HomeMy WebLinkAboutFile Documents.309 Oak Ln.0021-2022-BRES (34)SMOKE ALARMS AND
CARBON MONOXIDE
DETECTORS REQUIRED
THROUGHOUT DWELLING
UNIT PER CITY OF ASPEN
MUNICIPAL CODE 8.15
These plans must be kept at the
building site or inspection
delays may occur. Construction
shall conform to these plans. All
changes shall be approved by
the building official.
Field Plan Set Must Be Printed In Color
SEPARATE PERMITS ARE
REQUIRED FOR ELECTRICAL,
PLUMBING, MECHANICAL, OR
FIRE SPRINKLER WORK
It should be known that this review shall
not relieve the applicant of their
responsibility to comply with the
requirements of the City of Aspen
Municipal Code. Pursuant to
Sec.26.104.050, any permit or approval
issued in error or otherwise not in
conformity with the requirements of this
Title, shall be void. Similarly, any permit
or approval issued in reliance upon or
as a result of, a materially false
statement or representation made in
the process of obtaining the permit or
development approval shall, likewise,
be void. Any person having received a
void or voidable permit or approval
shall not be relieved from having to
comply with all applicable terms and
conditions of this Title and the City shall
not be estopped from fully enforcing
same.
11/08/2022
kylas
427 Rio Grande Place, Aspen, CO 81611
(970) 920.5090
www.aspen.gov
NOTICE OF EXEMPTION AND AUTHORIZATION TO APPLY FOR LAND
USE/BUILDING PERMITS DURING THE EFFECTIVE TERM OF
ORDINANCE #27, SERIES OF 2021
Property Address:
Parcel ID Number:
Property Owner:
Representative/email:
Scope o f Work (Provide narrative here and a separate pdf which is a succinct and
clear set of supporting documents, to be attached to this form as Exhibit A, such as
Letters of Completeness, Resolutions, Development Orders, Land Use Case
numbers, Building Permit numbers etc. If the representation being made is that the
work does not involve dimensional changes prohibited by the moratorium provide
existing and proposed calculations, floor Plans and and elevations to be attached:
___________________________________________________________________
___________________________________________________________________
Due to the circumstances noted below, the above referenced project as defined by
the Scope o f Work is exempt from the application of Ordinance #27, Series of 2021,
and is authorized to pursue a land use review and/or building permit review during
the effective term o f Ordinance #27, Series of 2021, an ordinance which generally
places a moratorium on residential development. This authorization does not
guarantee issuance of a building permit or approval of any land use application. The
applicant must submit complete information and pursue all authorized approvals in a
timely fashion, adhering to all deadlines for submission, terms of Vested Rights,
response times required to maintain an active building permit, and all other Land Use
Code and Building Code requirements in effect as of December 8, 2021. Any
amendments and or additional approvals not addressed or identified in the
application, may be subject to Ordinance #27, Series of 2021.
The project described above is permitted to proceed with land use review because
(check all that apply):
New single-family home
309 Oak Lane Aspen, CO 81611
273707490309
Chris Campaigne
taylor@shapearchitecturestudio.com
02/14/2022
□A land use application for a Development Order or Notice of Approval was
submitted to the Community Development Department prior to final passage of
the ordinance on December 8, 2021, and was subsequently deemed to be
complete by the Community Development Department Director.
□The land use application is seeking a Development Order or Notice of Approval
for a project consisting of 100% Af fordable Housing as that term is defined at
§26.104.100 of the Aspen Municipal Code, or as may be deemed necessary for
the issuance of Certificates of Affordable Housing for a 100% Affordable Housing
project, or as determined by the Community Development Director.
□The land use application involves Voluntary AspenModern designation
processes that meet the requirements of Section 26.415.025.C and
26.415.030.
□The land use application or administrative request may be necessary to issue
exempt building permits as described below, and as determined by the
Community Development Director.
The project described above is permitted to submit for building permit review
bec ause (check all that apply ):
□A building permit application was submitted to the Community Development
Department prior to final passage of the ordinance on December 8, 2021, and
was subsequently deemed to be complete by the Chief Building Official.
□It is a building permit for a project that will not increase the gross square
footage of development, Net leasable area, or Net livable area of any building
and does not meet the definition of demolition.
□It is a building permit for a project that will not increase the Height of any
building. This includes additions to or replacement of mechanical equipment or
energy eff iciency systems pursuant to height exemptions as set f orth at
§26.575.020 of the Aspen Municipal Code, or as determined by the Community
Development Director.
□It is a building permit for commercial and lodge development as stand-alone
uses on a parcel or property .
□The project has received or is eligible to receive a Development Order or
Notice of Approval on the effective date of this ordinance.
□It is a building permit for 100% affordable housing projects as that term is
defined at §26.104.100 of the Aspen Municipal Code.
□It is a building permit for demolition or repair of non-habitable structures.
Issued on ___________________, 20___, this certificate is valid through the
effective date of Ordinance #27, Series of 2021, or any Ordinance which supersedes
a provision of Ordinance #27, Series of 2021 in a manner which is relevant to the
Scope of Work. A copy of this certificate is required when applying for any land use
review or building permit. This Notice is not a Development Order or Administrative
Determination that is subject to appeal.
______________________________
Phillip Supino
Community Development Director
Disclaimer: This ex emption is given based on the information provided by t he applicant. If changes are
made, or the scope, after a more detailed review, is found to be subject to Ordinance 27, 2021, the
exemption may be revoked.
Exhibit A: Floor plans and elevations representing scope of work
X
X
February 7 22
n
02/14/2022
0021-2022-BRES
Campaigne
309 Oak Ln
273707490309
APPLICATION ACCEPTED DATE: 2022-02-18 PERMIT NUMBER: 0021-2022-BRES
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING PERMIT COVERSHEET
PROPERTY INFORMATION
ADDRESS : 309 OAK LN UNIT:
PARCEL ID: 273707490309 LEGAL DESCRIPTION: SMUGGLER PARK
OWNER : CAMPAIGNE CHRISTOPHER C & ELIZABETH E
PERMIT CONTRACTOR : SH BUILDING GROUP LLC
DESCRIPTION OF WORK Demolish existing home, and construction of a n ew single-family home in the same footprint.
USE OF BUILDING Single Family FIRE SPRINKLER REQUIRED? No
CLASS OF WORK Residential FIRE SPRINKLER TYPE
BUILDING TYPE (IRC) One family REQUIRED SPECIAL
INSPECTIONS Structural Steel Welding
CONSTRUCTION TYPE VB ENERGY CODE COMPLIANCE Prescriptive Table
OCCUPANCY GROUP (IBC) R -1 WORK CHANGES BUILDING
FOOTPRINT? No
CODE EDITIONS 2015 IRC TOTAL SPA SQ.FT.
OTHER CODE EDITIONS
2015 International Energy
Conservation Code
2015 International Plumbing Code
2015 International Mechanical
Code
2015 International Fuel Gas Code
2015 International Fire Code
2020 National Electric Code
TOTAL SNOWMELT SQ.FT.
HISTORIC PROPERTY? No TOTAL POOL SQ.FT.
FIRE SPRINKLER EXISTING? No
j. Table R402.1.2 “Insulation and Insulation and Fenestration Requirements by Component” has
been amended as follows:
Fenestration
U-Factor
(b)
Skylight
U-Factor
(b)
Glazed
Fenestration
SHGC (b)
(e)
Ceiling
R-Value
Wood
Frame
Wall
R-Value
Mass Wall
R-Value (i)
Floor
R-Value
Basement
Wall
R-Value
(c)
Slab
R-Value &
Depth (d)
Crawl-
space Wall
R-Value
(c)
0.28 0.55 NR 49 20+5 or
13+10 (h)
19/21 38 (g) 15/19 10, 4ft 15/19
k. Table R402.1.4 “Equivalent U-Factors” has been amended as follows:
Fenestration
U-Factor
Skylight
U-Factor
Ceiling
U-Factor
Frame
Wall U-
Factor
Mass Wall
U-Factor
(b)
Floor
U-Factor
Basement
Wall
U-Factor
Crawl-
space Wall
U-Factor
0.28 0.55 0.026 0.045 0.057 0.028 0.050 0.055
Prescriptive Energy Requirements
R-Value
OR
U-factor
SPECIAL INSPECTION REQUIRED:
-Structural steel welding: Field & Shop
-High strength bolting
-Epoxy anchors
-Intumescent paint
-Spray applied fire resistive materials
-Permanent micropiles
Special inspection is required per 2015 IBC
section 1704. Inspector to verify that copy of
agreement for inspection program to be on
the job site prior to performing any
inspections. A copy of all Special Inspector
field reports to be on the job site for
inspectors' review if requested. Failure to
comply may result in denial of inspection.
11/29/2022
jimp
External Energy Use Approved
RREMP CREMP
PERMIT #:_______________DATE:________
SNOWMELT:_____________________________
POOL: _____________________________
SPA: _____________________________
OFFSET:________________________________
REMP SHEET: __________________________
REVIEWED BY: _________________________
SNOWMELT SYSTEM AND EQUIPMENT MANDATORY REQ’S.
All snowmelt systems shall meet the following:
-Any portions in the Right of Way must be on a separate zone. A ROW
permit and Permanent Encroachment License are required.
-R10 insulation shall be installed under the area to be snow melted or R5
insulation shall be installed under and at the slab edges. (Ordinance 11
Series 2011)
-Automatic controls installed for system shut off when pavement
temperature is above 50°F and no precipitation is falling. (2009 IECC
Sec. 403.8 & 503.2.4.5)
-Automatic or manual controls installed for system shut off when outdoor
temperature is above 40°F. (2009 IECC Sec. 403.8 & 503.2.4.5)
-Inspection by testing hydrostatically at 1½ times max system design
pressure, but not less than 100psi, for 15minutes. (2009 IMC Sec.
1208.1)
MINIMUM BOILER AFUE: _________________
0021-2022-BRES
Jim Pomeroy 11/28/22
309 Oak Lane, Aspen Co 81611
0021-2022-BRES
All soil is contaminated, therefore will be disposed at the landfill
There will be no loose soil left at the property. New soil will be
obtained for backfill
01/03/23
01/03/23
01/16/23
SPECIAL INSPECTION AND TESTING AGREEMENT
This form is required for projects needing special inspection and/or testing per Chapter 17 of the International
Building Code (IBC).
Project Address: __________________________________ Permit Number: ______________________
BEFORE A PERMIT CAN BE ISSUED: The owner, or the design professional in responsible charge, acting as
the owner’s agent, shall complete two copies of this agreement and the attached Special-inspection and Testing
Schedule, including the required acknowledgments. A pre-construction conference with the parties involved may be
required to review the special-inspection requirements and procedures.
APPROVAL OF SPECIAL INSPECTORS: Special inspectors may have no financial interest in the projects for
which they provide special inspections. Special inspectors shall be approved by the building department prior to
performing any duties. Special inspectors shall submit their qualifications and are subject to personal interviews for
pre-qualification. Special inspectors shall display approved identification, as stipulated by the building official,
when performing the function of special inspector.
Special inspection and testing shall meet the minimum requirements of the International Building Code Section
1704. The following conditions are also applicable:
A. Special Inspector Responsibilities:
1. Signify presence at job site. Special inspectors should notify contractor personnel of their
presence and responsibilities at the job site. If required by the building official, they shall sign in
on the appropriate form posted with the building permit.
2. Observe assigned work. The special inspector shall observe assigned work for conformance with
the building department approved (stamped) design drawings, specifications, and applicable
workmanship provisions of the International Building Code. Architect\engineer-reviewed shop
drawings may be used only as an aid to inspection.
For continuous special-inspection, the special inspector shall be on site at all times observing the
work requiring special inspection. Periodic inspections, if any, must have prior approval based on
a separate written plan reviewed and approved by the building department and the engineer or
architect of record.
3. Report nonconforming items. The special inspector shall bring nonconforming items to the
immediate attention of the contractor and note all such items in the daily report. If any item is not
resolved in a timely manner or is about to be incorporated in the work, the special inspector shall
immediately notify the building department by telephone or in person, notify the engineer or
architect, and post a discrepancy notice.
4. Provide timely reports. The special inspector shall complete written inspection reports for each
inspection visit and provide the reports on a timely basis determined by the building official. The
special inspector or inspection agency shall furnish these reports directly to the building official,
engineer or architect of record, and others as designated. [IBC Sec. 1704.1.2] These reports should
be organized on a daily format and may be submitted weekly at the option of the building official.
These reports should include:
a. Description of daily inspections and tests made with applicable locations,
b. Listing of nonconforming items,
c. Report on how nonconforming items were resolved or unresolved as applicable,
d. Itemized changes authorized by the architect, engineer, and building official if
not included in nonconforming items
5. Provide Final Inspection Report. The special inspector shall submit a written final report
documenting required special inspections and correction of any discrepancies noted in the
inspections prior to the final building inspection.
309 OakLane 0021-2022-BRES
B. Owner Responsibilities:
1. The project owner, an agent of the owner, or the design professional in responsible charge acting
as the owner’s agent, is responsible for employing special-inspection services. The special
inspector/agency shall not be in the employ of the contractor, subcontractor or material supplier.
[IBC Sec 1704.1] In case of an owner/contractor, the special inspector\agency shall be employed
as specified by the building official.
C. Design Professional in Responsible Charge Responsibilities:
Design Professional in Responsible Charge definition: An individual who is registered or licensed to practice their
respective design profession as defined by the statutory requirements of the professional registration laws of the state or
jurisdiction in which the project is to be constructed; who is engaged by the owner to review and coordinate certain
aspects of the project, as determined by the building official, for compatibility with the design of the building or
structure.
1. Prepare statement of special inspections. The registered design professional in responsible
charge shall prepare a statement of special inspections in accordance with IBC Section 1705 for
submittal by the applicant. The statement of special inspections shall identify the following:
a. The materials, systems, components and work required to have special inspection or
testing by the building official or by the registered design professional responsible for
each portion of the work.
b. The type and extent of each special inspection.
c. The type and extent of each test.
d. For each type of special inspection, identification as to whether it will be continuous
special inspection or periodic special inspection.
D. Contractor Responsibilities:
1. Notify the special inspector. The contractor is responsible for notifying the special inspector or
agency regarding individual inspections for items listed on the attached schedule and as noted on
the building department approved plans. Adequate notice shall be provided so the special inspector
has time to become familiar with the project.
2. Provide access to approved plans. The contractor is responsible for providing the special
inspector access to approved plans.
3. Retain special inspection records. Upon request, the contractor is also responsible for retaining,
at the job site, all special inspection records completed by the special inspector.
E. Inspection of Fabricators:
1. Fabrication of structural assemblies and members. Where fabrication of structural load-bearing
members and assemblies is being performed on the premises of a fabricator’s shop, IBC Section
1704.2 shall require special inspection of the fabricated items.
2. Fabrication and implementation procedures. The special inspector shall verify that the
fabricator maintains detailed fabrication and quality control procedures that provide a basis for
inspection control of the workmanship and the fabricator’s ability to conform to approved
construction documents and reference standards. The special inspector shall review the procedures
for completeness and adequacy relative to code requirements for fabricator’s scope of work.
F. Approved Fabricator Responsibilities:
1. Fabrication exempt inspections. Special inspections are not required where work is done on the
premise of a fabricator registered and approved to perform such work without special inspection.
If work is done on site that requires special inspection, special inspection will be required.
2. Approval of fabricator. Approval shall be based upon review of the fabricator’s written
procedural and quality control manuals and periodic auditing of fabrication practices by an
approved special inspection agency.
3. Completion of fabrication. Upon completion of fabrication, the approved fabricator shall submit
certificate of compliance to the building official stating that the work was performed in accordance
with the approved construction documents.
C°!°frarfupceE#thent
andEnvironment
DEMOLITION NOTIFICATION APPLICATION FORM
AppLicATioN FEE MusT AccoMPAri¥ Tiits FORM
INCOMPLETE APPLICATIONS WILL BE RETURNED
(Notice will be mailed to the demolition contractor unless specified otherwise)
Fee: $50 + $5 per 1000 ft2 of area to be demolished = S
(See instniction #1 on reverse side)
Submit form to:
Pemit Coordinator
Colorado Dept. of Public
Health and Environment
APCD-lE-B1
4300 Cherry Creek Drive
South
Denver, CO 80246-1530
Phone : 303J592€100
Fax: 303-782J)278
AsbestDs@stafe.co.us
Ie
Company`Natne:__I£as BtiiidingName:
SH Built Canpalgre Residence
Street:Square footage Of footpririt Of facility or portion of facilfty to be demolished
314 Aspen Business Ctr, Ste. 8 1,382
City: State: 81611 Street: 309 Oak Ln®9t:Aspen CO
Teleohone # I Fax #City: I Pitkin cnty. I zio code:aaIa-(970) 923+ 122 (any@shbuilt.com ..i_a'=Aspen- I I 8161r
Project Manager:Cell Phone #Proposed start Date Proposed completon Data
hfudian Erwin (970) 309-0371 i5E 08/01 /2022 , 01 /30/3023
I cerrify that the Certified Asbestos Bu ilding Inspector has informed me Method/Means of Demolition:H\/\heckingIBumingtIlmplosien H Moving X Other, specify:a about any remaining asbestoscontaining materials in the facility to be a'a
E®a demolished.
Signature:Print Name:
Madian Erwin NIOSH 7400
Landfill Receiving Building Debris:tBuming requires additional author[zation -Please call (303) 692-3100 and ask
Yes to speak to the Open Burning Permit Coordinator-General Abatement Contractor (GAC)I®5 Ormer's Name:a>!iJ2&Quetzal Environlnental #468 Chris Campaigne
CDPH E Asbestos permit # Total Quantity of Asbestos Removed Street: 309 Oak Ln.
Cmly appr'ovar by 22gstfro'6'rviHjt
Trevor S a)I5
Date Removal completed I Telephone #I Aspen CO I 61611
7/1 22 (303) 956-8586 Im'
Type(s) of Asbestos-Containing Material Removed:Contact's Name: Telephone #
ACM vinyl sheet Chris canpaigne (719) 293-0513
Ia
`vi:rm ffiy si-giiatu`i`e b€tow, i ceiifty th.at i possess lit-Ti`€ift AHERA a-th+edifeaEit5'n~ arid sirate Of-C.6iorfide eefffiffiGati.en as
an Asbestos Building lnsp ector. I also certify that I ha ve tho roughly inspected the facility to be demolished, as listed
i;jn the Demolition Site bloc k above, sampled all suspect materials, had all samples analyzed for the presence of
®CL asbestos by a NVLAP-accredited laboratory, and have determined that no Regulated ACM exists anywhere in the0==facility.* I also certify that have informed the owner/operator of the facility or the demolition contractor that any
co.9 asbestos-contain ing in ate rial allowed to stay in the facility must remain non-friable during demolition. Specify type(s)
£ .¥ i Of ,cea,4 renainng, beky9,J: {Sfaeeek apprcp#ate be3±{es}}:
?5a'L='Ea't}
I Vinyl asbestos floor tile (VAT) I VAT mastic I Tar/asphalt impregnated roofing I Asphaltic pipe coatings
I Spray-applied tar coatings I Caulking I Glazing I Other, specfty:--------I---dif`:::::\\I{:I..:ft``{..---=-`_-==i_i€ .;a-. `+-ir--;a: (i.-,,.;
Dat6°¥':aj&grfuTa°3Cirtc,#ci I 5X5ra.ti#.a5o ,2?3 i Telephone #( 9?Li `a?4/,--?/ 3q ; Ce" Ph°:e&?ca -366`3383
!j!
I verify that all refrigerants from air conditioning/refrigeration applia nces have been properly recovered in accordance with AQCC Regulation No.
15 (for information on CFC requirements call 692-3100). I further verify that all luminous exit signs (containing radioactive material) have been
disposed of in accordance with 6 CCR 1007-1 subpart 3.6.4.3 (for information on luminous exit sign requirements call 303€92-3320).
CHECK THE APPROPRIATE BOX:
I E] Buildingowner i E] Contractor i E] other i DateI signetwe:PeiRt` Name:
THIS Box IS FOR CDPHE USE ONLy:
PQs_t.m`a_rk o_r Ha_nd_ QeJ`ive_ry Da_t_e_: Asp.ro_ve_d_ fey.: i GQ¢.Q; E` injti`atral`Q E tr`ansf`er`-3ee
Forrtt ofpaym-enr& # PeTmtt# I Re-c-orti# I Date ls"ed:
* Regulated asbestos-containing materials means (a) friable asbest.o_s-.gontainLn.g.pr_aj§[ia|, (b) Qjgt?^qorv I Don_friable ACM that has become friable, (c)
Cateaorv I nonffiable ACM that will be or has been subjected to sanding, arindina, cutting, or abrading or (d) Cateaorv 11 nonffiable ACM that has a high
probability of becoming or has become crumbled, pulverized, or reduced to powder by the forces expected to act on the material in the course of
demolition or-reno`v'ation operations regulated by this regulaton. Notei Asbestos-containing-sheet vinyl and linoleum must-be-pTapedy-
abated/.rem®vedpriortodemdition.
5
Pitkin County Solid Waste Center
x
Madian Erwin
Digitally signed by Madian Erwin
DN: C=US, E=madian@shbuilt.com,
OU="SH Built ", CN=Madian Erwin
Date: 2022.07.25 15:23:55-06'00'
Madian ErwinMadian Erwin
Digitally signed by Madian Erwin
DN: C=US, E=madian@shbuilt.com, OU="SH Built ",
CN=Madian Erwin
Date: 2022.07.25 15:24:51-06'00'
60.00
By Cody Archuleta at 11:47 am, Jul 26, 2022
By Cody Archuleta at 11:47 am, Jul 26, 2022 X
191006186 / $60
By Cody Archuleta at 11:48 am, Jul 26, 2022