Page: 4
File Name: 50.CMP_REV1.20210408.pdf Please provide a signed copy of
the agreement to layback on the
neighboring property.
50.CMP_REV1.20210408.pdf (1)
Page: [1] C100 SITE & UTILITY PLAN
File Name: 90.CIVIL PLANS.20210226.pdf On sheet A01 the driveway is
called out as snowmelted.
Include a call out that snowmelt
within the ROW will be placed on
a separate zone.
Prior to the project receiving a
certificate of occupancy the
property will need to submit for
and obtain a permanent
revocable encroachment license
for all snowmelt in the ROW.
90.CIVIL PLANS.20210226.pdf (3)
Page: [1] C100 SITE & UTILITY PLAN
File Name: 90.CIVIL PLANS.20210226.pdf Provide fire flow calcs or a fire
flow memo that verifies a 2" line
is needed for fire supression. If
a smaller line provides adequate
flow than a 2" line is not
permitted.
Page: [1] C100 SITE & UTILITY PLAN
File Name: 90.CIVIL PLANS.20210226.pdf Extend the asphalt patch to
include the necessary
excavation area to abandon the
existing water service line to the
north.
Sound Mitigation
Fencing will be
Constructed using
Reinforced Vinyl
sound blankets
hung on wood
frame panels.
Excavation to be
layed back onto
neighboring
property, See
Easement
Agreement.
Please provide a signed copy of
the agreement to layback on
the neighboring property.
c
S
K
I
M
M
I
N
G
R
D
.
6
0
'
R
.
O
.
W
.
On sheet A01 the driveway is
called out as snowmelted.
Include a call out that snowmelt
within the ROW will be placed
on a separate zone.
Prior to the project receiving a
certificate of occupancy the
property will need to submit for
and obtain a permanent
revocable encroachment
license for all snowmelt in the
ROW.
Provide fire flow calcs or a fire
flow memo that verifies a 2" line
is needed for fire supression. If
a smaller line provides
adequate flow than a 2" line is
not permitted.
M
c
S
K
I
M
M
6
0
'
R
.
O
.
Extend the asphalt patch to
include the necessary
excavation area to abandon the
existing water service line to the
north.
Contractor to address
Callout for snowmelt within ROW to be on a
separate zone has been added.
A memo for the water service diameter for fire flow
has been provided by the contractor.
Asphalt patch has been extended to cover
excavation area for existing water service line
abandonment.
07/23/2021