Loading...
HomeMy WebLinkAboutFile Documents.1050 Waters Ave.0003-2024-BREP (7) Aspen Foundation Repairs LLC THE BEST TECHNOLOGY IN FOUNDATION SOLUTIONS Memo on installation procedures for hydraulic pushed piers and retaining wall for: 1050 Waters Ave. Aspen Colorado 81611 • All vehicles will be staged at the regular parking lot of the building. • All excavation and backfill be completed by hand • All materials will be transported by hand down the hill and under the structure • No heavy equipment is need for this project and won't be used • Our scope of work is limited to under the house and the outside perimeter • All excavation will be done under the house and will not in any way interfere with the stream • The retaining wall will be installed above grade at the exterior perimeter • The excavation for the retaining wall will be 6" deep and dug by hand • There will be no disruption to the existing ecosystem other than the crew walking back and forth for the duration of the job. We.cid 5vuA ; ' Michel Bervaldi Aspen Foundation Repairs LLC 04/10/2024 RECEIVED 04/16/2024 ASPEN BUILDING DEPARTMENT