Loading...
HomeMy WebLinkAboutFile Documents.1005 Cemetery Ln.0038-2024-BROF (15)SMOKE ALARMS AND CARBON MONOXIDE DETECTORS REQUIRED THROUGHOUT DWELLING UNIT PER CITY OF ASPEN MUNICIPAL CODE 8.15 These plans must be kept at the building site or inspection delays may occur. Construction shall conform to these plans. All changes shall be approved by the building official. Field Plan Set Must Be Printed In Color SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, MECHANICAL, OR FIRE SPRINKLER WORK It should be known that this review shall not relieve the applicant of their responsibility to comply with the requirements of the City of Aspen Municipal Code. Pursuant to Sec.26.104.050, any permit or approval issued in error or otherwise not in conformity with the requirements of this Title, shall be void. Similarly, any permit or approval issued in reliance upon or as a result of, a materially false statement or representation made in the process of obtaining the permit or development approval shall, likewise, be void. Any person having received a void or voidable permit or approval shall not be relieved from having to comply with all applicable terms and conditions of this Title and the City shall not be estopped from fully enforcing same.Mid-Roof Inspection REQUIRED After your roof permit is issued, and you have started work, you must request a mid-roof inspection. Inspectors will verify your Class A assembly on site. You will request inspection directly on SalesForce. Final Roof Inspection REQUIRED Once roof work is complete, you must request a final roof inspection. Inspectors will inspect snow guards and heat tape (if applicable). NOTE: If there is heat tape present, a final roof inspection cannot be requested until the sub-electrical permit is applied for as both final inspections will occur simultaneously. MID-ROOF AND FINAL ROOF INSPECTIONS REQUIRED TO RECEIVE A LETTER OF COMPLETENESS HEAT TAPE MANDATORY CONTROL REQ’S. All heat tape systems shall meet the following per (Ordinance 1 Series 2023): -Automatic controls configured for system shut off when air temperature is above 40°F and comply with one of the following: -shut off in absence of moisture -shut off at night (daylight sensor or timer) Snow stops required at all locations where roofs could shed snow onto walkways, stairs, alleys, decks, exits, utilities and meters, emergency escape and rescue opening window wells, or adjacent properties - Ordinance 1, 2023. 06/13/2024 SUB-ELECTRICAL PERMIT REQUIRED FOR HEAT TAPE A sub-electrical permit is required if a heat tape system is present, no matter the total wattage. A licensed electrician must apply for the permit. The sub-electrical permit must be applied for prior to the final roof inspection as both final inspections will occur simultaneously. NOTE: You many not substitute roofing components/products that stray from the approved and issued ESR/QAI report without Building department approval. Class A assemblies are tested and listed with the specific roof products called out in the associated documentation. Installers shall follow all manufacturer's installation instructions for Class A roof assembly. DaVinci Shake 06/14/ 2 0 2 4 Sam I. There is to be no heat tape in scope of work for this project. If any heat tape is existing and not to be removed or replaced, or the scope changes and new heat tape is to be added, contact the building department prior to proceeding with that work. If anyexisting tape is to remain, it will be required to meet code for controls.