Loading...
HomeMy WebLinkAboutFile Documents.309 Oak Ln.0021-2022-BRES (28) Reviewed by Engineering 12/14/2022 JVA,Incorporated "I tI I t "It should be known that this review shall not 817 Colorado Avenue 17"11---------------"' relieve the applicant it their responsibility f ,� comply with the requirements of the City of Suite 301 �� Aspen.The review and approval by the City is offered only to assist the applicant's Glenwood Springs, CONSULTING ENGINEERS understanding of the applicable Engineering CO 81601 requirements."The issuance of a permit based December 8 2022 on construction documents and other data shall 970.404.3100 not prevent the City of Aspen from requiring the correction of errors in the construction info@jvajva.com documents and other data. Wyatt Young—Project Manager City of Aspen www.jvajva.com 201 North Mill Street Aspen, CO 81611 RE: 309 Oak Lane Variance Request 3529c Dear Wyatt, We are writing this letter as a formal variance request for a proposed drywell system located at 309 Oak Lane, Aspen, Colorado. The variance process is described in the City of Aspen Municipal under section 29.01.070— Variances. The process is described and addressed below. - 29.01.070(a)—The City Engineer may grant variances to the Engineering standards. Variances are deviations from the terms of this Chapter which would bot be contrary to the public interest. We are submitting this variance request for review from the City. - 29.01.070(b)—In order to authorize a variance from the Engineering standards or construction management regulations, the following standards shall be met: o (1)—There exist practical difficulties and unnecessary hardships inconsistent with the purpose and intent of the Engineering standards. The project consists of a structure with a footprint that takes up a large portion of the property. The existing and proposed conditions will not allow for the drywell to be both 10'off of the property line and 10'off of the foundation. o (2)—The issuance of a variance shall not compromise the safety of a site or structure. The issuance of the variance will not compromise the safety of the site or structure. The drywell is located as far from the structure as possible while remaining within the property lines. - 29.01.070(c)—Requests for variances from the standards, policies or submittal requirements of this document shall be submitted in writing with appropriate documentation and justification to the City Engineer. An application for a variance from the Engineering standards shall include, at a minimum, the following information: o (1)—The criteria from which the applicant seeks a variance We request a variance from the URMP's distance requirements from the property line. BOULDER FORT COLLINS WINTER PARK GLENWOOD SPRINGS DENVER I ' 3529c—309 Oak Ln i i� Variance Request `J`J"" 12/8/2022 2 of 2 CONSULTING ENGINEERS o (2)—A written justification outlining why the criterion cannot be met. The size of the proposed structure does not allow for the distance requirements to be met. Site size and grades do not allow for an at grade solution to be utilized. o (3)An alternate criteria or standard that is proposed to comply with the intent of the criteria from which the variance is sought. We have located the drywell as far from the structure as possible while keeping it within the property line. The drywell is located 10 ft from northwest building face, 9 ft from the sumped entrance, 6 in from the property line, and 9.5 ft from the curb &gutter along Ajax Ave. o (4)—Supporting documentation, including necessary calculations, etc. Please see submitted plans. o (5)—An explanation of any potential adverse impacts of the proposed variance to adjacent landowners. No adverse impacts are expected at this time. Runoff making it to the ROW has been reduced with this development. o (6)—An analysis of the variance request must be signed and stamped by a professional engineer licensed in the State of Colorado. Sincerely, S P e7..<\,p+, • JVA, INCORPORATED = ; `•o • 1789 By: go /0A J.R. Spung, P.E. 8 2022 Senior Project Manager