HomeMy WebLinkAboutInspection.309 Oak Ln.0021-2022-BRES (10) N1II GEOTECHNICAL ENGINEERING GROUP Grand Valley Consulting, LLC dba Geotechnical Engineering Group Daily Field Report Job Name: Campaigne Tables Job #: 4890 Date: 10-31-2022 Weather Conditions & Temperature: Indoor SHOP located at 834 21 1/2 Road Contractor's Construction Activities: Grand Junction, Colorado for 309 Oak Lane, Aspen, CO 81611 Assembly of Framing and Sheathing on panels E201, E202, E112, E115 and E114 Major Equipment: GEG's Site Activities: Observe Framing and Sheathing on panels E201, E202, E112, E115 and E114 Verbal Communications With (circle one): Contractor/ Engineer / Owner / Architect Name: Ryan Company: PhoenixHaus Field Technician: Chris Hill, EIT Reviewed By: Jason Marquiss Record 5 111 GEOTECHNICAL ENGINEERING GROUP Framing and Sheathing Observation Report GEG Job NO.: 4890 Structural Engineer: Eclipse Engineering Project Name: Campaigne Tables Technician: Chris Hill, EIT Phoenixhaus Project NO.: 212-042 Reviewed by: Jason Marquiss Date: 10-31-2022 Client/On-site Rep: Ryan Panel Name (Location): E201 Plan Title: Framing and Sheathing Plan By:Y. Perrudin Date: 19-10-2022 Project Number 21-04-185 Observation k Nailing spec, Per Shop Drawing Stud spacing, Per Shop Drawing k 1/16" max nail head depth C Blocking, Per Shop Drawing lk Layout breaks on stud Header(s) size ® No shiners/(Replaced) Notes/Exceptions: This is a record of shop observation of construction at 2510 Foresight Circle, Grand Junction, Colorado. None Person Notified of Non-Compliance: NA Proposed Correction and Schedule for Correction: NA X With the exceptions noted above, in our opinion, the conditions observed were in conformance with the referenced plan sheet(s). FS Fig: 11 111 GEOTECHNICAL ENGINEERING GROUP Framing and Sheathing Observation Report GEG Job NO.: 4890 Structural Engineer: Eclipse Engineering Project Name: Campaigne Tables Technician: Chris Hill, EIT Phoenixhaus Project NO.: 212-042 Reviewed by: Jason Marquiss Date: 10-31-2022 Client/On-site Rep: Ryan Panel Name (Location): E202 Plan Title: Framing and Sheathing Plan By:Y. Perrudin Date: 19-10-2022 Project Number 21-04-185 Observation k Nailing spec, Per Shop Drawing Stud spacing, Per Shop Drawing k 1/16" max nail head depth C Blocking, Per Shop Drawing lk Layout breaks on stud Header(s) size ® No shiners/(Replaced) Notes/Exceptions: This is a record of shop observation of construction at 2510 Foresight Circle, Grand Junction, Colorado. None Person Notified of Non-Compliance: NA Proposed Correction and Schedule for Correction: NA X With the exceptions noted above, in our opinion, the conditions observed were in conformance with the referenced plan sheet(s). FS Fig: 12 111 GEOTECHNICAL ENGINEERING GROUP Framing and Sheathing Observation Report GEG Job NO.: 4890 Structural Engineer: Eclipse Engineering Project Name: Campaigne Tables Technician: Chris Hill, EIT Phoenixhaus Project NO.: 212-042 Reviewed by: Jason Marquiss Date: 10-31-2022 Client/On-site Rep: Ryan Panel Name (Location): E112 Plan Title: Framing and Sheathing Plan By:Y. Perrudin Date: 19-10-2022 Project Number 21-04-185 Observation k Nailing spec, Per Shop Drawing Stud spacing, Per Shop Drawing k 1/16" max nail head depth C Blocking, Per Shop Drawing lk Layout breaks on stud Header(s) size ® No shiners/(Replaced) Notes/Exceptions: This is a record of shop observation of construction at 2510 Foresight Circle, Grand Junction, Colorado. None Person Notified of Non-Compliance: NA Proposed Correction and Schedule for Correction: NA X With the exceptions noted above, in our opinion, the conditions observed were in conformance with the referenced plan sheet(s). FS Fig: 13 111 GEOTECHNICAL ENGINEERING GROUP Framing and Sheathing Observation Report GEG Job NO.: 4890 Structural Engineer: Eclipse Engineering Project Name: Campaigne Tables Technician: Chris Hill, EIT Phoenixhaus Project NO.: 212-042 Reviewed by: Jason Marquiss Date: 10-31-2022 Client/On-site Rep: Ryan Panel Name (Location): E115 Plan Title: Framing and Sheathing Plan By:Y. Perrudin Date: 19-10-2022 Project Number 21-04-185 Observation k Nailing spec, Per Shop Drawing Stud spacing, Per Shop Drawing k 1/16" max nail head depth C Blocking, Per Shop Drawing lk Layout breaks on stud Header(s) size ® No shiners/(Replaced) Notes/Exceptions: This is a record of shop observation of construction at 2510 Foresight Circle, Grand Junction, Colorado. None Person Notified of Non-Compliance: NA Proposed Correction and Schedule for Correction: NA X With the exceptions noted above, in our opinion, the conditions observed were in conformance with the referenced plan sheet(s). FS Fig: 14 111 GEOTECHNICAL ENGINEERING GROUP Framing and Sheathing Observation Report GEG Job NO.: 4890 Structural Engineer: Eclipse Engineering Project Name: Campaigne Tables Technician: Chris Hill, EIT Phoenixhaus Project NO.: 212-042 Reviewed by: Jason Marquiss Date: 10-31-2022 Client/On-site Rep: Ryan Panel Name (Location): E114 Plan Title: Framing and Sheathing Plan By:Y. Perrudin Date: 19-10-2022 Project Number 21-04-185 Observation k Nailing spec, Per Shop Drawing Stud spacing, Per Shop Drawing k 1/16" max nail head depth C Blocking, Per Shop Drawing lk Layout breaks on stud Header(s) size ® No shiners/(Replaced) Notes/Exceptions: This is a record of shop observation of construction at 2510 Foresight Circle, Grand Junction, Colorado. None Person Notified of Non-Compliance: NA Proposed Correction and Schedule for Correction: NA X With the exceptions noted above, in our opinion, the conditions observed were in conformance with the referenced plan sheet(s). FS Fig: 15