Loading...
HomeMy WebLinkAboutFile Documents.1201 Tiehack Rd.0046-2024-BROF (8)07 / 2 4 / 2 0 2 4 SMOKE ALARMS AND CARBON MONOXIDE DETECTORS REQUIRED THROUGHOUT DWELLING UNIT PER CITY OF ASPEN MUNICIPAL CODE 8.15 These plans must be kept at the building site or inspection delays may occur. Construction shall conform to these plans. All changes shall be approved by the building official. Field Plan Set Must Be Printed In Color SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, MECHANICAL, OR FIRE SPRINKLER WORK It should be known that this review shall not relieve the applicant of their responsibility to comply with the requirements of the City of Aspen Municipal Code. Pursuant to Sec.26.104.050, any permit or approval issued in error or otherwise not in conformity with the requirements of this Title, shall be void. Similarly, any permit or approval issued in reliance upon or as a result of, a materially false statement or representation made in the process of obtaining the permit or development approval shall, likewise, be void. Any person having received a void or voidable permit or approval shall not be relieved from having to comply with all applicable terms and conditions of this Title and the City shall not be estopped from fully enforcing same. Snow stops required at all locations where roofs could shed snow onto walkways, stairs, alleys, decks, exits, utilities and meters, emergency escape and rescue opening window wells, or adjacent properties - Ordinance 1, 2023. Work on heat tape is not permitted under this scope. Existing heat tape will remain untouched. If any existing heat tape is touched or new heat tape is proposed, it will be subject to REMP payment and heat tape control requirements and will require a sub-electrical permit. Reach out to your permit reviewer with questions. MID-ROOF AND FINAL ROOF INSPECTIONS REQUIRED TO RECEIVE A LETTER OF COMPLETENESS Mid-Roof Inspection REQUIRED After your roof permit is issued, and you have started work, you must request a mid-roof inspection. Inspectors will verify your Class A assembly on site. You will request inspection directly on SalesForce. Final Roof Inspection REQUIRED Once roof work is complete, you must request a final roof inspection. Inspectors will inspect snow guards and heat tape (if applicable). NOTE: If there is heat tape present, a final roof inspection cannot be requested until the sub-electrical permit is applied for as both final inspections will occur simultaneously. NOTE: You many not substitute roofing components/products that stray from the approved and issued ESR/QAI report without Building department approval. Class A assemblies are tested and listed with the specific roof products called out in the associated documentation. Installers shall follow all manufacturer's installation instructions for Class A roof assembly. 07 / 2 4 / 2 0 2 4 07/24/2024 ESR-2119 | Most Widely Accepted and Trusted Page 3 of 7 4.8 Reroofing: Prior to application of the shingles, the existing roof covering and underlayment must be completely removed. Any damaged sheathing must be replaced. The installation of the shingles must then proceed as described in Sections 4.1 through 4.5. An existing self-adhered ice barrier membrane may remain in place if covered with a new ice barrier membrane in accordance with the applicable code. The roof classification is as noted in Section 4.6 and Table 1. 5.0 CONDITIONS OF USE The DaVinci Slate, DaVinci Shake, Bellaforté Shake, and Bellaforté Slate roof shingles described in this report comply with, or are suitable alternatives to what is specified in, those codes listed in Section 1.0 of this report, subject to the following conditions: 5.1 Installation must comply with the applicable code, the manufacturer’s published installation instructions and this report. In the event of a conflict between this report and the manufacturer’s published installation instructions, this report governs. 5.2 The roof shingles are manufactured in Lenexa, Kansas, under a quality-control program with inspections by ICC-ES. 6.0 EVIDENCE SUBMITTED Data in accordance with the ICC-ES Acceptance Criteria for Special Roofing Systems (AC07), dated February 2014 (editorially revised May 2016). 7.0 IDENTIFICATION 7.1 Each roof shingle is labeled with the report holder’s name (DaVinci Roofscapes, LLC) and address, the product name, the shingle width, a production date code, and the ICC-ES evaluation report number (ESR-2119). 7.2 The report holder’s contact information is the following: DaVINCI ROOFSCAPES, LLC 13890 WEST 101ST STREET LENEXA, KANSAS 66215 (913) 599-0766 www.davinciroofscapes.com TABLE 1—FIRE CLASSIFICATIONS SYSTEM NO. ROOF CLASS ROOF DECK MIN. SLOPE UNDERLAYMENT1 DaVINCI ROOF SHINGLE Roof Shingle Exposure (in.) 1 A Min. 15/32- inch plywood 3:12 One layer ASTM D226 Type II (No. 30) or two layers of ASTM D Type I (No. 15) asphalt-saturated organic felt may be used; or One layer GAF Versashield® Fire-Resistant Roof Deck Protection (ESR-2053) DaVinci Slate 6 2 A Min. 15/32- inch plywood 3:12 One layer GAF Versashield® Fire-Resistant Roof Deck Protection (ESR-2053) DaVinci Slate DaVinci Shake 6 to 71/2 9 to 10 3 A Min. 15/32- inch plywood 3:12 One layer ASTM D226 Type II (No. 30) asphalt- saturated organic felt plus one layer of ASTM D3909 mineral-surfaced cap sheet DaVinci Slate DaVinci Shake Bellaforté Shake 6 to 8 9 to 10 12 4 A Min. 15/32- inch plywood 3:12 Two layers ASTM D226 Type II (No. 30) asphalt- coated glass-fiber-mat DaVinci Slate DaVinci Shake Bellaforté Shake Bellaforté Slate 6 to 8 9 to 10 12 12 5 A Min. 15/32- inch plywood 3:12 One layer Eco Chief Products SolarHide™-SRW (ESR-4035) DaVinci Slate DaVinci Shake Bellaforté Shake Bellaforté Slate 6 to 8 9 to 10 12 12 For SI: 1-inch =25.4 mm; 1ft = 0.305m 1 ASTM D226 Type I (No. 15) and Type II (No. 30) underlayment must be installed in accordance with the applicable building code. GAF Versashield® Fire-Resistant Roof Deck Protection underlayment must be installed in accordance with ESR-2053. Eco Chief Products SolarHide™-SRW underlayment must be installed in accordance with ESR-4035. 07/24/2024 linzhid 0046-2024-BROF ASPEN HOME 2020 IRREV TRUST 1201 TIEHACK RD 273511309009