Loading...
HomeMy WebLinkAboutFile Documents.22 W Water Pl.0117-2020-BRES (5)These plans must be kept at the building site or inspection delays may occur. Construction shall conform to these plans. All changes shall be approved by the building official. Field Plan Set Must Be Printed In Color SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, MECHANICAL, OR FIRE SPRINKLER WORK 11/09/2020 nickt SMOKE ALARMS AND CARBON MONOXIDE DETECTORS REQUIRED THROUGHOUT DWELLING UNIT PER CITY OF ASPEN MUNICIPAL CODE 8.15 12/02/2020 sophiev NO EXTERIOR LIGHTING IN SCOPE OF WORK FIRE SPRINKLERS REQUIRED