Loading...
HomeMy WebLinkAboutFile Documents.334 McSkimming Rd.0073-2020-BRES (28)Engineering2 - 334 McSkimmin - Page: 4 File Name: 50.CMP_REV1.20210408.pdf Please provide a signed copy of the agreement to layback on the neighboring property. 50.CMP_REV1.20210408.pdf (1) Page: [1] C100 SITE & UTILITY PLAN File Name: 90.CIVIL PLANS.20210226.pdf On sheet A01 the driveway is called out as snowmelted. Include a call out that snowmelt within the ROW will be placed on a separate zone. Prior to the project receiving a certificate of occupancy the property will need to submit for and obtain a permanent revocable encroachment license for all snowmelt in the ROW. 90.CIVIL PLANS.20210226.pdf (3) Page: [1] C100 SITE & UTILITY PLAN File Name: 90.CIVIL PLANS.20210226.pdf Provide fire flow calcs or a fire flow memo that verifies a 2" line is needed for fire supression. If a smaller line provides adequate flow than a 2" line is not permitted. Page: [1] C100 SITE & UTILITY PLAN File Name: 90.CIVIL PLANS.20210226.pdf Extend the asphalt patch to include the necessary excavation area to abandon the existing water service line to the north. Sound Mitigation Fencing will be Constructed using Reinforced Vinyl sound blankets hung on wood frame panels. Excavation to be layed back onto neighboring property, See Easement Agreement. Please provide a signed copy of the agreement to layback on the neighboring property. c S K I M M I N G R D . 6 0 ' R . O . W . On sheet A01 the driveway is called out as snowmelted. Include a call out that snowmelt within the ROW will be placed on a separate zone. Prior to the project receiving a certificate of occupancy the property will need to submit for and obtain a permanent revocable encroachment license for all snowmelt in the ROW. Provide fire flow calcs or a fire flow memo that verifies a 2" line is needed for fire supression. If a smaller line provides adequate flow than a 2" line is not permitted. M c S K I M M 6 0 ' R . O . Extend the asphalt patch to include the necessary excavation area to abandon the existing water service line to the north. Contractor to address Callout for snowmelt within ROW to be on a separate zone has been added. A memo for the water service diameter for fire flow has been provided by the contractor. Asphalt patch has been extended to cover excavation area for existing water service line abandonment. 07/23/2021