HomeMy WebLinkAboutFile Documents.1050 Waters Ave.0112-2022-BRES (5)SMOKE ALARMS AND
CARBON MONOXIDE
DETECTORS REQUIRED
THROUGHOUT DWELLING
UNIT PER CITY OF ASPEN
MUNICIPAL CODE 8.15
These plans must be kept at the
building site or inspection
delays may occur. Construction
shall conform to these plans. All
changes shall be approved by
the building official.
Field Plan Set Must Be Printed In Color
SEPARATE PERMITS ARE
REQUIRED FOR ELECTRICAL,
PLUMBING, MECHANICAL, OR
FIRE SPRINKLER WORK
It should be known that this review shall
not relieve the applicant of their
responsibility to comply with the
requirements of the City of Aspen
Municipal Code. Pursuant to
Sec.26.104.050, any permit or approval
issued in error or otherwise not in
conformity with the requirements of this
Title, shall be void. Similarly, any permit
or approval issued in reliance upon or
as a result of, a materially false
statement or representation made in
the process of obtaining the permit or
development approval shall, likewise,
be void. Any person having received a
void or voidable permit or approval
shall not be relieved from having to
comply with all applicable terms and
conditions of this Title and the City shall
not be estopped from fully enforcing
same.
RECEPTION#:680847, R: $28.00, D:$0.00
DOC CODE: RESOLUTION
P9 1 of 4,09/24/2021 at 10:42:36 AM
Janice K. Vos Caudill, Pitkin County, CO
RESOLUTION#11
SERIES OF 2021)
A RESOLUTION OF THE ASPEN PLANNING AND ZONING COMMISSION
GRANTING SPECIAL REVIEW/STREAM MARGIN REVIEW FOR THE PROPERTY
LOCATED AT 1050 WATER AVENUE,UNIT 13,ASPEN TOWNHOUSES BY THE
RIVER CONDOUNIUMS, CITY OF ASPEN.
PARCEL ID: 2737-182-40-015
WHEREAS, the Community Development department received an application from
BendonAdams representing Andrew& Ivette Rothschild, requesting Special Review and Stream
Margin Review approvals related to a deck which was recently repaired and altered without
requisite land use and building permits and which is located at 1050 Waters Avenue, Unit 13 of
the Aspen Townhouses by the River Condominiums; and,
WHEREAS, the Community Development department Staff reviewed the application for
compliance with the applicable review standards; and,
WHEREAS,upon review of the application and the Land Use Code standards, and referral of
the application to other City Departments for comments, the Community Development Director
recommends Special Review and Stream Margin approval to accept the deck as an existing non-
conformity, and to accept the replacement of the deck surface and some support structure as
maintenance of a legal non-conforming structure provided for in section 26.312.030 of the Land
Use Code. The Community Development Director recommends, however, that the Planning and
Zoning Commission require the removal of recently constructed expansions to the deck features
due to their non-compliant location within the Stream Margin; and,
WHEREAS, the City of Aspen Planning and Zoning Commission reviewed and considered
the application under the applicable provisions of the Land Use Code as identified herein, in
particular Section 26.312.030, reviewed and considered the recommendation of the Community
Development Director and took and considered public comment at a duly noticed public hearing
on June 1, 2021 and September 21', 2021; and,
WHEREAS,the City of Aspen Planning and Zoning Commission finds that the development
proposal meets the applicable review criteria and that approval of the request is consistent with the
goals and objectives of the Land Use Code; and,
WHEREAS, the City of Aspen Planning and Zoning Commission finds that this Resolution
furthers and is necessary for the promotion of public health, safety, and welfare, and,
WHEREAS,the City of Aspen Planning and Zoning Commission approves Resolution#
Series of 2021, by a 6 to V (x-x)vote, recommending approval for Special Review/Stream
Margin approval as identified herein.
P&Z Resolution# //, Series of 2021
Page 1 of 3
NOW,THEREFORE,BE IT RESOLVED the City of Aspen Planning and Zoning
Commission finds as follows:
Section 1: Legal Non-Conforming Structure.
The deck is a legal non-conforming structure as defined in the Land Use Code. The applicant's
representation that the recent replacement of the deck surface, benches, and select supports were
undertaken in the same dimension and location as has been in place for a long period of time are
accepted and the work is considered to have been maintenance and repair. The accepted dimensions
of the deck are as depicted on Exhibit A.
Pursuant to Section 26.312.030, moving forward, the deck shall be subject to regulation as a non-
conforming structure and may not be expanded, enlarged, or extended in any manner that increases
the nonconformity unless any required approvals are issued.
Section 2: Removal of Unapproved Expansions of the Non-Conforming Deck.
All elements that have been recently added to the deck, with the exception of those described above,
are subject to the following conditions:
1. The stairs and concrete landing adjacent to the deck shall be removed within a reasonable amount
of time, but in no event later than nine months from September 21, 2021.
2. A Revegetation Plan shall be submitted and approved prior to any construction or work on the
stairs and landing. Revegetation shall be completed in accordance with the Revegetation Plan.
3. The pergola constructed above the deck shall be removed within a reasonable amount of time, but
in no event later than nine months from September 21, 2021.
4. The walls on either end of the deck have been repaired and now exceed the original dimensions.
The deck walls shall be returned to their original size which shall be consistent with the adjacent
deck on Unit#15 within a reasonable amount of time,but in no event later than nine months from
September 21, 2021
5. All work completed in accordance with this approval shall comply with all building codes, and
building permits shall be obtained prior to commencement of work. All permit fees will be
doubled, consistent with penalties for work undertaken without a building permit.
Section 3: Material Representations
All material representations and commitments made by the Applicant pursuant to the development
proposal approvals as herein awarded, whether in public hearing or documentation presented
before the Planning and Zoning Commission, are hereby incorporated in such site development
approvals and the same shall be complied with as if fully set forth herein, unless amended by an
authorized entity.
Section 4: Existing Litigation
This Resolution shall not affect any existing litigation and shall not operate as an abatement of any
action or proceeding now pending under or by virtue of the ordinances repealed or amended as
herein provided, and the same shall be conducted and concluded under such prior ordinances.
P&Z Resolution# , Series of 2021
Page 2 of 3
Section 5: Severability
If any section, subsection, sentence, clause,phrase, or portion of this Resolution is for any reason
held invalid or unconstitutional in a court of competent jurisdiction, such portion shall be deemed
a separate, distinct and independent provision and shall not affect the validity of the remaining
portions thereof.
APPROVED by the Commission at its meeting on September 21, 2021.
APPROVED AS TO FORM: PLANNING AND ZONING
COMMISSIO
a harine Jo n,Assistant City Attorney pe McKnight,Ch
ATTEST:
Nicole Henning, City Cl
Attachment:
Exhibit A-Approved survey of legal non-conforming structure
P&Z Resolution# , Series of 2021
Page 3 of 3
sophiev
01/10/2023ZONING
0112-2022-BRES
ROTHSCHILD IVETTE SCHNEIDER TR
1050 WATERS AVE 13
273718240015
APPLICATION ACCEPTED DATE: 2022-09-30 PERMIT NUMBER: 0112-2022-BRES
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING PERMIT COVERSHEET
PROPERTY INFORMATION
ADDRESS: 1050 WATERS AVE 13 UNIT:
PARCEL ID: 273718240015 LEGAL DESCRIPTION: ASPEN TOWNHOUSES BY THE
RIVER
OWNER: ROTHSCHILD IVETTE SCHNEIDER TRUST
PERMIT CONTRACTOR:
DESCRIPTION OF WORK The existing pergola, side walls, deck bench & step needs to be code compliant.
The step needs to be removed, the pergola above the deck needs to be removed, the side walls need to be
reduced in size & the bench needs to be code compliant.
I will provide pictures
USE OF BUILDING Multi-Family FIRE SPRINKLER REQUIRED?
CLASS OF WORK Residential FIRE SPRINKLER TYPE
BUILDING TYPE (IRC) REQUIRED SPECIAL
INSPECTIONS
CONSTRUCTION TYPE VA ENERGY CODE COMPLIANCE
OCCUPANCY GROUP (IBC) R-2 WORK CHANGES BUILDING
FOOTPRINT? No
CODE EDITIONS 2015 IBC TOTAL SPA SQ.FT.
OTHER CODE EDITIONS TOTAL SNOWMELT SQ.FT.
HISTORIC PROPERTY? No TOTAL POOL SQ.FT.
FIRE SPRINKLER EXISTING?
1015.3 Height. Required guards shall be not less than 42
inches (1067 mm) high, measured vertically as follows:
1. From the adjacent walking surfaces.
2. On stairways and stepped aisles, from the line connect-
ing the leading edges of the tread nosings.
3. On ramps and ramped aisles, from the ramp surface at
the guard.
1015.4 Opening limitations. Required guards shall not have
openings that allow passage of a sphere 4 inches (102 mm) in
diameter from the walking surface to the required guard
height.
Reconstructed guardrail shall fully comply with IBC 1015:
02/13/2023
justinh
No details provided for replacement guard materials or
construction. Any steel fabrication shall require 3rd party special
inspection. If proposed, a fully executed agreement and shops
shall be required to be submitted for review and approval prior to
fabrication and installation. Contact plans examiner with any
questions.
09
/
2
9
/
2
0
2
2
09
/
2
9
/
2
0
2
2
09
/
2
9
/
2
0
2
2
09
/
2
9
/
2
0
2
2
09
/
2
9
/
2
0
2
2
sophiev
01/10/2023ZONING
1015.3 Height. Required guards shall be not less than 42
inches (1067 mm) high, measured vertically as follows:
1. From the adjacent walking surfaces.
2. On stairways and stepped aisles, from the line connect-
ing the leading edges of the tread nosings.
3. On ramps and ramped aisles, from the ramp surface at
the guard.
1015.4 Opening limitations. Required guards shall not have
openings that allow passage of a sphere 4 inches (102 mm) in
diameter from the walking surface to the required guard
height.
Reconstructed guardrail shall fully comply with IBC 1015:
02/13/2023
justinh
No details provided for replacement guard materials or
construction. Any steel fabrication shall require 3rd party special
inspection. If proposed, a fully executed agreement and shops
shall be required to be submitted for review and approval prior to
fabrication and installation. Contact plans examiner with any
questions.
09
/
2
9
/
2
0
2
2
09
/
2
9
/
2
0
2
2
09
/
2
9
/
2
0
2
2
Deck walls on either side to be restored to original condition.
Approved proposed
wall layout. Minimum
height 42" from the
deck surface.
sophiev
01/10/2023ZONING
1015.3 Height. Required guards shall be not less than 42
inches (1067 mm) high, measured vertically as follows:
1. From the adjacent walking surfaces.
2. On stairways and stepped aisles, from the line connect-
ing the leading edges of the tread nosings.
3. On ramps and ramped aisles, from the ramp surface at
the guard.
1015.4 Opening limitations. Required guards shall not have
openings that allow passage of a sphere 4 inches (102 mm) in
diameter from the walking surface to the required guard
height.
Reconstructed guardrail shall fully comply with IBC 1015:
Compliant height
guard shall be
provided regardless of
whether the previously
existing condition
complied.
02/13/2023
justinh
No details provided for replacement guard materials or
construction. Any steel fabrication shall require 3rd party special
inspection. If proposed, a fully executed agreement and shops
shall be required to be submitted for review and approval prior to
fabrication and installation. Contact plans examiner with any
questions.