Loading...
HomeMy WebLinkAboutFile Documents.1265 Mountain View Dr.0033-2020-BRES (5)0033-2020-BRES_BuildingComments_1 File Name: Kolbe Window Performane Data.pdf Author: bonniem Page Label: 1 Page Index: 1 Capture: No Measurement: 1 Count Depth: Wall Area: Unit: Count Length: Document Height: 5.3972 in Document Width: 3.4293 in Y: 0.3845 in X: 5.1810 in Creation Date: 7/17/2020 5:42:34 PM Date: 7/17/2020 5:53:39 PM Checkmark: Unchecked Lock: Unlocked Color: Subject: PlanCheck Status: Width: Height: Area: Volume: Several of the Kolbe windows listed exceed the maximum .28 U-factor per 2015 IECC Table R402.1.2 as amended by Ordinance 40, 2016. Provide an area-weighted average per R402.3.1 or REScheck with UA tradeoff per R402.1.5, or revise windows as needed. Verify that all windows and doors will have NFRC labels on them stating U-factor or provide alternate documentation per our Fenestration U-factor Documentation policy: https://www.cityofaspen.com/Do cumentCenter/View/6199/Fenest ration-U-Factor-Policy-Revision- PlanCheck (3) File Name: WMR_ Revised Plan Submittal 3-28-20.pdf Author: bonniem Page Label: A3.05 NORTH AND WEST SIDE ELEVATIONS Page Index: 16 Capture: No Measurement: 1 Count Depth: Wall Area: Unit: Count Length: Document Height: 9.8678 in Document Width: 8.8591 in Y: 2.2760 in X: 5.8683 in Creation Date: 7/17/2020 6:06:12 PM Date: 7/17/2020 6:07:29 PM Checkmark: Unchecked Lock: Unlocked Color: Subject: PlanCheck Status: Width: Height: Area: Volume: Amend the North Elevation and Roof Plan to show required snow stops where roof sheds onto driveway. (Ordinance 40, 2016) Several of the Kolbe windows listed exceed the maximum .28 U-factor per 2015 IECC Table R402.1.2 as amended by Ordinance 40, 2016. Provide an area-weighted average per R402.3.1 or REScheck with UA tradeoff per R402.1.5, or revise windows as needed. Verify that all windows and doors will have NFRC labels on them stating U-factor or provide alternate documentation per our Fenestration U-factor Documentation policy: https://www.cityofaspe n.com/DocumentCent er/View/6199/Fenestra tion-U-Factor-Policy-R evision- T.O. SLAB @ GARAGEEL.= 98'-6" VERIFY T.O. SLAB @ LOWER EL.= 95'-6" STANDING SEAM METAL ROOFING OVER VERSASHIELD ROOF DECK PROTECTION OVER GRACE ICE AND WATER SHIELD ON 5/8" PLYWD. OVER FRAMING PER STRUCTURAL W/ R-49 CLOSED CELL SPRAY FOAM INSULATION AND 5/8" TYPE"X" GYP.BD. GARAGE DOOR ALUMINUM AND GLASS DOOR VERTICAL SIDING INFILL AT TRUSS 41 16 17 1819 10 ' - 0 " 1 A4.1 1 A4.1 WALL CONSTRUCTION DRY STACK THIN STONE ON TYVEK ON EXISTING PLYWD. OVER 2 X 6'SW/ R-28 INSULATION AND 5/8" TYPE "X" GYP. BD. Amend the North Elevation and Roof Plan to show required snow stops where roof sheds onto driveway. (Ordinance 40, 2016) 07/24/2020 File Name: WMR_ Revised Plan Submittal 3-28-20.pdf Author: bonniem Page Label: A3.05 NORTH AND WEST SIDE ELEVATIONS Page Index: 16 Capture: No Measurement: 1 Count Depth: Wall Area: Unit: Count Length: Document Height: 7.2355 in Document Width: 4.4308 in Y: 8.3236 in X: 3.7217 in Creation Date: 7/17/2020 6:07:59 PM Date: 7/20/2020 3:23:45 PM Checkmark: Unchecked Lock: Unlocked Color: Subject: PlanCheck Status: Width: Height: Area: Volume: Clarify whether the stone veneer is less than 4". If less than 4" provide a spec sheet with installation instructions. If greater than 4", provide an exterior wall details showing the supports and weeps required per R703.8 File Name: WMR_ Revised Plan Submittal 3-28-20.pdf Author: bonniem Page Label: A5.01 WINDOW AND DOOR SCHEDULES Page Index: 19 Capture: No Measurement: 1 Count Depth: Wall Area: Unit: Count Length: Document Height: 1.1597 in Document Width: 1.5982 in Y: 0.6095 in X: 4.7796 in Creation Date: 7/20/2020 4:06:25 PM Date: 7/20/2020 4:06:25 PM Checkmark: Unchecked Lock: Unlocked Color: Subject: R308.4 Safety Glazing windows Status: Width: Height: Area: Volume: On the plans or window schedule, label each individual window that must be safety glazed (R308.4). R308.4 Safety Glazing windows (1) T.O. SLAB @ GARAGE EL.= 98'-6" VERIFY T.O. SLAB @ LOWER EL.= 95'-6" GARAGE DOOR ALUMINUM AND GLASS DOOR 1 A4.1 WALL CONSTRUCTION DRY STACK THIN STONE ON TYVEK ON EXISTING PLYWD. OVER 2 X 6'S W/ R-28 INSULATION AND 5/8" TYPE "X" GYP. BD. Clarify whether the stone veneer is less than 4". If less than 4" provide a spec sheet with installation instructions. If greater than 4", provide an exterior wall details showing the supports and weeps required per R703.8 On the plans or window schedule, label each individual window that must be safety glazed (R308.4). 07/24/2020 File Name: WMR_ Revised Plan Submittal 3-28-20.pdf Author: bonniem Page Label: JL OCDU (N U S)ZIIU2ftt<o Page Index: 23 Capture: No Measurement: 1 Count Depth: Wall Area: Unit: Count Length: Document Height: 1.3514 in Document Width: 3.9254 in Y: 22.1819 in X: 2.5280 in Creation Date: 7/20/2020 4:08:15 PM Date: 7/20/2020 4:11:08 PM Checkmark: Unchecked Lock: Unlocked Color: Subject: Special Inspection Program Status: Width: Height: Area: Volume: Additional information is required on the special inspection section on S3.1. Specify which items require periodic vs continuous inspection in accordance with 2015 IBC 1705. Provide a special inspection agreement signed by all required parties. https://www.cityofaspen.com/Do cumentCenter/View/5044/Specia l-Inspection-Agreement-v2?bidId = Special Inspection Program (1) Additional information is required on the special inspection section on S3.1. Specify which items require periodic vs continuous inspection in accordance with 2015 IBC 1705. Provide a special inspection agreement signed by all required parties. https://www.cityofaspen.com/DocumentCenter/View/ 5044/Special-Inspection-Agreement-v2?bidId= 07/24/2020 1 jeffrey@hancoxgroup.com From:jeffrey@hancoxgroup.com Sent:Thursday, July 23, 2020 2:09 PM To:Bonnie Muhigirwa Cc:dennis.murrray@cityofaspen.com; lauren.litchet@cityofaspen.com Subject:RE: Building Comments - 0033-2020-BRES - 1265 MTN VIEW DR Attachments:0033-2020-BRES_BuildingComments_1.pdf Hi Bonnie:    In response to your email seeking updates and revisions here is the following information:    1.) Window and doors.  I have uploaded the cutsheets from the Kolbe supplier that we will be using. I went ahead  and highlighted all of the U‐values in red for easy identification.  2.) Required snow stops. I have updated sheet A2.07 Roof Plan and sheet A3.05 North and West Side Elevations to  show the required snow and ice stops. Revised Set uploaded  3.) Exterior Stone detailing: I have updated sheet A3.05 North and West Side to state that the stone is 2” thick.  I  have uploaded the Eldorado Stone Companies installation guidelines. Revised set uploaded  4.) Special Inspection: I am on this and getting the required signatures.  I will upload when complete and email  everyone when it is done. Pending    Thanks!    Jeffrey R. Hancox  Architect, NCARB    Willits  314 Sopris Circle  Basalt, CO 81621  970‐306‐6300 Office  970‐618‐5588 Mobile    ‐‐‐‐‐Original Message‐‐‐‐‐  From: Bonnie Muhigirwa <bonnie.muhigirwa@services.cityofaspen.com>   Sent: Monday, July 20, 2020 6:40 PM  To: jeffrey@hancoxgroup.com  Cc: dennis.murrray@cityofaspen.com; lauren.litchet@cityofaspen.com  Subject: Building Comments ‐ 0033‐2020‐BRES ‐ 1265 MTN VIEW DR    Hello JEFFREY ROBERT HANCOX,    I’ve reviewed your permit application; please see the attached comment list. Please contact me directly if you have any  questions on the comments. You may resubmit your responses online when you have received comments or approval  from all applicable review agencies.  Please be sure to reach out to your permit coordinator to ensure you've received all  applicable comments prior to uploading responses.  Once you have uploaded you comments online, please email your  permit coordinator directly to notify them as they will not receive an automated email from our system.    Address: 1265 MTN VIEW DR  Permit Number: 0033‐2020‐BRES  07/24/2020 2 Permit Coordinator: Lauren Litchet    These design documents have been reviewed for conformance to the International Codes as adopted and amended by  the City of Aspen.  State and Federal regulations are administered where applicable. You can find a copy of all adopted  codes, ordinances, and policies on our website.    The attached corrections are required to be addressed. Revise and redraw the plans to clearly respond to the attached  comments and resubmit this comment letter with your written response to each comment on this list. Indicate which  detail or specification page shows the required information. Responses such as “will comply with code” are not  adequate. Revised drawings must clearly show code compliance.    Building plan check is only one part of the often complex process by which projects are reviewed for approval. These  parts are interrelated and are sometimes conflicting. It is ultimately the applicant’s responsibility to coordinate these  requirements.    Bonnie Muhigirwa  Plans Examiner  Community Development     130 S Galena St.  Aspen, CO 81611    p 970.429.2787  c 970.309.5119    Notice and Disclaimer:  This message is intended only for the individual or entity to which it is addressed and may contain information that is  confidential and exempt from disclosure pursuant to applicable law.  If you are not the intended recipient, please reply  to the sender that you have received the message in error and then delete it.  Further, the information or opinions  contained in this email are advisory in nature only and are not binding on the City of Aspen.  If applicable, the  information and opinions contained in the email are based on current zoning and/or applicable building code regulations  which are subject to change in the future, and upon factual representations that may or may not be accurate.  The  opinions and information contained herein do not create a legal or vested right or any claim of detrimental reliance.  07/24/2020