Loading...
HomeMy WebLinkAboutFile Documents.1215 Snowbunny Ln.0061-2023-BROF (9)SMOKE ALARMS AND CARBON MONOXIDE DETECTORS REQUIRED THROUGHOUT DWELLING UNIT PER CITY OF ASPEN MUNICIPAL CODE 8.15 These plans must be kept at the building site or inspection delays may occur. Construction shall conform to these plans. All changes shall be approved by the building official. Field Plan Set Must Be Printed In Color SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, MECHANICAL, OR FIRE SPRINKLER WORK It should be known that this review shall not relieve the applicant of their responsibility to comply with the requirements of the City of Aspen Municipal Code. Pursuant to Sec.26.104.050, any permit or approval issued in error or otherwise not in conformity with the requirements of this Title, shall be void. Similarly, any permit or approval issued in reliance upon or as a result of, a materially false statement or representation made in the process of obtaining the permit or development approval shall, likewise, be void. Any person having received a void or voidable permit or approval shall not be relieved from having to comply with all applicable terms and conditions of this Title and the City shall not be estopped from fully enforcing same. 06 / 1 4 / 2 0 2 3 Snow stops required at all locations where roofs could shed snow onto walkways, stairs, alleys, decks, exits, utilities and meters, emergency escape and rescue opening window wells, or adjacent properties - Ordinance 1, 2023. HEAT TAPE MANDATORY REQ’S. All heat tape systems shall meet the following per (Ordinance 1 Series 2023): -Automatic controls configured for system shut off when air temperature is above 40°F and comply with one of the following: -shut off in absence of moisture -shut off at night (daylight sensor or timer) 06/14/2023 06/14/2023 linzhid 0061-2023-BROF LOWEY MARILYN TRUST 1215 SNOWBUNNY LN A 273512236001 SUB-ELECTRICAL PERMIT REQUIRED FOR HEAT TAPE A sub-electrical permit is required if a heat tape system is present, no matter the total wattage. A licensed electrician must apply for the permit. The sub-electrical permit must be applied for prior to the final roof inspection as both final inspections will occur simultaneously. Amenity Energy Use Approved (2021 CODE) RREMP CREMP PERMIT #:0061-2023-BROF DATE:11/15/23_ HEAT TAPE TOTAL WATTAGE:__6265_______ WATTS/FT:________7_____________________ TOTAL LINEAR FT:_____895_______________ OFFSET: ___REMP PAYMENT______________ *Note: - The first 1000W are exempt from REMP. - All roof permits will require a sub-electrical permit applied for by a licensed electrician. - A sub-electrical permit must be applied for prior to the final roof inspection as both final inspections will occur simultaneously. MID-ROOF AND FINAL ROOF INSPECTIONS REQUIRED TO RECEIVE A LETTER OF COMPLETENESS X