Loading...
HomeMy WebLinkAboutFile Documents.175 Paepcke Dr.0088-2020-BRES Boulder Carbondale Winter Park ASCENT GROUP, INC. • 6707 Winchester Circle, Suite 100 • Boulder, CO 80301 • 303.499.3022 • fax 303.499.3032 June 21, 2021 Will Hentschel 359 Design, LLC 3630 Osage St Denver, CO 80211 Reference: Ascent Job# 2019-0277: Burlingame Ranch Modulars Phase 3 Dear Mr. Hentschel, At the request of the City of Aspen and Shaw Construction, the following narrative documents the revisions to the structural sets for buildings 8-11 between the Permit Submittal and the latest sets issued for each building: Building 8: 4/5/21 Construction Set: • S0.2 – Addition of 2-Pour Foundation Wall Detail. • S0.3 – Addition of King Post Detail. • S1.1 & S1.2 – Revisions to foundation wall steps & wall locations per Architectural revisions. Addition of crawlspace access opening. Addition of Site Elevation Reference. • S1.2 – Addition of footings for support of modular at staircase above. • S2.1 & S2.2 – Addition of language for crawlspace access through crawlspace stud walls. • S2.2 – Addition of 2x6 stud walls for support of modular at staircase above. • S3.1 - S5.2 – Addition of Architectural gridlines and dimension references to columns. Movement of columns & beams per Architectural Revisions and associated revisions of structural member sizes as required. 5/4/21 ASI-1-08: • S1.1 & S2.1 – Addition of dimensions from Architectural gridlines to foundation corners. Addition of modular holdown specifications & dimensioned locations. • S2.1 & S2.2 – Addition of framing information for water entry room floors. • S4.1 - S5.2 – Addition of Architectural beams and associated keynote. 6/1/21 ASI-2-08: • S1.1 – Revision of foundation wall height at water entry room. • S1.2 – Revision of foundation wall heights at water entry room and gridline s B-3 & B-H corner. Building 9: 4/9/21 Construction Set: • S0.2 – Addition of 2-Pour Foundation Wall Detail. • S0.3 – Addition of King Post Detail. • S1.1 & S1.2 – Revisions to foundation wall steps & wall locations per Architectural revisions. Addition of crawlspace access opening. Addition of Site Elevation Reference. • S1.2 – Addition of footings for support of modular at staircase above. • S2.1 & S2.2 – Addition of language for crawlspace access through crawlspace stud walls. • S2.2 – Addition of 2x6 stud walls for support of modular at staircase above. • S3.1 - S5.2 – Addition of Architectural gridlines and dimension references to columns. Movement of columns & beams per Architectural Revisions and associated revisions of structural member sizes as required. Mr. Will Hentschel Page 2 of 3 ASCENT GROUP, INC. • 6707 Winchester Circle, Suite 100 • Boulder, CO 80301 • 303.499.3022 • fax 303.499.3032 5/4/21 ASI-1-09: • S1.1 & S2.1 – Addition of dimensions from Architectural gridlines to foundation corners. Addition of modular holdown specifications & dimensioned locations. • S2.1 & S2.2 – Addition of framing information for water entry room floors. • S4.1 - S5.2 – Addition of Architectural beams and associated keynote. 5/13/21 Counterfort Revision: • S1.1– Movement of counterfort along gridline A-B to avoid interference. 6/11/21 ASI-2-09: • S0.2 – Revision of Counterfort Detail for passage of drainage piping. • S0.3 – Addition of Concrete Window Well Detail. • S1.1 – Revision of foundation wall heights along gridline A-B. • S1.2 – Revision of foundation wall heights along gridlines B-H. Building 10: 5/20/21 Foundation Construction: • S1.1– Revisions to foundation wall locations per Architectural revisions. 6/11/21 Construction Set: • S0.3 – Addition of King Post Detail. • S1.1 – S4.2 – Addition of north arrow. • S1.1 & S1.2 – Revisions to foundation wall steps & wall locations per Architectural revisions. Revision of footing sizes & addition of enlarged footing pads per modular loading plans. Addition of crawlspace access opening. Addition of Site Elevation Reference. Addition of modular holdown specifications & dimensioned locations. Addition of dimensions from Architectural gridlines to foundation corners. Addition of enlarged footing pads for skewed column locations. • S2.1 & S2.2 - Addition of language for crawlspace access through crawlspace stud walls. • S2.2 – Addition of framing information for water entry room floor. • S3.1 & S3.2 – Addition of stair stringer specifications. • S3.1 – S4.2 – Addition of Architectural gridlines and dimension references to columns. Movement of columns & beams per Architectural Revisions and associated revisions of structural member sizes as required. Addition of Architectural beams and associated keynote. Building 11: 6/11/21 Construction Set: • S0.3 – Addition of King Post Detail. • S1.1 – S4.2 – Addition of north arrow. • S1.1 & S1.2 – Revisions to foundation wall steps & wall locations per Architectural revisions. Revision of footing sizes & addition of enlarged footing pads per modular loading plans. Addition of crawlspace access opening. Addition of Site Elevation Reference. Addition of modular holdown specifications & dimensioned locations. Addition of dimensions from Architectural gridlines to foundation corners. Addition of enlarged footing pads for skewed column locations. • S2.1 & S2.2 - Addition of language for crawlspace access through crawlspace stud walls. • S2.2 – Addition of framing information for water entry room floor. • S3.1 & S3.2 – Addition of stair stringer specifications. • S3.1 – S4.2 – Addition of Architectural gridlines and dimension references to columns. Movement of columns & beams per Architectural Revisions and associated revisions of structural member sizes as required. Addition of Architectural beams and associated keynote. Mr. Will Hentschel Page 3 of 3 ASCENT GROUP, INC. • 6707 Winchester Circle, Suite 100 • Boulder, CO 80301 • 303.499.3022 • fax 303.499.3032 It is a pleasure to work with you on this project and we look forward to its successful completion. Please feel free to contact our office if you have any questions or if we may be of any further assistance regardi ng these matters. Sincerely, Jared Veenstra, PE Principal 06/21/2021