Loading...
HomeMy WebLinkAboutFile Documents.1 E Water Pl.0035-2023-BROF (9)SMOKE ALARMS AND CARBON MONOXIDE DETECTORS REQUIRED THROUGHOUT DWELLING UNIT PER CITY OF ASPEN MUNICIPAL CODE 8.15 These plans must be kept at the building site or inspection delays may occur. Construction shall conform to these plans. All changes shall be approved by the building official. Field Plan Set Must Be Printed In Color SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, MECHANICAL, OR FIRE SPRINKLER WORK It should be known that this review shall not relieve the applicant of their responsibility to comply with the requirements of the City of Aspen Municipal Code. Pursuant to Sec.26.104.050, any permit or approval issued in error or otherwise not in conformity with the requirements of this Title, shall be void. Similarly, any permit or approval issued in reliance upon or as a result of, a materially false statement or representation made in the process of obtaining the permit or development approval shall, likewise, be void. Any person having received a void or voidable permit or approval shall not be relieved from having to comply with all applicable terms and conditions of this Title and the City shall not be estopped from fully enforcing same. Snow guard above patio area Extent of proposed work 1 2 Existing gutter to be replaced like for like Existing downspout to be replaced like for like. Drains to landscaping Hardscape patio Hardscape walkway All areas not called out as hardscape are landscaping Site Plan Roof Replacement 1 - 2 E Water PL N Existing gutter to be replaced like for like Existing downspout to be replaced like for like. Drains to landscaping Hardscape walkway 04/17/2023  Proposed Roof Assembly Drawing – Show all layers/components from the roof sheathing up. Each component must b product and manufact urer name and existing to remain components and number of layers. Show flashing and ice bar  Existing roofing and number of layers: _________________________________________ 3 layers: 3/4" CDX ply, #15 bldg. paper, asphalt shingles Roof Assembly Listed Below Snow stops required at all locations where roofs could shed snow onto walkways, stairs, alleys, decks, exits, utilities and meters, emergency escape and rescue opening window wells, or adjacent properties - IBC 1513/COA 8.20.020(z). Heat trace/tape must be self-regulating type cable and must include automatic controls and timer capable of turning off the system when the outdoor temperature is above 50 degrees and during daylight hours. 05/03/2023 linzhid 0035-2023-BROF CITY OF ASPEN 1 E WATER PL 273513204001 0043-2023-BROF CITY OF ASPEN 2 E WATER PL 273513204002