Loading...
HomeMy WebLinkAboutSub Permit.22 W Water Pl.0117-2020-BRESClose Window Print This Page Expand All | Collapse All 0015-2021-ELEC Number 0015-2021-ELEC Record Type Electrical 22 W WATER PL Owner Lilly Culver Original Number 21-0112 Status Closed - Final Type Electrical Reason for Cancel or Compl. Review Fail Applicant Ember Shannnon Sage Jones No DURGIN ELECTRIC LLC Yes Project Master Building Permit 0117-2020-BRES Land Use Planning Application Supplemental Permit?No Permit Contractor DURGIN ELECTRIC LLC Supplemental/Addendum Master Permit Valid Business License on Account HPC-ZON-EH-UTIL Review Imported HPC-ZON-EH-UTIL Review-2 Required Submissions Eng Review Documents Resubmitted Parks-Prkng-San Review Conditional Inspections Conditional Final Insp Action Items Hold Reason Conditional Flat Fee Formula SupN,2021 Conditional Tiered Fee Formula Discount All Fees (%) Conditional Tiered SqFt Fee Formula ERN,Fee Discount Reason Dates 1/21/2021 7/1/2021 1/22/2021 Expiration Date 8/6/2022 1/22/2021 1/29/2021 7 Close/CO Issuance Date 2/8/2022 Milestone Current Days in City Hands Job Location Address 22 W WATER PL, ASPEN : 273513204019 Legal Description Subdivision: WATER PLANT AFFORDABLE HOUSING Lot: 19 Site Address Display on Map Historic Property?No Historic District?No Zoning Lot 19 HPC Certificate of Appropriateness? Zone District PUB HOA/Covenant Deed Restricted? Work Details Use of Building Single Family Work in a Setback?No Use Class Residential Exterior Lighting Added or Changed? No Class of Work Addition Photovoltaic Installation No $5,462.83 NO Reason for Valuation Change NO 550 No Description Providing electrical wiring for basement.System Size in kW Battery Storage?No No Code Editions MEP Address Aspen Internal? Account Is This Associated w/a Building Permit? Hold All Reviews Create Fees Create Fees 2 Price Book New Application Date Last Activity Date Application Complete Date Application Accepted Date Due Date Issue Date Override Expiration Date Days to Issue Milestone Current Days in Applicant Hand Eden Address Valuation City of Aspen Electrical Service? New or Upgraded Service? Sq Ft of Building Work Area Other Distributed Energy System? Work Affects Exterior of Building? Affects Parking/Alleys/Loading?Permit Comments 3/4/25, 7:58 PM 0015-2021-ELEC ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a034o00000FNVxKAAX/p 1/4 Financials $155.00 Total Payments $155.00 Total Balance $0.00 System Information Number 0015-2021-ELEC Community Visibility Created By Ember Jones, 1/21/2021 11:51 AM 0036A00000mXoCFQA0,0036A00000mXoCZQA0,0036A00000ZPoDLQA1 Last Modified By Aspen Avocette, 9/28/2024 1:57 AM VIP Form Tool VIP Foreign Language VIP Form Template Permit Application IsTestData?VIP Template Status [{"parentCategoryId":null,"isSubmit":null,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryId":"a2E6A000000UwvPUAS"}, {"parentCategoryId":null,"isSubmit":null,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryId":"a2E6A000000UwvNUAS"}, {"parentCategoryId":"a2E6A000000UwvgUAC","isSubmit":null,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryId":"a2E6A000000Uz2 {"parentCategoryId":null,"isSubmit":null,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryId":"a2E6A000000UwvaUAC"}, {"parentCategoryId":null,"isSubmit":null,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryId":"a2E6A000000UwvZUAS"}, {"parentCategoryId":null,"isSubmit":true,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryId":"a2E6A000000Ux1dUAC"}] VIP Submitted 1/21/2021 3:35 PM Action Items View/Print Permit Link Attachment Activity History Email: Electrical permit 0015-2021-ELEC - 22 W Water Pl - Issued Type Billable Assigned To Lilly Culver Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 1/29/2021 Days in Applicant's Hands Comments To: ember@durginelectric.com CC: BCC: Attachment: 0015-2021-ELEC - 22 W Water Pl.pdf Subject: Electrical permit 0015-2021-ELEC - 22 W Water Pl - Issued Body: Good Afternoon, Please find attached your issued electrical permit for 22 W Water Pl. If you have any questions please let us know. Kind regards, Lilly Culver Email: Permit Fees Due Type Billable Assigned To Lilly Culver Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 1/29/2021 Days in Applicant's Hands Comments To: ember@durginelectric.com CC: BCC: Attachment: --none-- Subject: Permit Fees Due Body: If you have not already paid the fees due on your permit 0015-2021-ELEC, at 22 W WATER PL, ASPEN : 273513204019 , please log into the Aspen Permitting Portal to pay them. If you pay online, be aware that credit card transaction fees will apply. If you would like to pay by check, you can mail payments to the following locations: • Building and related permits: Community Development, 130 S Galena St., 3rd Floor • Construction parking permits: Parking Department, 201 N Mill St., Garden Level • Pitkin County Water Permit: Utility Billing., 130 S Galena, 1st Floor • ROW and encroachments: 201 N Mill St., Suite 203 • Tree permits: Parks Dept., 585 Cemetery Lane Aspen • Utility Connection Permits: Utility Billing., 130 S Galena, 1st Floor • Electric Community Investment Fee: Utility Billing., 130 S Galena, 1st Floor Current Amount Due: $155.00 Other Code Editions Total Fees Contact IDs 3/4/25, 7:58 PM 0015-2021-ELEC ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a034o00000FNVxKAAX/p 2/4 Instructions to see detail of fees due: - Log in to the Portal here: https://cityofaspen.force.com/applicantportal and click on Permits menu - Open the permit by clicking on the permit number link - Click on the Related tab (next to Details tab) and scroll down to Fees section - If all fees are not visible, click the “View All” link - To filter fees, click on the black funnel icon at the top right. (Example: to only see the fees due at permit submission, select “Complete Pending Submittal Fees” under Permit Fees Due At section and then click Apply button.) Thank you! City of Aspen Permit Inspection Type Inspection Billable Assigned To Steve Feder Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 2/11/2021 Days in Applicant's Hands Comments Permit Review Type Building Billable Assigned To Steve Feder Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 1/28/2021 Days in Applicant's Hands Comments Permit Inspection Type Inspection Billable Assigned To Ric Bennett Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 7/1/2021 Days in Applicant's Hands Comments Contacts Ember Shannnon Sage Jones Account DURGIN ELECTRIC LLC Type Applicant Active Contractor License Count 2.00 Number 0033437 Todd E Hibbard Account DURGIN ELECTRIC LLC Type Contractor Active Contractor License Count 2.00 Number 0033439 STEVE DURGIN Account DURGIN ELECTRIC LLC Type Contractor Active Contractor License Count 2.00 Number 0033541 Fees 0055803 Type Electrical Permit Fee Total $155.00 Waived/Refunded Amt Discount $ Outstanding $0.00 Fee Due At Ready for Issue Show in Cart Paid in Full Fee Paid Date/Time Files 0015-2021-ELEC - 22 W Water Pl Last Modified 1/29/2021 3:30 PM Created By Lilly Culver MEP_Permit_Letter__20210129.docx Last Modified 1/29/2021 3:28 PM Created By Lilly Culver 3/4/25, 7:58 PM 0015-2021-ELEC ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a034o00000FNVxKAAX/p 3/4 Permit Application 2021-01-21 22:36:05.pdf Last Modified 1/21/2021 3:36 PM Created By Ember Jones Inspections INS-0000989-21 Status Accepted as Noted Type Electric Subtype Rough Electrical Requested Date 2/9/2021 3:44 PM Scheduled Start Date 2/10/2021 Completed Date 2/10/2021 Owner Last Name MILLER Permit Inspection Round Initial Inspection Closed TRUE INS-0000994-21 Status Pass/Accepted Type Electric Subtype Final Electrical Requested Date 6/29/2021 9:00 AM Scheduled Start Date 6/30/2021 Completed Date 6/30/2021 Owner Last Name Bennett Permit Inspection Round Initial Inspection Closed TRUE Milestones Review Round 1 - 0015-2021-ELEC Status Approved Due Date Created Date 1/22/2021 Payments PY-007851 Related To 0015-2021-ELEC Amount $155.00 Created Date 1/29/2021 Payment Source R-0007475 Receipt - Amount Remaining R-0007475: $0 Reviews REV-016946 Milestone Review Round 1 - 0015-2021-ELEC Status Approved Type MEPs Due Date Completed Date 1/28/2021 7:26 AM Owner Alias MMill On Hold Created Date 1/22/2021 Submissions Application for Photovoltaic (PV) Installation Form Actions Upload Submission Date Status Pending Required Description City of Aspen Electric Load Form – Application for Service Actions Upload Submission Date Status Pending Required Description Homeowner Association Compliance Form Actions Upload Submission Date Status Pending Required Description Copyright © 2000-2025 salesforce.com, inc. All rights reserved. 3/4/25, 7:58 PM 0015-2021-ELEC ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a034o00000FNVxKAAX/p 4/4