HomeMy WebLinkAboutFile Documents.961 Ute Ave.0063-2024-BROF (6)SMOKE ALARMS AND
CARBON MONOXIDE
DETECTORS REQUIRED
THROUGHOUT DWELLING
UNIT PER CITY OF ASPEN
MUNICIPAL CODE 8.15
These plans must be kept at the
building site or inspection
delays may occur. Construction
shall conform to these plans. All
changes shall be approved by
the building official.
Field Plan Set Must Be Printed In Color
SEPARATE PERMITS ARE
REQUIRED FOR ELECTRICAL,
PLUMBING, MECHANICAL, OR
FIRE SPRINKLER WORK
It should be known that this review shall
not relieve the applicant of their
responsibility to comply with the
requirements of the City of Aspen
Municipal Code. Pursuant to
Sec.26.104.050, any permit or approval
issued in error or otherwise not in
conformity with the requirements of this
Title, shall be void. Similarly, any permit
or approval issued in reliance upon or
as a result of, a materially false
statement or representation made in
the process of obtaining the permit or
development approval shall, likewise,
be void. Any person having received a
void or voidable permit or approval
shall not be relieved from having to
comply with all applicable terms and
conditions of this Title and the City shall
not be estopped from fully enforcing
same.
Work on heat tape is not permitted under this scope.
If any existing heat tape is touched or new heat tape
is proposed, it will be subject to REMP payment and
heat tape control requirements and will require a
sub-electrical permit.
Reach out to your permit reviewer with questions.
MID-ROOF AND FINAL
ROOF INSPECTIONS
REQUIRED TO RECEIVE A
LETTER OF
COMPLETENESS
Mid-Roof Inspection
REQUIRED
After your roof permit is issued,
and you have started work, you
must request a mid-roof
inspection.
Inspectors will verify your Class
A assembly on site.
You will request inspection
directly on SalesForce.
Final Roof Inspection
REQUIRED
Once roof work is complete, you
must request a final roof
inspection.
Inspectors will inspect snow
guards and heat tape (if
applicable).
NOTE: If there is heat tape
present, a final roof inspection
cannot be requested until the
sub-electrical permit is applied
for as both final inspections will
occur simultaneously.
NOTE: You many not substitute roofing components/products that stray
from the approved and issued ESR/QAI report without Building
department approval.
Class A assemblies are tested and listed with the specific roof products
called out in the associated documentation. Installers shall follow all
manufacturer's installation instructions for Class A roof assembly.
7/17/2024
7/17/2024
Flat roof - no heat tape or
snow guards
ESR-1463 | Most Widely Accepted and Trusted Page 7 of 14
TABLE 1—PRODUCT NAMES (continued)
CARLISLE
PRODUCT NAME
MULE-HIDE PRODUCT
NAME
VERSICO PRODUCT
NAME
WEATHERBOND
PRODUCT NAME
ROOFING PRODUCTS
INTERNATIONAL
PRODUCT NAME
Cold Applied Adhesive Cold Applied Adhesive Cold Applied Adhesive Cold Applied Adhesive RPI Cold Applied
Adhesive
Flexible FAST Adhesive Helix® Max Low-Rise
Adhesive Flexible DASH Adhesive Flexible DASH Adhesive FastBond Flex Adhesive
OlyBond 500 Adhesive - OlyBond 500 Adhesive OlyBond 500 Adhesive OlyBond 500 Adhesive
TABLE 2—FIRE CLASSIFICATION ASSEMBLIES—ADHERED ROOFING SYSTEMS2,5
SYSTEM
NO.
ROOF
CLASS DECK MAX
SLOPE
BARRIER BOARD
OR SLIP SHEET INSULATION1 MEMBRANE
1
A Noncombustible
1/4:12
—
Any of the following
insulations, 1-inch min.
thickness: Carlisle
“SecurShield Polyiso”,
“InsulBase”, Hunter
Panels “H-Shield” or “H-
Shield-CG”
Sure-Weld, Spectro-Weld
2 1/2:12
Sure-Seal FR, Sure-Tough,
Sure-White, Sure-Seal FleeceBACK,
Sure-Weld HS, Sure-Weld SAT-TPO,
Sure-Weld FleeceBACK,
Spectro-Weld FleeceBACK,
Sure-White FleeceBACK
3 3/4:12
Sure-Flex PVC FleeceBACK,
Sure-Flex KEE HP FleeceBACK,
Sure-Flex PVC FRS FleeceBACK,
Sure-Flex KEE HP FRS FleeceBACK
4 1½ :12 Sure-Flex PVC, Sure-Flex PVC FRS,
Sure-Flex KEE HP
5
A Noncombustible
3/4:12
—
1/2-inch-thick fiberboard4,
1/2-inch-thick fiberboard4
or barrier board
(see Section 3.6) over
5-inch max Insulfoam
EPS3, 1/2-inch-thick
fiberboard or barrier board
(see Section 3.6) over
System No. 1 insulations
Sure-White FleeceBACK
6 1:12 Sure-Seal FR, Sure-Tough
7 11/2:12
Sure-White, Sure-Seal FleeceBACK,
Sure-Weld, Spectro-Weld, Sure-Weld
HS, Sure-Weld SAT-TPO,
Sure-Weld FleeceBACK,
Spectro-Weld FleeceBACK,
Sure-Flex PVC, Sure-Flex PVC FRS,
Sure-Flex KEE HP,
Sure-Flex PVC FleeceBACK,
Sure-Flex KEE HP FleeceBACK,
Sure-Flex PVC FRS FleeceBACK,
Sure-Flex KEE HP FRS FleeceBACK
8
A
Noncombustible
or Combustible
- min. 15/32-inch-
thick plywood or
min. 7/16-inch-
thick OSB.
3/4:12
1/4-inch thick
“DensDeck Prime”
or 1/4-inch thick
“SECUROCK
Gypsum Fiber Roof
Board”
—
Sure-White FleeceBACK
9 11/2:12 Sure-White, Sure-Seal FleeceBACK
10 3:12
Sure-Tough, Sure-Weld, Spectro-Weld,
Sure-Weld FleeceBACK,
Spectro-Weld FleeceBACK
11 4:12 Sure-Weld HS, Sure-Weld SAT-TPO
12 Unlimited Sure-Seal FR, Sure-Flex PVC,
Sure-Flex PVC FRS, Sure-Flex KEE HP
13 3:12
Sure-Flex PVC FleeceBACK,
Sure-Flex KEE HP FleeceBACK,
Sure-Flex PVC FRS FleeceBACK,
Sure-Flex KEE HP FRS FleeceBack
08/30/2024
linzhid
0063-2024-BROF
SLOANE RICHARD & CAROLYN
961 UTE AVE
273718295075
Tapered insulation
must have an R-value
of R-49 or better per
the City's adopted
code. R-49 above deck
or a combo of above
and below. If you
cannot meet this
requirement, please
provide a stamped
structural letter from a
licensed engineering
stating why the current
structure's integrity
cannot withstand
additional insulation
weight