SMOKE ALARMS AND
CARBON MONOXIDE
DETECTORS REQUIRED
THROUGHOUT DWELLING
UNIT PER CITY OF ASPEN
MUNICIPAL CODE 8.15
These plans must be kept at the
building site or inspection
delays may occur. Construction
shall conform to these plans. All
changes shall be approved by
the building official.
Field Plan Set Must Be Printed In Color
SEPARATE PERMITS ARE
REQUIRED FOR ELECTRICAL,
PLUMBING, MECHANICAL, OR
FIRE SPRINKLER WORK
It should be known that this review shall
not relieve the applicant of their
responsibility to comply with the
requirements of the City of Aspen
Municipal Code. Pursuant to
Sec.26.104.050, any permit or approval
issued in error or otherwise not in
conformity with the requirements of this
Title, shall be void. Similarly, any permit
or approval issued in reliance upon or
as a result of, a materially false
statement or representation made in
the process of obtaining the permit or
development approval shall, likewise,
be void. Any person having received a
void or voidable permit or approval
shall not be relieved from having to
comply with all applicable terms and
conditions of this Title and the City shall
not be estopped from fully enforcing
same.
Snow stops required at all locations
where roofs could shed snow onto
walkways, stairs, alleys, decks, exits,
utilities and meters, emergency escape
and rescue opening window wells, or
adjacent properties - Ordinance 1,
2023.
Work on heat tape is not permitted under this scope.
Existing heat tape will remain untouched.
If any existing heat tape is touched or new heat tape
is proposed, it will be subject to REMP payment and
heat tape control requirements and will require a
sub-electrical permit.
Reach out to your permit reviewer with questions.
MID-ROOF AND FINAL
ROOF INSPECTIONS
REQUIRED TO RECEIVE A
LETTER OF
COMPLETENESS
Mid-Roof Inspection
REQUIRED
After your roof permit is issued,
and you have started work, you
must request a mid-roof
inspection.
Inspectors will verify your Class
A assembly on site.
You will request inspection
directly on SalesForce.
Final Roof Inspection
REQUIRED
Once roof work is complete, you
must request a final roof
inspection.
Inspectors will inspect snow
guards and heat tape (if
applicable).
NOTE: If there is heat tape
present, a final roof inspection
cannot be requested until the
sub-electrical permit is applied
for as both final inspections will
occur simultaneously.
NOTE: You many not substitute roofing components/products that stray
from the approved and issued ESR/QAI report without Building
department approval.
Class A assemblies are tested and listed with the specific roof products
called out in the associated documentation. Installers shall follow all
manufacturer's installation instructions for Class A roof assembly.
07
/
2
4
/
2
0
2
4
07/24/2024
ESR-2119 | Most Widely Accepted and Trusted Page 3 of 7
4.8 Reroofing:
Prior to application of the shingles, the existing roof
covering and underlayment must be completely removed.
Any damaged sheathing must be replaced. The installation
of the shingles must then proceed as described in
Sections 4.1 through 4.5. An existing self-adhered ice
barrier membrane may remain in place if covered with a
new ice barrier membrane in accordance with the
applicable code. The roof classification is as noted in
Section 4.6 and Table 1.
5.0 CONDITIONS OF USE
The DaVinci Slate, DaVinci Shake, Bellaforté Shake, and
Bellaforté Slate roof shingles described in this report
comply with, or are suitable alternatives to what is
specified in, those codes listed in Section 1.0 of this report,
subject to the following conditions:
5.1 Installation must comply with the applicable code, the
manufacturer’s published installation instructions and
this report. In the event of a conflict between this
report and the manufacturer’s published installation
instructions, this report governs.
5.2 The roof shingles are manufactured in Lenexa,
Kansas, under a quality-control program with
inspections by ICC-ES.
6.0 EVIDENCE SUBMITTED
Data in accordance with the ICC-ES Acceptance Criteria
for Special Roofing Systems (AC07), dated February 2014
(editorially revised May 2016).
7.0 IDENTIFICATION
7.1 Each roof shingle is labeled with the report holder’s
name (DaVinci Roofscapes, LLC) and address, the
product name, the shingle width, a production date
code, and the ICC-ES evaluation report number
(ESR-2119).
7.2 The report holder’s contact information is the
following:
DaVINCI ROOFSCAPES, LLC
13890 WEST 101ST STREET
LENEXA, KANSAS 66215
(913) 599-0766
www.davinciroofscapes.com
TABLE 1—FIRE CLASSIFICATIONS
SYSTEM
NO.
ROOF
CLASS
ROOF
DECK
MIN.
SLOPE UNDERLAYMENT1
DaVINCI ROOF SHINGLE
Roof Shingle Exposure (in.)
1 A Min. 15/32-
inch plywood 3:12
One layer ASTM D226 Type II (No. 30) or two layers
of ASTM D Type I (No. 15) asphalt-saturated organic
felt may be used; or
One layer GAF Versashield® Fire-Resistant Roof
Deck Protection (ESR-2053)
DaVinci Slate 6
2 A Min. 15/32-
inch plywood 3:12 One layer GAF Versashield® Fire-Resistant Roof
Deck Protection (ESR-2053)
DaVinci Slate
DaVinci Shake
6 to 71/2
9 to 10
3 A Min. 15/32-
inch plywood 3:12
One layer ASTM D226 Type II (No. 30) asphalt-
saturated organic felt plus one layer of ASTM D3909
mineral-surfaced cap sheet
DaVinci Slate
DaVinci Shake
Bellaforté Shake
6 to 8
9 to 10
12
4 A Min. 15/32-
inch plywood 3:12 Two layers ASTM D226 Type II (No. 30) asphalt-
coated glass-fiber-mat
DaVinci Slate
DaVinci Shake
Bellaforté Shake
Bellaforté Slate
6 to 8
9 to 10
12
12
5 A Min. 15/32-
inch plywood 3:12 One layer Eco Chief Products SolarHide™-SRW
(ESR-4035)
DaVinci Slate
DaVinci Shake
Bellaforté Shake
Bellaforté Slate
6 to 8
9 to 10
12
12
For SI: 1-inch =25.4 mm; 1ft = 0.305m
1 ASTM D226 Type I (No. 15) and Type II (No. 30) underlayment must be installed in accordance with the applicable building code. GAF
Versashield® Fire-Resistant Roof Deck Protection underlayment must be installed in accordance with ESR-2053. Eco Chief Products
SolarHide™-SRW underlayment must be installed in accordance with ESR-4035.
07/24/2024
linzhid
0046-2024-BROF
ASPEN HOME 2020 IRREV TRUST
1201 TIEHACK RD
273511309009