Loading...
HomeMy WebLinkAboutFile Documents.334 McSkimming Rd.0073-2020-BRES334 McSkimming Asbuilt Markup Summary Page Index: 1 Date: 3/7/2024 8:56:54 AM File Name: 03-04-2024 Grading and Drainage As-Built Comments.pdf Checkmark: Unchecked Author: simonn Th approved plans show a volume of 337CF for the south bioretention area. Please verify the volume of BP-2 & show capacity meets minimum detention requirements. 03-04-2024 Grading and Drainage As-Built Comments.pdf (13) Page Index: 1 Date: 3/7/2024 8:52:57 AM File Name: 03-04-2024 Grading and Drainage As-Built Comments.pdf Checkmark: Unchecked Author: simonn Please verify and call out that riprap is in place at both bioretention ponds. Page Index: 1 Date: 3/7/2024 8:56:58 AM File Name: 03-04-2024 Grading and Drainage As-Built Comments.pdf Checkmark: Unchecked Author: simonn The sewer service is very close to BP-2 and in a significantly different area from the approved civil plans. Please verify distances from BP-2. Was it installed with 4" insulation? Verify no issues with stormwater infiltration above the sanitary service. Page Index: 1 Date: 3/7/2024 8:49:43 AM File Name: 03-04-2024 Grading and Drainage As-Built Comments.pdf Checkmark: Unchecked Author: simonn Please verify that riprap was put in place Page Index: 1 Date: 3/7/2024 8:56:38 AM File Name: 03-04-2024 Grading and Drainage As-Built Comments.pdf Checkmark: Unchecked Author: simonn The civil plans show a drain pan on the north side of the driveway. Verify and show that the drain pan was installed, or provide analysis and demonstrate that all drainage is routed in the same manner as originally proposed. 11 7 Th approved plans show a volume of 337CF for the south bioretention area. Please verify the volume of BP-2 & show capacity meets minimum detention requirements. 7.5' EAS 12 0 16 7 19 81 2 1 81 2 2 81 2 3 81 8119 T) 40 Please verify and call out that riprap is in place at both bioretention ponds. SS S S SS SS SS SS 10' BUILDING SETBACK 7.5' UTILITY EASEMENT 81 1 7 81 1 8 81 1 9 8 1 1 5 8 1 1 5 The sewer service is very close to BP-2 and in a significantly different area from the approved civil plans. Please verify distances from BP-2. Was it installed with 4" insulation? Verify no issues with stormwater infiltration above the sanitary service. SS S S SS SS SS 7.5' UTILITY EASEMENT 81 2 0 81 1 7 81 1 8 81 1 9 1 8 1 1 5 8 1 1 5 81 CO Please verify that riprap was put in place WSOUE U E U E W W W W W W G G G G G G 2 4 . 5 NG K 81 3 5 81 3 6 8 1 3 2 8 1 3 3 81 3 4 81 2 7 81 2 8 81 3 2 81 3 3 813 4 N 18, TOWNSHIP 10 SOUTH, RANGE 84 WEST OF THE 6TH Y OF ASPEN, COUNTY OF PITKIN, STATE OF COLORADO The civil plans show a drain pan on the north side of the driveway. Verify and show that the drain pan was installed, or provide analysis and demonstrate that all drainage is routed in the same manner as originally proposed. Page Index: 1 Date: 3/7/2024 8:56:48 AM File Name: 03-04-2024 Grading and Drainage As-Built Comments.pdf Checkmark: Unchecked Author: simonn The approved civil plans locate the bioretention pond weirs outside of the utility easement. Easements should remain clear for all future utility corridor needs. Please address. Page Index: 1 Date: 3/7/2024 8:57:23 AM File Name: 03-04-2024 Grading and Drainage As-Built Comments.pdf Checkmark: Unchecked Author: sarahso Per asbuilt survey checklist please provide lot corner elevations Page Index: 1 Date: 3/7/2024 8:57:19 AM File Name: 03-04-2024 Grading and Drainage As-Built Comments.pdf Checkmark: Unchecked Author: sarahso Show basis of bearing tied to two COA monuments and point of beginning graphically Page Index: 1 Date: 3/7/2024 8:57:23 AM File Name: 03-04-2024 Grading and Drainage As-Built Comments.pdf Checkmark: Unchecked Author: sarahso Provide BMP Operations & Maintenance agreement signed by homeowner Page Index: 1 Date: 3/7/2024 8:49:33 AM File Name: 03-04-2024 Grading and Drainage As-Built Comments.pdf Checkmark: Unchecked Author: sarahso The approved civil plans show downspouts directly connected to the storm pipe. On the asbuilt show all downspout connections. SS SS SS S S S S 11.1' 8 1 1 5 The approved civil plans locate the bioretention pond weirs outside of the utility easement. Easements should remain clear for all future utility corridor needs. Please address. Per asbuilt survey checklist please provide lot corner elevations Show basis of bearing tied to two COA monuments and point of beginning graphically Provide BMP Operations & Maintenance agreement signed by homeowner E SCO WSO E SS SS UE UE U E U E U E UE U E U E U E U E W W W W W W G G G G G G G SS SS SS SS SS S S G IVB IVB IVB 12.9 58 . 4 2 7 . 8 9.0 2. 9 13.5 1 9 . 5 17.4 1.2 5.8 1.2 3.1 1 9 . 4 22.3 5 . 1 35.8 2 4 . 5 11.1' 30.5' 8 1 2 5 81 3 0 81 2 6 81 2 7 81 2 8 81 2 9 81 1 5 81 1 5 81 1 6 81 2 0 812 5 81 1 6 81 1 7 81 1 8 81 1 9 81 2 1 81 2 2 812 3 812 4 81 3 5 81 3 6 8116 CO CO CO CO CO 81 3 2 81 3 3 81 3 4 8130 8131 8132 8133 8130 8128 8129 8131 30' BUIL D I N G SETBAC K 81 1 6 The approved civil plans show downspouts directly connected to the storm pipe. On the asbuilt show all downspout connections. Page Index: 1 Date: 3/7/2024 8:49:26 AM File Name: 03-04-2024 Grading and Drainage As-Built Comments.pdf Checkmark: Unchecked Author: sarahso Call out snow melt system in the ROW. A permanent revocable encroachment license is required. Information on submitting an encroachment license can be found here: https://www.aspen.gov/1405/Per manent-Revocable-Encroachme nt-License Page Index: 1 Date: 3/7/2024 8:49:36 AM File Name: 03-04-2024 Grading and Drainage As-Built Comments.pdf Checkmark: Unchecked Author: sarahso The plans call out an 8" pipe in this location. In the form of a memo from the civil engineer please verify and show that a 6" pipe has adequate capacity. Page Index: 1 Date: 3/7/2024 8:51:00 AM File Name: 03-04-2024 Grading and Drainage As-Built Comments.pdf Checkmark: Unchecked Author: sarahso Civil plans had 6" HDPE here to connect to the downspout on the south side of the garage. Was this pipe and downspout connection installed? W G G 81 3 5 81 3 6 Call out snow melt system in the ROW. A permanent revocable encroachment license is required. Information on submitting an encroachment license can be found here: https://www.aspen.gov/1405/Permane nt-Revocable-Encroachment-License UE UE G G IVB 7.5' UTILITY EASEMENT 5' BUILDING SETBACK 12 0 812 5 16 9 81 2 1 81 2 2 81 2 3 812 4 CO CO 8120 811 9 8121 8122 8123 FINAL GRAD 334 MCSKIM MORE PARTICULARLY DES SECTION 18, TOWN CITY OF ASPE The plans call out an 8" pipe in this location. In the form of a memo from the civil engineer please verify and show that a 6" pipe has adequate capacity. E WSO UE UE U E U E U E U E U E W W W W W W G G G G G G GG IVB IVB 12.9 35.8 2 4 . 5 30.5' 8 1 3 0 812 5 812 4 81 3 5 81 3 6 CO CO 8 1 3 2 8 1 3 3 81 3 4 8130 8131 8132 8133 8130 8128 8129 8131 8 81 2 8 81 3 2 81 3 3 813 4 8122 8123 30' BUI L D I N G SETBAC K Civil plans had 6" HDPE here to connect to the downspout on the south side of the garage. Was this pipe and downspout connection installed?