HomeMy WebLinkAboutFile Documents.1280 Ute Ave.0024-2024-BROF (5)Amenity Energy Use Approved (2021 CODE)
RREMP CREMP
PERMIT #:0024-2024-BROF DATE:_7/1/24_
HEAT TAPE TOTAL WATTAGE:_____1320____
WATTS/FT:__________6___________________
TOTAL LINEAR FT:____220________________
OFFSET: _REMP PAYMENT________________
*Note:
- The first 1000W are exempt from REMP.
- All roof permits will require a sub-electrical
permit applied for by a licensed electrician.
- A sub-electrical permit must be applied for
prior to the final roof inspection as both final
inspections will occur simultaneously.
X
REVIEWED FOR
COMPLIANCE
05/08/2024 stuarth
BY HPC
SMOKE ALARMS AND
CARBON MONOXIDE
DETECTORS REQUIRED
THROUGHOUT DWELLING
UNIT PER CITY OF ASPEN
MUNICIPAL CODE 8.15
These plans must be kept at the
building site or inspection
delays may occur. Construction
shall conform to these plans. All
changes shall be approved by
the building official.
Field Plan Set Must Be Printed In Color
SEPARATE PERMITS ARE
REQUIRED FOR ELECTRICAL,
PLUMBING, MECHANICAL, OR
FIRE SPRINKLER WORK
It should be known that this review shall
not relieve the applicant of their
responsibility to comply with the
requirements of the City of Aspen
Municipal Code. Pursuant to
Sec.26.104.050, any permit or approval
issued in error or otherwise not in
conformity with the requirements of this
Title, shall be void. Similarly, any permit
or approval issued in reliance upon or
as a result of, a materially false
statement or representation made in
the process of obtaining the permit or
development approval shall, likewise,
be void. Any person having received a
void or voidable permit or approval
shall not be relieved from having to
comply with all applicable terms and
conditions of this Title and the City shall
not be estopped from fully enforcing
same.
04/23/20
MID-ROOF AND FINAL
ROOF INSPECTIONS
REQUIRED TO RECEIVE A
LETTER OF
COMPLETENESS
NOTE: You many not substitute roofing components/products that stray
from the approved and issued ESR/QAI report without Building
department approval.
Class A assemblies are tested and listed with the specific roof products
called out in the associated documentation. Installers shall follow all
manufacturer's installation instructions for Class A roof assembly.
Snow stops required at all locations
where roofs could shed snow onto
walkways, stairs, alleys, decks, exits,
utilities and meters, emergency escape
and rescue opening window wells, or
adjacent properties - Ordinance 1,
2023.
HEAT TAPE MANDATORY CONTROL REQ’S.
All heat tape systems shall meet the following per
(Ordinance 1 Series 2023):
-Automatic controls configured for system shut off when air
temperature is above 40°F and comply with one of the
following:
-shut off in absence of moisture
-shut off at night (daylight sensor or timer)
Final Roof Inspection
REQUIRED
Once roof work is complete, you
must request a final roof
inspection.
Inspectors will inspect snow
guards and heat tape (if
applicable).
NOTE: If there is heat tape
present, a final roof inspection
cannot be requested until the
sub-electrical permit is applied
for as both final inspections will
occur simultaneously.
Mid-Roof Inspection
REQUIRED
After your roof permit is issued,
and you have started work, you
must request a mid-roof
inspection.
Inspectors will verify your Class
A assembly on site.
You will request inspection
directly on SalesForce.
05/02/2024
linzhid
yes
SMOKE ALARMS AND
CARBON MONOXIDE
DETECTORS REQUIRED
THROUGHOUT DWELLING
UNIT PER CITY OF ASPEN
MUNICIPAL CODE 8.15
These plans must be kept at the
building site or inspection
delays may occur. Construction
shall conform to these plans. All
changes shall be approved by
the building official.
Field Plan Set Must Be Printed In Color
SEPARATE PERMITS ARE
REQUIRED FOR ELECTRICAL,
PLUMBING, MECHANICAL, OR
FIRE SPRINKLER WORK
It should be known that this review shall
not relieve the applicant of their
responsibility to comply with the
requirements of the City of Aspen
Municipal Code. Pursuant to
Sec.26.104.050, any permit or approval
issued in error or otherwise not in
conformity with the requirements of this
Title, shall be void. Similarly, any permit
or approval issued in reliance upon or
as a result of, a materially false
statement or representation made in
the process of obtaining the permit or
development approval shall, likewise,
be void. Any person having received a
void or voidable permit or approval
shall not be relieved from having to
comply with all applicable terms and
conditions of this Title and the City shall
not be estopped from fully enforcing
same.
Snow stops required at all locations
where roofs could shed snow onto
walkways, stairs, alleys, decks, exits,
utilities and meters, emergency escape
and rescue opening window wells, or
adjacent properties - Ordinance 1,
2023.
HEAT TAPE MANDATORY CONTROL REQ’S.
All heat tape systems shall meet the following per (Ordinance 1 Series 2023):
-Automatic controls configured for system shut off when air temperature is above
40°F and comply with one of the following:
-shut off in absence of moisture
-shut off at night (daylight sensor or timer)
SUB-ELECTRICAL PERMIT REQUIRED FOR HEAT
TAPE
A sub-electrical permit is required if a heat tape system is present, no matter the
total wattage. A licensed electrician must apply for the permit.
The sub-electrical permit must be applied for prior to the final roof inspection as
both final inspections will occur simultaneously.
5 watts x 170 linear feet of heat tape will be installed
Within the 1000W exemption and exempt from REMP
payment
11/08/2023
linzhid
MID-ROOF AND FINAL
ROOF INSPECTIONS
REQUIRED TO RECEIVE A
LETTER OF
COMPLETENESS
Add
Building
Coversheet
from SalesForce
here
Add Roof plan
showing roofing
details
+
Heat tape
Add company info
sheet or ESR
report showing
Class A roof
assembly
Roof Assembly
Asphalt shingles
Ice and water shield
Amenity Energy Use Approved (2021 CODE)
RREMP CREMP
PERMIT #:_______________DATE:________
HEAT TAPE TOTAL WATTAGE:_____________
WATTS/FT:_____________________________
TOTAL LINEAR FT:_______________________
OFFSET: _____________________________
*Note:
- The first 1000W are exempt from REMP.
- All roof permits will require a sub-electrical
permit applied for by a licensed electrician.
- A sub-electrical permit must be applied for
prior to the final roof inspection as both final
inspections will occur simultaneously.
Mid-Roof Inspection
REQUIRED
After your roof permit is issued,
and you have started work, you
must request a mid-roof
inspection.
Inspectors will verify your Class
A assembly on site.
You will request inspection
directly on SalesForce.
Final Roof Inspection
REQUIRED
Once roof work is complete, you
must request a final roof
inspection.
Inspectors will inspect snow
guards and heat tape (if
applicable).
NOTE: If there is heat tape
present, a final roof inspection
cannot be requested until the
sub-electrical permit is applied
for as both final inspections will
occur simultaneously.
NOTE: You many not substitute roofing components/products that stray
from the approved and issued ESR/QAI report without Building
department approval.
Class A assemblies are tested and listed with the specific roof products
called out in the associated documentation. Installers shall follow all
manufacturer's installation instructions for Class A roof assembly.