HomeMy WebLinkAboutFile Documents.134 E Bleeker St.0102-2020-BRES (34) Engineering) - 134 E Bleeker St - 0102-2020-BRES
40.Drainage Narrative.20200812.pdf(3)
Page: C-5 2014
right of way,including new curb and gutter along Not File Name: 40.Drainage Narrative.20200812.pdf
'ections at the intersection,and sidewalk following Eas
meeting the City of Aspen Engineering Design Stant
osed.
2014 OK
[dies
IRMP r nd the property is within the boundar This date has been corrected.
prope within a Mudflow area.
no analysis was required.
�_ ,� Page: C 7 A little confusing here.
a�a..W_."° ° w ..,, .v File Name: 40.Drainage Narrative.20200812.pdf Previously it's mentioned that
~17:l^7.7I"`I- • " I-~;I ^ Basin 1 (which appears to be the
After basin adjustments,the overall entire site)has an
0 0
• "^�"" imperviousness is approximately 59/o. imperviousness of 84/o. Then
here it indicates the site is
w •u °mW "°°° gym° collectively 58% impervious.
Please clarify.
., °ww°� ,�°," .,. ,av,,,�° R OK
�
Page: C-9 Use a factor of safety of 1.5 for
File Name: 40.Drainage Narrative.20200812.pdf drywells.
o ptS r urutsat,W we g gma
1 226s q '3' A factor of safety of 1.5 was used and the
Luse a factor of safety of 1.5 for drywells. drywell has been resized accordingly. See
C8 for drywell elevations and Drainage OK
•ater infrastructure.All hydraulics are sized
;ned to route all impervious surfaces to the Report a updated calculations.
pr each sub-basin was calculated. forpll ll
tions
90.Civil Plans.20200812.pdf(18)
Page: Cl
File Name: 90.Civil Plans.20200812.pdf Provide an excavation
stabilization plan.
Provide an excavation This is the responsibility of the contractor.
stabilization plan. This plan set and excavation letter has been Not
Provi
included with this submittal. ded
A.B.C. AG(
Page: C5
File Name: 90.Civil Plans.20200812.pdf Include entire site in analysis of
drainage(add basins for all
areas on site).
•
S Year Peak D Drainage analysis has been redone to oK
account for the entire site. See sheet C5 and
Include entire site in analysis of drainage
(add basins for all areas on site). updated Drainage Report.
RECEIVED
03/26/2021
ASPEN
BUILDING DEPARTMENT
_� A Page: C6
File Name: 90.Civil Plans.20200812.pdf Provide wings on all sidewalk
ramps.
_ OK
Wings have been designed for each sidewalk
ramp. See sheet C10.
-xwt,
�; Page: C6 Is there an existing easement
--„ „ C� File Name: 90.Civil Plans.20200812.pdf
�`- 7� with sufficient clearance
--- °5` distances around this
„ritimam3 "�' The electric line has been rerouted to a transformer vault?
transformer on a nearby property. The
relevant easement book and page number Existing easeement does not
/ �w E. have been called out. have adequate dimensions.
® Page: C6
((� File Name: 90.Civil Plans.20200812.pdf The fire suppression calculations
INSTALL PROPOSED WATER TAP indicate a 1.5" line at Node 10 is
AS PER CITY OF ASPEN SPECS sufficient. Please verify the
MINIMUM 1B"FROM EXISTING
2"SERVICE TO BE VERIFIED BY
FIRE SUPPRESSION DESIGN required water service line size
RFE has verified the fire suppression calculations for fire protection.
and a 1.5"line is sufficient and has been called out
far"" P e�o oa on sheet C6.A memo is attached detailing these OK
calculations.
Page: C6 Ensure the light base sits 4" provide
File Name: 90.Civil Plans.20200812.pdf above grade toprevent water
Light Post
;';, damage. Will the light be detail
.1=11 reinstalled in the exact same
..• The light will be relocated to accommodate the position or is it relocated to
» --- -- sidewalk.A 4"minimum base and elevation has accommodate the sidewalk?
ZEaaI been called out on sheet C6.Elevation 4" above Contractor to verify there is
grade=7895.707'. adequate slack in the electric
lines to move the lightpole.
Page: C6
Easy 13 --xWl., The existing conditions sheet
74.,8. KER File Name: 90.Civil Plans.20200812.pdf
R'ciir oFSgREEr shows an existing valve on this
The existing tap has been shown on C6 and the water main. Show the valve on
the utilites sheet and ensure no
The existing conditions sheet water line has been relocated to be 3'from the conflict between the valve and
shows an existing valve on this
water main.Show the valve on existing tap to ensure there is no conflict new tap.
the utilites sheet and ensure no
conflict between the valve and between the two.
new tap.
OK
RECEIVED
03/26/2021
ASPEN
BUILDING DEPARTMENT
// Page: C7
7 The variance request to place
/// — File Name: 90.Civil Plans.20200812.pdf
//,I - the drywell within 10'of the
I� f See the attached memo from the Structural building foundation requires a
IThe variance request to place the drywell w;thin 10'of the stamped memo from the
°°"cturalEngineerstafinesa stamped memo from the „ Engineer. structural Engineer stating it will
structural Engineer stating it will have no negative effect
°°thef°°nda`i°° J//. have no negative effect on the
---------------
foundation.
Not
--------- ---
t " provi
--- ded.
Page: C7
File Name: 90.Civil Plans.20200812.pdf Provide inverts for all
a�° downspouts and catch basins.
/
/
——jProvide inverts for all Invert elevations have been added to sheet C7.
-- downspouts and catch basins.
OK
/ °
p _______ ________ Page: C7
File Name: 90.Civil Plans.20200812.pdf It appears Storm Line D conflicts
with the drywell.Verify all the
/ bends and fittings can fit in the
/ It appears Storm Line D limited area.
/ conflicts with the drywell.Verify The drywell has been relocated slightly south to
/ all the bends and fittings can fit
in the limited area. - avoid conflict with Storm Line D. See sheet C7. OK
1. "/�a
: Page: •
C7
I File Name: 90.Civil Plans.20200812.pdf The soils report needs to include
a perc test and/or address the
® a/. appropriateness of the use of a
The soils report needs to include a pare test and/or / _ See the attached Soils Report indicating drywell given the site soil
—address the appropriateness of the use of a drywell given —,� characteristics.
_theaitesodcharacteristics. / that a drywell is suitable. A drywell was
was,/
chosen because the site is too small for an Not ADDRESSED
Ile above ground storage option, such as a
detention basin.
Page: C8
File Name: 90.Civil Plans.20200812.pdf Do not see a profile for Storm
System D.
Do not see a profile for Storm A profile for Storm System D has been added.
System D. See sheet C8.
OK
RECEIVED
03/26/2021
ASPEN
BUILDING DEPARTMENT
Page: C9
File Name: 90.Civil Plans.20200812.pdf Properties adjacent to alleys with
sidewalks are required to install
an alley apron if one is not
present. Please include the
An alley apron has been designed according to installation of the alley apron.
` " "` detail 2021. See sheet C11. Follow detail 2021 of the COA
<M <i ( Engineering Desi rds.
OK
o _,`' Page: C9 This snowmelt call out does not
File Name: 90.Civil Plans.20200812.pdf
a>s« align with the landscape plans.
The landscape plans show no
RFE s snowmelt plan has been altered to match
snowmelt in the ROW. Verify
, e, the landscape plans. See sheet C9 for snowmelt both plans align and show
e complete extents of the OK
callouts. snowmelt.
' The snowmelted walkway
°"�° cannot extend through the
sidewalk as it creates icing
issues.
Page: C10 Provide a detail for the
File Name: 90.Civil Plans.20200812.pdf
D "depressed"curb as called out
across the alley in the plan view.
35.0/S 0.00'L
P� a°e,a l3pr me
GUTTER tEe alley In Use plan our
36.0/S 0.00 The depressed curb has been replaced with an
NSITGN OK
ABLEECURB AND"GUTTTEER alley apron. See sheet C17 for COA detail.
\
35.0/S 0.00'R
3ITION
ABLE CURB AND GUTTER
TA :- Page: C10
File Name: 90.Civil Plans.20200812.pdf Provide wings on all sidewalk
ramps.
r ithii,
tl Wings have been designed for each sidewalk
lihkx................„.. 116! ramp. Sec sheet C10.
Provitle wings on all sidewalk OK
ramps.
air
f. , .. �. ,.. Page: C11 0
}{ "9'>° File Name: 90.Civil Plans.20200812.pdf Call out 2%cross slopes on
.. / �,.30 ramps.
as.3s , .ersssz>� S= � ?0p.
a0ss3> OK
!! „ 6 Cross slopes have been called out.
,s< was: V
<a ,,,&aeean
Sao ,
4
RECEIVED
03/26/2021
ASPEN
BUILDING DEPARTMENT
Page: C14
File Name: 90.Civil Plans.20200812.pdf Replace this detail with COA
Engineering Standard detail
E.E5="r",
207A
Detail 207A has been inserted(see sheet C14).
o RED To BE GREATER THAN PART See C4 for demo asphalt patch. Call out asphalt patch per City of
Aspen Engineering Standards
$TRFFj
ox WD
sinxoavEXCAVATION
SAW CUT
SA FULL DEPTH a
NG
ASPHALT
OK
RECEIVED
03/26/2021
ASPEN
BUILDING DEPARTMENT