of the ?s•a,i,het,,,;o,a.h.ni��.ie shakes following the lines.Do not snap lines on DaVinci Shake or use red chalk as the chalk may permanently discolor the shake. Staggered Coursing on DaVinci Shake at a 9"Exposure • • 40" • STAGGERED COURSING Nail DaVinci Select Shake may be staggered using a similar method as hole, and Multi-Width Shake.This will mean that it will appear _ that two tiles are pulled down at once in some instances.When neces- sary the tiles with false breaks may be cut in the false break area to create two distinct tiles. Select Shake tile do not have alignment indicators so the courses should — — — — "Z,.. be aligned with a chalk line at the tip of tile or alternately with shake liner. • Staggering the courses is accomplished by laying the shakes in 9" courses with every other shingle lowered I". Tr s's,�� ninglc h "st< An example of how to accomplish this is as follows: of 9 RECEIVED 06/14/2024 ASPEN BUILDING—DEPARTMENT INSTALLATION Tl STAGGERED COURSING(Continued) Step 1:Lay the first course of shakes flush on top of the starter.Then snap a horizontal line n above the tips of the shakes you just installed (/^ or 31"from the gave line(butt of the shake you just laid). Step 2:The first shake on second course should be installed putting the tip of the shake on the chalk line.The next or adjacent shake should be 1"below the line.The third shake should be on the line;the - - fourth shake should be below the line.This continues in the same pattern all the way across the roof one shingle tip on the line and the next I"below the line. Step 3:Snap another horizontal line 9"above the line you chalked Field Shakes should extend in Step 2 or 40"above the butt of the first course of shakes.Start laying ',"past the overhang drip shakes as in Step 2 with the first shake tip on the tine and the next edge on gable ends(rakes). shake tip about I"below the line. Step 4:Continue up the roof in this manner. GABLE ENDS/RAKES Tip:10"tiles with a false keyway can be cut along the false keyway Cutting Select Shakes;it gable ends,shakes should be cut so that and used as two individual pieces.This will create a more random look. the factory edge faces out on the gable end.When necessary the Cut the keyway wilt a knife vs.a saw for a cleaner cut. tiles with false breaks may be cut in the false break area to create Chalk lines should be snapped on underlayment with the tips a!the two distinct tiles. shakes fidlnwing the lines.Do not snap lines on DaVinci inci Shake or use red chalk as the chalk may permanently discolor the shake. GAP The recommended gap between shakes is 3/8"with a minimum 3/16"gap required.The number of shingles per square for DaVinci Shake is based on the assumption of 3/8"spacing between shakes. CUTTING If spacing is less,store shingles per square will be required. "CRACK rr DaVinci Shake may he cut with a utility knife and straight edge. AVOID CRACK ON CRACK It may also be cut effectively with a circular saw.Carbide tooth The gap between two shingles in one course should always line up blades are recommended for maximum blade life. I'G"or more from the gap between two shingles in the course below. When possible,the same rule should apply to false breaks although this T is for aesthetic reasons and will nut affect the performance of the roof ` system. ' it Correct • t. COLOR AND WIDTH VARIATION Davinci Select shake bundles are made up LA'S different shake Incorrect (tile)shapes.Four of the tiles are 3"wide and four are 10" t` wide.Of the four 10"tiles,three have false breaks making them t appear to be two ditTerent shakes and one of them is a In"tile without a false break.DaVinci Roofscapes recommends that the shakes should generally be installed as they come out of the bundles.Keep in mind there must be I ti"side lap maintained l and installation must be in a rack or pyramid style. 41150 RECEIVED 06/14/2024 ASPEN BUILDINODRTMENT INSTALLATION ONE-PIECE HIP AND RIDGE APPLICATION:HIP AND RIDGE PREPARATION Select Shake uses the Shake One-Piece Hip and Ridge.DaVinci one-piece hip and ridge shakes have an optimum appearance when used on pitches of 12:12 or less.Steeper pitches may cause outside edge to lift and it is recommended the conventional - --two-piece hip and ridge method be used for pitches greater than 12:12.Roofing nails that penetrate through the roof deck and exceed it by 3/16"should be used. RIDGE VENT APPLICATION If using a continuous ridge vent we recommend a rigid shingle roll-over type.Once the continuous vent is installed. prepackaged One-Piece Hip and Ridge shingles should be installed in accordance with the standard hip and ridge installation instructions below.Special caution should be used when cutting the decking on the ridge to assure adequate nailing for the ridge pieces. DAVINCI ONE-PIECE HIP AND RIDGE SHINGLE INSTALLATION The one piece hip and ridge tile should he installed at a 12"exposure.The tiles should be nailed once on each side about '/,"from the outside edge with an approved fastener long enough to penetrate through the roof deck and exceed it by 3/16". (2'/z"roofing nails are acceptable in most instances.)The hip and ridge should be nailed approximately I2'/z"from the butt of the tile,and/:"to''/,"inch front the outside edge. When nailing,it is best to try to nail the hip and ^ ridge throu gh the butt of the field tile,not in the void below the brut.The nail may be raised up to an inch above the nailing circle i 1-necessary.If • • the a must be nailed r the gap belowil the butt ha ../1.<111' ' - .111111111114 of the field t ile,don't drive the nail down so hard ill '. ._ ... 71 I I 1 I I I ill,:i I h itbe u the hip and ridge stue.A chalk s I should be used on the hips to assure straightness. Il A shingle over type continuous ridge vent may he used if wanted.If continuous ridge vent is used, • nails used to secure the hip and ridge tiles must ' t penetrate through the decking and exceed it by N011111 12"DaVinci Shake 12"exposure One-Piece Hip and I Ridge ill- -i Hip Starter Application: At the bottom of a hip,the hip and ridge the may be cut on an angle so .� that the bottom edge maybe installed parallel with the have.A pioeh of Bashing or UV stable roofing material should be installed along the bottom 6"of the hip in order to protect the area under the seam formed k,I by the cut material.The cut hip and ridge tile is then assembled so that the two cut pieces are butted together to form the bottom piece of hip \ •and ridge.Once these two tiles arc in place,a full hip and ridge tile is installed and pulled down so the outside comers just reach the bottom of the roof. 4411110 RECEIVED 06/14/2024 - ASPEN BUILDINGDEPARTMENT INSTALLATION Two-PIECE HIP AND RIDGE APPLICATION:HIP AND RIDGE PREPARATION After installing field shakes,hips and ridges should he prepared by installing a minimum 6"wide piece of non-corrosive metal,UV stable EPDM or equivalent over the hips and ridges.This metal or EPDM should extend at least three inches front —the center point on each side of the hip or ridge. - RIDGE VENT APPLICATION If using a continuous ridge vent we recommend a rigid shingle roll-over type.When installing continuous ridge vent,care should be taken to insure joints in ridge vent are water tight.Once the continuous vent is installed,prepackaged 6"DaVinci hip and ridge shakes should be installed in accordance with the standard hip and ridge installation instructions below.Caution should be used when cutting the decking on the ridge to assure adequate nailing for the ridge pieces.Rooting nails that penetrate through the roof deck and exceed it by 3/16"should be used. TWO-PIECE HIP AND RIDGE SHINGLE APPLICATION The bottom piece of hip and ridge should be cut so the tip does not extend past the butt of the second course.It-preferred on the bottom of a hip.two 6"DaVinci Shake cut 5"wide placed upside down can be used as an tinder course.This will prevent the rib structure from being seen on the underside.These shakes that make up a hip and ridge unit should be installed with a ten-inch exposure.Using a chalk line to assure straightness.the prepackaged 6"hip and ridge should be installed one piece at a time so that the butts of two shingles are adjacent and the inside edges touch. Non-corrosive mewl • T __L 4111111111111110:0,,, 10"exposure 6"DaVinci Stokes 4461110 RECEIVED 06/14/2024 ASPEN BUILDINGDEPARTMENT INSTALLATION VALLEYS Because DaVinci Shake has a rib-structure on the underside,care must be used when installing DaVinci Shake in valleys. Open or closed valley systems may be used with variants of each system.Whether installing an open or a closed valley system, valley metal should be made from 24"stock of copper.minimum.019 aluminum,or minimum 28-gauge clad steel.DaVinci requires self-adhered membrane he used in all valleys. DaVinci Valley Metal Options Open Valley Metal • All metal valleys to he manufactured using 2'wide panels at a mini- mum. • • All returns are to be' • All Shake Diveners minimum 13/4" Open Valley Appe:trattce Options Single Closed Diverter Valley Metal Open Valley Metal,Single Open,or Closed Diverter Metal: In many eases,with steeper pitched roofs,it is acceptable to install open valley metal or either type of single diverter valley metal and cut the tile on ass angle parallel and 2' front the center or center diverter.Keep in mind that the cut rib structure of the tiles may be visible from the ground with some roof pitches. Single Diverter Valley Metal Twin Diverter Open or Closed: Double open or double closed diverter metal can be used to provide an open valley appearance while also blocking the support ribs on the underside ot'cut tiles. This should be made frosts 24"stock that is broken in the middle without diverter to look like a"V".Additionally.there should be a closed or open diverter on either side of the center line.Shake Double Open Diverter Valley Metal should be cut and laid against the direrters on either side to mask the rib structure.This option will leave a visible portion of metal centered on the valley commonly 5-7"wide. Closed Valley Appearance Options Double Closed Diverter Valley Metal Single Open or Closed Diverter: In many cases.with steeper pitched roofs,it is acceptable to install a single open or closed diverter"valley.The shake tiles are then cut appropriately in order to lay near the center diverter.This option will only leave a smallik Retort) scant or crown of the diverter visible and resembles a closed valley. nhi n.r \ilL�melallnptmn A oral t'allw metal hroken rrvm-'J".ant. . I m: 'x m tn•i, The tip coma urthc,hate Ova.,tovi cantero rall:y should `cVN mr mgt., in all rall:r,. ulrat a�5'rnglc. �r iacr:hake eJjacatt to I• / ICI'.} here plvtlle. Nail a,lrt a, _.e prat ca1.Tn I 1 nail cin.cr than?"fromecmer. i' a I 411( ► - � ARV RECEIVED 06/14/2024 ASPEN • BUILDING DEPARTMENT SPECIAL ISSUES • FLASHING count n„Hint Flashing should be used in all areas where the roof abuts a vertical wall,dormer,chimney,skylight or - n„fm"_ - other structural protrusions. Use the step flashing method,with copper,a minimum — / su,cnainu of"2S-gauge clad steel,or a minimum.019 aluminum r //— 14't n ,.gin.flashing.The flashing should extend 4"upvertical walls. /- cnnn,;. Fh.1 rir.,•„r nn:hm,1,u• f lnhine Arran Fls,hin hllnnnum L.•nti6. VENTILATION z - -- — /- 7— In some climatic regions of the country,proper n/ ventilation is crucial to the performance of a roofing t system.Proper ventilation is especially important in cold climates where modern houses are well insulat 14711 - ed and weather-tight.We suggest you follow standard building practices in your area and meet all national cnmf w,u.Von and local building codes.A continuous ridge vent • o,,e square float of "t t"```9 combined with proper intake or cave ventilation is an you �! s.plam feel ague. especially effective ventilation system,and one that - BRAN we highly recommend. 3 - 4111, HIGH WIND AREAS DaVinci Shake shall have a maximum 9"exposure. DaVinci Shake shall be fastened with two(2)13/4" \. . long ring-shank nails"below the marked holes and 9 - 4"up from the butt edge and shall penetrate through -'•' ., j the underlying panel. 7 - Sant V,,ns Please see"Affirmation of High Wind Roofing Installation Compliance form"for any additional I.II 1 installation requirements. SNOW GUARDS Snow guards should be considered in all geographic areas where accumulating snow fall is possible.Most kinds of brass,copper, or clad aluminum snow guard systems work well with DaVinci. Rocky Mountain Snow Guards,Inc.is good source for further information about snow guards.Contact them at www.rockymountainsnowguards.com or call 877-414-7606.1t is recommended that snow guards be installed during the installation of the DaVinei roof although retro-fit snow guards are available for previ- ously installed DaVinci roofs.Details regarding installation remain the responsibility of the installer and the customer. For additional information please see Q&A Guide to Snow Guards at littp://dvroof.com/IBEYN I W. Consult with your local contractor to determine if snow guards would be appropriate for your project. DaVinci makes no representations or warranties about the propriety of snow guard installation on any given project.Rather,the decision to install snow guards rests solely with the end user. Pg,8of9 RECEIVED 06/14/2024 ASPEN BUILDING DEPARTMENT PRODUCT r EATURES EXPOSURE ROOF PITCH COURSING INTERLAY MAX.EXPOSURE Less than 3:12 Not Recommended 3:12 to 6:12 Staggered Required' 9" 3:12 to 6:12 Straight Required' 10" 6:12 or greater Staggered Optional 9" Nail Holes 6:12 or greater Straight Optional 1(t" • Felt interlar is recommended on am'pitch.It is one of the additional mtderlarment options required on pitches less than 6"/n 12".*Intro layers eq.Fontana t ulca.Sea1 i.s used interior is not irquirvd. Natural Appearance NAILING Each shake should be applied with two copper,non-corrosive stainless steel, j or hot-dipped galvanized,3/8"head x I?;"length nails in most instances.Mini- mum 3/8"head is required.Roofing nails that penetrate through the roof deck and exceed it by 3/16"should be used.Shakes can be nailed by hand or with a pneumatic nail gun.Don't overdrive nails or drive nails at an angle.Keep the nail head flush with the surface oldie shingle to avoid creating"craters"which can collect moisture and can also prevent the exposed end of the shingles front i laying flat.Use these alignment guides with the top edge of the previous row of t control theexposure. shakes o co o e posh e. 1 i1 CUTTING DaVinci Shake can be cut with a utility knife and straight edge. QUICK REFERENCE Electrical circular saws(carbide blade.two teeth per inch)or cordless circular saws(a minimum of 18 volts is recommended) may also be used. • Don't overdrive or install nails at an angle • Always leave a gap between all tiles Please note:DaVinci Shake is made flat,should be stored flat and oust not be installed unless it is flat and in its original form.If shakes Vertical,always install up the roof not one row are not stored flat and become twisted or curled,lay them flat in a across 11w roof at a time warm place and they will return to their original flatness.Damaged • Install over a clean plywood deck only shake should never be installed. • Never use red chalk • Cut edges always go to the inside along rake ELECTRO-GALVINIZED NAILS edges or gable ends • Install snowguards in any snow prone area DaVinci recommends the use of copper,stainless steel,or hot-dipped galvanized nails.We realize however that in many climatic regions nail corrosion is not a factor in the long-term ISSUE DAVINCI ACCEPTABLE performance of the roof system.Therefore DaVinci Roofscapes RECOMMENDS ALTERNATIVES supports the use of Electro-galvanized nails and a system using Valley Copper 28-gauge clad metal those nails will be in compliance with the DaVinci Lifetime Limited Material Warranty.The exception to that is that it the Flashing Copper 28-gauge clad metal nails fail,any portion of the warranty associated with wind Eaves Flashing Copper 28-gauge clad metal performance would be void. Non-Corrosive Hot-dipped Nails Stainless Steel Galvanized For questions about DaVinci Shake or its application,contact Westlake DaVinci Roofscapes,LLC 913-599-0766 or S00-DaVinci(800-328-4624)or www.davinciroofscapes.com Please be sure to check Da l?aci s website for updates.Installation Guide is subject to change without notice. Pg.9of9 02024 Westlake Royal Building Products t4LIGSL-02/2024 DAV194001 RECEIVED 06/14/2024 ASPEN -- BUILDING DEPARTMENT