Loading...
HomeMy WebLinkAboutFile Documents.681 Moore Dr.0040-2024-BROF (8)SMOKE ALARMS AND CARBON MONOXIDE DETECTORS REQUIRED THROUGHOUT DWELLING UNIT PER CITY OF ASPEN MUNICIPAL CODE 8.15 These plans must be kept at the building site or inspection delays may occur. Construction shall conform to these plans. All changes shall be approved by the building official. Field Plan Set Must Be Printed In Color SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, MECHANICAL, OR FIRE SPRINKLER WORK It should be known that this review shall not relieve the applicant of their responsibility to comply with the requirements of the City of Aspen Municipal Code. Pursuant to Sec.26.104.050, any permit or approval issued in error or otherwise not in conformity with the requirements of this Title, shall be void. Similarly, any permit or approval issued in reliance upon or as a result of, a materially false statement or representation made in the process of obtaining the permit or development approval shall, likewise, be void. Any person having received a void or voidable permit or approval shall not be relieved from having to comply with all applicable terms and conditions of this Title and the City shall not be estopped from fully enforcing same. ESR-2119 | Most Widely Accepted and Trusted Page 3 of 7 4.8 Reroofing: Prior to application of the shingles, the existing roof covering and underlayment must be completely removed. Any damaged sheathing must be replaced. The installation of the shingles must then proceed as described in Sections 4.1 through 4.5. An existing self-adhered ice barrier membrane may remain in place if covered with a new ice barrier membrane in accordance with the applicable code. The roof classification is as noted in Section 4.6 and Table 1. 5.0 CONDITIONS OF USE The DaVinci Slate, DaVinci Shake, Bellaforté Shake, and Bellaforté Slate roof shingles described in this report comply with, or are suitable alternatives to what is specified in, those codes listed in Section 1.0 of this report, subject to the following conditions: 5.1 Installation must comply with the applicable code, the manufacturer’s published installation instructions and this report. In the event of a conflict between this report and the manufacturer’s published installation instructions, this report governs. 5.2 The roof shingles are manufactured in Lenexa, Kansas, under a quality-control program with inspections by ICC-ES. 6.0 EVIDENCE SUBMITTED Data in accordance with the ICC-ES Acceptance Criteria for Special Roofing Systems (AC07), dated February 2014 (editorially revised May 2016). 7.0 IDENTIFICATION 7.1 Each roof shingle is labeled with the report holder’s name (DaVinci Roofscapes, LLC) and address, the product name, the shingle width, a production date code, and the ICC-ES evaluation report number (ESR-2119). 7.2 The report holder’s contact information is the following: DaVINCI ROOFSCAPES, LLC 13890 WEST 101ST STREET LENEXA, KANSAS 66215 (913) 599-0766 www.davinciroofscapes.com TABLE 1—FIRE CLASSIFICATIONS SYSTEM NO. ROOF CLASS ROOF DECK MIN. SLOPE UNDERLAYMENT1 DaVINCI ROOF SHINGLE Roof Shingle Exposure (in.) 1 A Min. 15/32- inch plywood 3:12 One layer ASTM D226 Type II (No. 30) or two layers of ASTM D Type I (No. 15) asphalt-saturated organic felt may be used; or One layer GAF Versashield® Fire-Resistant Roof Deck Protection (ESR-2053) DaVinci Slate 6 2 A Min. 15/32- inch plywood 3:12 One layer GAF Versashield® Fire-Resistant Roof Deck Protection (ESR-2053) DaVinci Slate DaVinci Shake 6 to 71/2 9 to 10 3 A Min. 15/32- inch plywood 3:12 One layer ASTM D226 Type II (No. 30) asphalt- saturated organic felt plus one layer of ASTM D3909 mineral-surfaced cap sheet DaVinci Slate DaVinci Shake Bellaforté Shake 6 to 8 9 to 10 12 4 A Min. 15/32- inch plywood 3:12 Two layers ASTM D226 Type II (No. 30) asphalt- coated glass-fiber-mat DaVinci Slate DaVinci Shake Bellaforté Shake Bellaforté Slate 6 to 8 9 to 10 12 12 5 A Min. 15/32- inch plywood 3:12 One layer Eco Chief Products SolarHide™-SRW (ESR-4035) DaVinci Slate DaVinci Shake Bellaforté Shake Bellaforté Slate 6 to 8 9 to 10 12 12 For SI: 1-inch =25.4 mm; 1ft = 0.305m 1 ASTM D226 Type I (No. 15) and Type II (No. 30) underlayment must be installed in accordance with the applicable building code. GAF Versashield® Fire-Resistant Roof Deck Protection underlayment must be installed in accordance with ESR-2053. Eco Chief Products SolarHide™-SRW underlayment must be installed in accordance with ESR-4035. MID-ROOF AND FINAL ROOF INSPECTIONS REQUIRED TO RECEIVE A LETTER OF COMPLETENESS Mid-Roof Inspection REQUIRED After your roof permit is issued, and you have started work, you must request a mid-roof inspection. Inspectors will verify your Class A assembly on site. You will request inspection directly on SalesForce. Final Roof Inspection REQUIRED Once roof work is complete, you must request a final roof inspection. Inspectors will inspect snow guards and heat tape (if applicable). NOTE: If there is heat tape present, a final roof inspection cannot be requested until the sub-electrical permit is applied for as both final inspections will occur simultaneously. 06/14/2024 Snow stops required at all locations where roofs could shed snow onto walkways, stairs, alleys, decks, exits, utilities and meters, emergency escape and rescue opening window wells, or adjacent properties - Ordinance 1, 2023. NOTE: You many not substitute roofing components/products that stray from the approved and issued ESR/QAI report without Building department approval. Class A assemblies are tested and listed with the specific roof products called out in the associated documentation. Installers shall follow all manufacturer's installation instructions for Class A roof assembly. Work on heat tape is not permitted under this scope. If any existing heat tape is touched or new heat tape is purposed it will be exempt to REMP and heat tape control requirements and will require a sub-electrical permit. Reach out to your permit reviewer with questions. 0040-2024-BROF FIVE TREE LLC 681 MOORE DR 273514111115 Class A 07/05/2024 linzhid SMOKE ALARMS AND CARBON MONOXIDE DETECTORS REQUIRED THROUGHOUT DWELLING UNIT PER CITY OF ASPEN MUNICIPAL CODE 8.15 These plans must be kept at the building site or inspection delays may occur. Construction shall conform to these plans. All changes shall be approved by the building official. Field Plan Set Must Be Printed In Color SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, MECHANICAL, OR FIRE SPRINKLER WORK It should be known that this review shall not relieve the applicant of their responsibility to comply with the requirements of the City of Aspen Municipal Code. Pursuant to Sec.26.104.050, any permit or approval issued in error or otherwise not in conformity with the requirements of this Title, shall be void. Similarly, any permit or approval issued in reliance upon or as a result of, a materially false statement or representation made in the process of obtaining the permit or development approval shall, likewise, be void. Any person having received a void or voidable permit or approval shall not be relieved from having to comply with all applicable terms and conditions of this Title and the City shall not be estopped from fully enforcing same. Snow stops required at all locations where roofs could shed snow onto walkways, stairs, alleys, decks, exits, utilities and meters, emergency escape and rescue opening window wells, or adjacent properties - Ordinance 1, 2023. HEAT TAPE MANDATORY CONTROL REQ’S. All heat tape systems shall meet the following per (Ordinance 1 Series 2023): -Automatic controls configured for system shut off when air temperature is above 40°F and comply with one of the following: -shut off in absence of moisture -shut off at night (daylight sensor or timer) SUB-ELECTRICAL PERMIT REQUIRED FOR HEAT TAPE A sub-electrical permit is required if a heat tape system is present, no matter the total wattage. A licensed electrician must apply for the permit. The sub-electrical permit must be applied for prior to the final roof inspection as both final inspections will occur simultaneously. 5 watts x 170 linear feet of heat tape will be installed Within the 1000W exemption and exempt from REMP payment 11/08/2023 linzhid MID-ROOF AND FINAL ROOF INSPECTIONS REQUIRED TO RECEIVE A LETTER OF COMPLETENESS Add Building Coversheet from SalesForce here Add Roof plan showing roofing details + Heat tape Add company info sheet or ESR report showing Class A roof assembly Roof Assembly Asphalt shingles Ice and water shield Amenity Energy Use Approved (2021 CODE) RREMP CREMP PERMIT #:_______________DATE:________ HEAT TAPE TOTAL WATTAGE:_____________ WATTS/FT:_____________________________ TOTAL LINEAR FT:_______________________ OFFSET: _____________________________ *Note: - The first 1000W are exempt from REMP. - All roof permits will require a sub-electrical permit applied for by a licensed electrician. - A sub-electrical permit must be applied for prior to the final roof inspection as both final inspections will occur simultaneously. Mid-Roof Inspection REQUIRED After your roof permit is issued, and you have started work, you must request a mid-roof inspection. Inspectors will verify your Class A assembly on site. You will request inspection directly on SalesForce. Final Roof Inspection REQUIRED Once roof work is complete, you must request a final roof inspection. Inspectors will inspect snow guards and heat tape (if applicable). NOTE: If there is heat tape present, a final roof inspection cannot be requested until the sub-electrical permit is applied for as both final inspections will occur simultaneously. NOTE: You many not substitute roofing components/products that stray from the approved and issued ESR/QAI report without Building department approval. Class A assemblies are tested and listed with the specific roof products called out in the associated documentation. Installers shall follow all manufacturer's installation instructions for Class A roof assembly.