Loading...
HomeMy WebLinkAboutFile Documents.1265 Mountain View Dr.0069-2020-BCHO 314 sopris circle, basalt, colorado 970-306-6300 office Site drainage excavation and footprint for addition to home: NEW FOOTPRINT AND EXCAVATION: THE PROPOSED MASTER/LOWER BEDROOM ADDITION AND LIVING AREA BUMP-OUT HAVE A FOOTPRINT OF APPROXIMATELY 265 FT2. THE AREA WHERE THE ADDITION WILL GO AT THE MASTER IS A SPLIT LEVEL. AS A RESULT, THE FOUNDATION WILL BE A FROST DEPTH (42”) AS IT EXISTS AT PRESENT. THERE WILL BE NO NEED FOR SHORING AS THE DEPTH IS MINIMUM, AND THE AMOUNT OF EXCAVATION WILL BE MINIMUM AS WELL. NOTE REGARDING DRAINAGE: ALL ONSITE DRAINAGE AT BOTH THE HOUSE AND THE EXISTING HARD- SCAPE WILL REMAIN THE SAME. THE NEW ROOF AREAS WILL BE OVER FRAMED ON TO AND INTEGRATED WITH THE EXISTING ROOF STRUCTURE. EXISTING DOWNSPOUT LOCATIONS WILL BE RETAINED. THE NEW BUMPOUT AREA AT THE MASTER WILL BE HANDLED WITH A NEW GUTTER TIED INTO THE EXISTING. ALL DRAINAGE WILL BE HANDLED ON SITE AS IT IS AT PRESENT. 09/24/2020 Reviewed by Engineering 10/29/2020 9:02:23 AM "It should be known that this review shall not relieve the applicant of their responsibility to comply with the requirements of the City of Aspen. The review and approval by the City is offered only to assist the applicant's understanding of the applicable Engineering requirements." The issuance of a permit based on construction documents and other data shall not prevent the City of Aspen from requiring the correction of errors in the construction documents and other data.