HomeMy WebLinkAboutFile Documents.1215 Snowbunny Ln.0061-2023-BROF (9)SMOKE ALARMS AND
CARBON MONOXIDE
DETECTORS REQUIRED
THROUGHOUT DWELLING
UNIT PER CITY OF ASPEN
MUNICIPAL CODE 8.15
These plans must be kept at the
building site or inspection
delays may occur. Construction
shall conform to these plans. All
changes shall be approved by
the building official.
Field Plan Set Must Be Printed In Color
SEPARATE PERMITS ARE
REQUIRED FOR ELECTRICAL,
PLUMBING, MECHANICAL, OR
FIRE SPRINKLER WORK
It should be known that this review shall
not relieve the applicant of their
responsibility to comply with the
requirements of the City of Aspen
Municipal Code. Pursuant to
Sec.26.104.050, any permit or approval
issued in error or otherwise not in
conformity with the requirements of this
Title, shall be void. Similarly, any permit
or approval issued in reliance upon or
as a result of, a materially false
statement or representation made in
the process of obtaining the permit or
development approval shall, likewise,
be void. Any person having received a
void or voidable permit or approval
shall not be relieved from having to
comply with all applicable terms and
conditions of this Title and the City shall
not be estopped from fully enforcing
same.
06
/
1
4
/
2
0
2
3
Snow stops required at all locations
where roofs could shed snow onto
walkways, stairs, alleys, decks, exits,
utilities and meters, emergency escape
and rescue opening window wells, or
adjacent properties - Ordinance 1,
2023.
HEAT TAPE MANDATORY REQ’S.
All heat tape systems shall meet the following per (Ordinance 1 Series 2023):
-Automatic controls configured for system shut off when air temperature is above
40°F and comply with one of the following:
-shut off in absence of moisture
-shut off at night (daylight sensor or timer)
06/14/2023
06/14/2023
linzhid
0061-2023-BROF
LOWEY MARILYN TRUST
1215 SNOWBUNNY LN A
273512236001
SUB-ELECTRICAL PERMIT REQUIRED FOR HEAT
TAPE
A sub-electrical permit is required if a heat tape system is present, no matter the
total wattage. A licensed electrician must apply for the permit.
The sub-electrical permit must be applied for prior to the final roof inspection as
both final inspections will occur simultaneously.
Amenity Energy Use Approved (2021 CODE)
RREMP CREMP
PERMIT #:0061-2023-BROF DATE:11/15/23_
HEAT TAPE TOTAL WATTAGE:__6265_______
WATTS/FT:________7_____________________
TOTAL LINEAR FT:_____895_______________
OFFSET: ___REMP PAYMENT______________
*Note:
- The first 1000W are exempt from REMP.
- All roof permits will require a sub-electrical
permit applied for by a licensed electrician.
- A sub-electrical permit must be applied for
prior to the final roof inspection as both final
inspections will occur simultaneously.
MID-ROOF AND FINAL
ROOF INSPECTIONS
REQUIRED TO RECEIVE A
LETTER OF
COMPLETENESS
X