Loading...
HomeMy WebLinkAboutSub Permit.334 McSkimming Rd.0073-2020-BRES (3)Close Window Print This Page Expand All | Collapse All 0051-2020-UTWC Number 0051-2020-UTWC Record Type Utility Water Connection 334 MCSKIMMING RD Owner Robert Gregor Original Number 20-2581 Status Closed - Final Type Utility Water Connection Reason for Cancel or Compl. Review Fail Applicant BARRY GEREB No BG DESIGN LLC Imported Project HPC-ZON-EH-UTIL Review Permit Contractor Eng Review Yes Parks-Prkng-San Review Master Building Permit 0073-2020-BRES Conditional Inspections Conditional Final Insp Supplemental/Addendum Master Permit Action Items 2020 Hold Reason Permit Dates 10/8/2020 Expiration Date 10/13/2020 10/13/2020 9/3/2021 0 325 Milestone Current Days in City Hands 0 Close/CO Issuance Date 3/7/2024 Job Location Address 334 MCSKIMMING RD, ASPEN : 273718103002 Lot 11 Site Address Display on Map Block Historic Property?No Legal Description Subdivision: ASPEN GROVE Block: 2 Lot: 11 Historic District?No Zone District R-15B Property Information Common Building Name Already on City Water?Yes Public Building?No Class of Service Customer Single-Family In a Park?No 02-35071840-07 Other Use Water Service Area 2 Inside City Boundaries? Project Information Use of Building Single Family 0.75 Use Class Residential 1.00 Class of Work New 2.00 2.67 2.00 Number of Meters Proposed 1 Description SCOPE OF WORK FOR 334 McSKIMMING ROAD: THE EXISTING SITE CONTAINS A 1,552 S.F. HOME THAT WILL BE DEMOLISHED. THE EXISTING HOME WILL BE REPLACED BY A NEW SINGLE FAMILY HOME. THE NEW HOME OF 3,129 S.F. WILL BE ONE STORY WITH A WALKOUT LOWER LEVEL, AND A TWO CAR GARAGE. THE NEW HOME WILL SITED WITHIN THE SETBACKS (30' FRONT, 5' SIDES, 10' REAR). THE ONLY TREES TO BE REMOVED ARE THOSE THAT ARE AFFECTED BE THE CONSTRUCTION, NEW TREES WILL BE PLANTED PER CITY GUIDELINES. THE NEW HOME WILL HAVE 3 BEDROOMS. THE HOME MEETS HEIGHT AND F.A.R. GUIDELINES AND Address Aspen Internal? Account Is This Associated w/a Building Permit? Is this an Addendum Permit? Hold All Reviews Price Book New Application Date Application Complete Date Override Expiration Date Application Accepted Date Last Activity Date Issue Date Milestone Current Days in Applicant Hand Days to Issue Eden Address Utility Account Number Size of Existing Domestic Water Line Size of Proposed Domestic Water Line Size of Existing Fire Suppression Line If Residential App, Estimated New ECUs Size of Proposed Fire Suppression Line 3/4/25, 7:51 PM 0051-2020-UTWC ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000vSQo4AAG/p 1/5 IS DESIGNED USING THE CURRENT CODES THAT ARE BEING USED BY THE CITY OF ASPEN. CO Description Raw Water Information City of Aspen Is There Well or Wells on the Property? Does Project Involve Outdoor Irrigation? Yes 0 Irrigated Area Sq Ft 7,670 0 49042 gal/season, City of Aspen, irrigation Is There a Pool, Spa or Water Feature? No No Water Service Requests New Tap?No Abandon Existing Tap No Existing Tap Modifications?No Abandon Existing Well No Internal Use Only Existing ECU Count Utility Investment Charge (Tap Fees) Final ECU Count Utility Investment Charge Paid Date of Existing Tap Date of New Tap Utility Hookup Charge Paid CO Status if Applicable Date of CO Cash in Lieu Paid CO Approved Date Well Development Charges Date of Final Connection Fee Payment Well Development Charges Paid Water Service Agreement Required? Summary of Prior Water Fees Paid Status of Final Agreement Financials Total Payments Fees Paid Total Balance $0.00 System Information Created By BARRY GEREB, 9/22/2020 8:05 AM Last Modified By Aspen Avocette, 9/28/2024 1:34 AM Number 0051-2020-UTWC VIP Form Tool VIP Foreign Language VIP Form Template Permit Application VIP Submitted 10/8/2020 9:45 AM VIP Template Status [{"parentCategoryId":null,"isSubmit":null,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryId":"a2E6A000000UwvPUAS"}, {"parentCategoryId":null,"isSubmit":null,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryId":"a2E6A000000UwvNUAS"}, {"parentCategoryId":"a2E6A000000UwvhUAC","isSubmit":null,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryId":"a2E6A000000Uwvd {"parentCategoryId":null,"isSubmit":null,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryId":"a2E6A000000UwvaUAC"}, {"parentCategoryId":null,"isSubmit":null,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryId":"a2E6A000000UwvZUAS"}, {"parentCategoryId":null,"isSubmit":true,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryId":"a2E6A000000Ux1dUAC"}] Action Items View/Print Permit Link Attachment Activity History Email: Utility Connection Permit Final Type Billable Assigned To Steve Wilson Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 2/6/2024 Days in Applicant's Hands Comments To: barry.gereb@bgadaspen.com CC: kathy.rogo@aspen.gov; andy@terralinkstructures.com; tyler@terralinkstructures.com BCC: Attachment: 334 McSkimming Rd. Final Packet.pdf Subject: Utility Connection Permit Final Body: Hello BARRY GEREB, NOTE: I understand that you're no longer involved in this project. You are the default contact person in Salesforce, and I couldn't remove your name from the Identify ALL Sources of Water Acre-feet of Water Currently by Well Acre-feet of Water Rights to be Conveyed Indicate Amt, Source, and Use of Water Do Water Feat use Recirc/Recycled Water? Utility Hookup Charge Cash in Lieu Total Fees 3/4/25, 7:51 PM 0051-2020-UTWC ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000vSQo4AAG/p 2/5 mailing list. Attached is your final Utility Connection Permit for the completed project at 334 MCSKIMMING RD associated with permit #: 0051-2020-UTWC. After review, please print, have signed by owner, and notarized. Once signed and notarized, please return UCP with payment, if applicable, to the Finance Department window located on the second floor of City Hall at 427 Rio Grande Place. Alternatively, you may upload the signed and notarized copy of the UCP as a SCANNED (not photographed) .pdf file and pay all fees due via Salesforce, but if submitting via Salesforce, please send a chatter to @Robert Gregor and @Cole Langford on the permit record once the document is uploaded and all fees are paid to serve as a “push” notification that these permit requirements are complete. Please reach out with any questions or concerns. Thanks, Tyler and Andy. Steve Email: Utility Connection Permit Review Type Billable Assigned To Aaron Reed Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 8/3/2021 Days in Applicant's Hands Comments To: barry.gereb@bgadaspen.com CC: BCC: Attachment: UCP_review__334 McSkimming.pdf Subject: Utility Connection Permit Review Body: Hello BARRY GEREB, Attached is your review Utility Connection Permit for the proposed project at334 MCSKIMMING RD associated with permit #: 0051-2020-UTWC After review, please print, have signed by owner and notarized. Once signed and notarized, please return with payment, if applicable, to the Finance Department window located on the first floor of City Hall at 130 S. Galena St. Please reach out with any questions or concerns. Email: Utility Connection Permit Review Type Billable Assigned To Aaron Reed Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 11/18/2020 Days in Applicant's Hands Comments To: barry.gereb@bgadaspen.com CC: BCC: Attachment: UCP_review__334 McSkimming.pdf Subject: Utility Connection Permit Review Body: Hello BARRY GEREB, Attached is your review Utility Connection Permit for the proposed project at334 MCSKIMMING RD associated with permit #: 0051-2020-UTWC After review, please print, have signed by owner and notarized. Once signed and notarized, please return with payment, if applicable, to the Finance Department window located on the first floor of City Hall at 130 S. Galena St. Please reach out with any questions or concerns. Thank you, Aaron Reed (970) 920-5123 Email: CSI Comments - 0051-2020-UTWC - 334 MCSKIMMING RD Type Billable Assigned To Phil LeHue Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 10/25/2020 Days in Applicant's Hands Comments To: barry.gereb@bgadaspen.com CC: aaron.reed@cityofaspen.com; robert.gregor@cityofaspen.com BCC: Attachment: Copy of 50.Residential ECU Calculator 2020.20200814.xlsx Subject: CSI Comments - 0051-2020-UTWC - 334 MCSKIMMING RD Body: Hello BARRY GEREB, 3/4/25, 7:51 PM 0051-2020-UTWC ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000vSQo4AAG/p 3/5 I’ve reviewed your permit application as it pertains to Water Review for the project at 334 MCSKIMMING RD (permit #: 0051-2020-UTWC). Please contact Aaron Reed directly if you have any questions on the comments. I've attached the ECU Calculator for reference. Based on the Landscape plans, comments have been made regarding the irrigated landscaping area as well the drip emitters proposed. Please reference the attached ECU and revise to include the actual count of drip emitters as well as the total irrigated landscaping square footage. Address: 334 MCSKIMMING RD Permit Number: 0051-2020-UTWC Reviewer: Aaron Reed/Phil LeHue Permit Coordinator: Robert Gregor Master Permit: 0073-2020-BRES Thank you, City of Aspen Engineering Contacts BARRY GEREB Account BG DESIGN LLC Type Applicant Active Contractor License Count 0.00 Number 0030952 RICHARD HAMPLEMAN Account RICHARD HAMPLEMAN Type Architect or Engineer of Record Active Contractor License Count 0.00 Number 0030953 MARGOT HAMPLEMAN Account DECORATIVE MATERIALS Type Owner Active Contractor License Count 0.00 Number 0030954 Files 334 McSkimming Road Irrigation Update Final UCP Packet Last Modified 9/3/2024 1:17 PM Created By Aaron Reed UCP_review__334 McSkimming Last Modified 11/18/2020 10:35 AM Created By Aaron Reed Permit Application 2020-10-08 15:45:53.pdf Last Modified 10/8/2020 9:45 AM Created By BARRY GEREB 334 McSkimming Rd. Final Packet Last Modified 2/6/2024 4:05 PM Created By Steve Wilson Copy of 50.Residential ECU Calculator 2020.20200814 Last Modified 10/25/2020 5:07 PM Created By Phil LeHue Milestones Review Round 1 - 0051-2020-UTWC Status Not Approved Due Date Created Date 10/13/2020 Review Round 2 - 0051-2020-UTWC Status Approved Due Date Created Date 9/3/2021 Permit History 3/7/2024 4:58 PM User Robert Gregor Action Changed Status from Ready for Closure to Closed - Final. 3/7/2024 4:58 PM User Robert Gregor Action Changed Status from Issued to Ready for Closure. Reviews REV-020647 Milestone Review Round 2 - 0051-2020-UTWC Status Approved Type Engineering Water Due Date Completed Date 9/3/2021 10:57 AM Owner Alias Engineering Water - Review On Hold Created Date 9/3/2021 REV-015604 Milestone Review Round 1 - 0051-2020-UTWC Status Closed - Re-Review Created Type Engineering Water 3/4/25, 7:51 PM 0051-2020-UTWC ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000vSQo4AAG/p 4/5 Due Date Completed Date 11/16/2020 2:08 PM Owner Alias AReed On Hold Created Date 10/13/2020 Copyright © 2000-2025 salesforce.com, inc. All rights reserved. 3/4/25, 7:51 PM 0051-2020-UTWC ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a033s00000vSQo4AAG/p 5/5