Loading...
HomeMy WebLinkAboutFile Documents.309 Oak Ln.0021-2022-BRES (34)SMOKE ALARMS AND CARBON MONOXIDE DETECTORS REQUIRED THROUGHOUT DWELLING UNIT PER CITY OF ASPEN MUNICIPAL CODE 8.15 These plans must be kept at the building site or inspection delays may occur. Construction shall conform to these plans. All changes shall be approved by the building official. Field Plan Set Must Be Printed In Color SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, MECHANICAL, OR FIRE SPRINKLER WORK It should be known that this review shall not relieve the applicant of their responsibility to comply with the requirements of the City of Aspen Municipal Code. Pursuant to Sec.26.104.050, any permit or approval issued in error or otherwise not in conformity with the requirements of this Title, shall be void. Similarly, any permit or approval issued in reliance upon or as a result of, a materially false statement or representation made in the process of obtaining the permit or development approval shall, likewise, be void. Any person having received a void or voidable permit or approval shall not be relieved from having to comply with all applicable terms and conditions of this Title and the City shall not be estopped from fully enforcing same. 11/08/2022 kylas 427 Rio Grande Place, Aspen, CO 81611 (970) 920.5090 www.aspen.gov NOTICE OF EXEMPTION AND AUTHORIZATION TO APPLY FOR LAND USE/BUILDING PERMITS DURING THE EFFECTIVE TERM OF ORDINANCE #27, SERIES OF 2021 Property Address: Parcel ID Number: Property Owner: Representative/email: Scope o f Work (Provide narrative here and a separate pdf which is a succinct and clear set of supporting documents, to be attached to this form as Exhibit A, such as Letters of Completeness, Resolutions, Development Orders, Land Use Case numbers, Building Permit numbers etc. If the representation being made is that the work does not involve dimensional changes prohibited by the moratorium provide existing and proposed calculations, floor Plans and and elevations to be attached: ___________________________________________________________________ ___________________________________________________________________ Due to the circumstances noted below, the above referenced project as defined by the Scope o f Work is exempt from the application of Ordinance #27, Series of 2021, and is authorized to pursue a land use review and/or building permit review during the effective term o f Ordinance #27, Series of 2021, an ordinance which generally places a moratorium on residential development. This authorization does not guarantee issuance of a building permit or approval of any land use application. The applicant must submit complete information and pursue all authorized approvals in a timely fashion, adhering to all deadlines for submission, terms of Vested Rights, response times required to maintain an active building permit, and all other Land Use Code and Building Code requirements in effect as of December 8, 2021. Any amendments and or additional approvals not addressed or identified in the application, may be subject to Ordinance #27, Series of 2021. The project described above is permitted to proceed with land use review because (check all that apply): New single-family home 309 Oak Lane Aspen, CO 81611 273707490309 Chris Campaigne taylor@shapearchitecturestudio.com 02/14/2022 □A land use application for a Development Order or Notice of Approval was submitted to the Community Development Department prior to final passage of the ordinance on December 8, 2021, and was subsequently deemed to be complete by the Community Development Department Director. □The land use application is seeking a Development Order or Notice of Approval for a project consisting of 100% Af fordable Housing as that term is defined at §26.104.100 of the Aspen Municipal Code, or as may be deemed necessary for the issuance of Certificates of Affordable Housing for a 100% Affordable Housing project, or as determined by the Community Development Director. □The land use application involves Voluntary AspenModern designation processes that meet the requirements of Section 26.415.025.C and 26.415.030. □The land use application or administrative request may be necessary to issue exempt building permits as described below, and as determined by the Community Development Director. The project described above is permitted to submit for building permit review bec ause (check all that apply ): □A building permit application was submitted to the Community Development Department prior to final passage of the ordinance on December 8, 2021, and was subsequently deemed to be complete by the Chief Building Official. □It is a building permit for a project that will not increase the gross square footage of development, Net leasable area, or Net livable area of any building and does not meet the definition of demolition. □It is a building permit for a project that will not increase the Height of any building. This includes additions to or replacement of mechanical equipment or energy eff iciency systems pursuant to height exemptions as set f orth at §26.575.020 of the Aspen Municipal Code, or as determined by the Community Development Director. □It is a building permit for commercial and lodge development as stand-alone uses on a parcel or property . □The project has received or is eligible to receive a Development Order or Notice of Approval on the effective date of this ordinance. □It is a building permit for 100% affordable housing projects as that term is defined at §26.104.100 of the Aspen Municipal Code. □It is a building permit for demolition or repair of non-habitable structures. Issued on ___________________, 20___, this certificate is valid through the effective date of Ordinance #27, Series of 2021, or any Ordinance which supersedes a provision of Ordinance #27, Series of 2021 in a manner which is relevant to the Scope of Work. A copy of this certificate is required when applying for any land use review or building permit. This Notice is not a Development Order or Administrative Determination that is subject to appeal. ______________________________ Phillip Supino Community Development Director Disclaimer: This ex emption is given based on the information provided by t he applicant. If changes are made, or the scope, after a more detailed review, is found to be subject to Ordinance 27, 2021, the exemption may be revoked. Exhibit A: Floor plans and elevations representing scope of work X X February 7 22 n 02/14/2022 0021-2022-BRES Campaigne 309 Oak Ln 273707490309 APPLICATION ACCEPTED DATE: 2022-02-18 PERMIT NUMBER: 0021-2022-BRES COMMUNITY DEVELOPMENT DEPARTMENT BUILDING PERMIT COVERSHEET PROPERTY INFORMATION ADDRESS : 309 OAK LN UNIT: PARCEL ID: 273707490309 LEGAL DESCRIPTION: SMUGGLER PARK OWNER : CAMPAIGNE CHRISTOPHER C & ELIZABETH E PERMIT CONTRACTOR : SH BUILDING GROUP LLC DESCRIPTION OF WORK Demolish existing home, and construction of a n ew single-family home in the same footprint. USE OF BUILDING Single Family FIRE SPRINKLER REQUIRED? No CLASS OF WORK Residential FIRE SPRINKLER TYPE BUILDING TYPE (IRC) One family REQUIRED SPECIAL INSPECTIONS Structural Steel Welding CONSTRUCTION TYPE VB ENERGY CODE COMPLIANCE Prescriptive Table OCCUPANCY GROUP (IBC) R -1 WORK CHANGES BUILDING FOOTPRINT? No CODE EDITIONS 2015 IRC TOTAL SPA SQ.FT. OTHER CODE EDITIONS 2015 International Energy Conservation Code 2015 International Plumbing Code 2015 International Mechanical Code 2015 International Fuel Gas Code 2015 International Fire Code 2020 National Electric Code TOTAL SNOWMELT SQ.FT. HISTORIC PROPERTY? No TOTAL POOL SQ.FT. FIRE SPRINKLER EXISTING? No j. Table R402.1.2 “Insulation and Insulation and Fenestration Requirements by Component” has been amended as follows: Fenestration U-Factor (b) Skylight U-Factor (b) Glazed Fenestration SHGC (b) (e) Ceiling R-Value Wood Frame Wall R-Value Mass Wall R-Value (i) Floor R-Value Basement Wall R-Value (c) Slab R-Value & Depth (d) Crawl- space Wall R-Value (c) 0.28 0.55 NR 49 20+5 or 13+10 (h) 19/21 38 (g) 15/19 10, 4ft 15/19 k. Table R402.1.4 “Equivalent U-Factors” has been amended as follows: Fenestration U-Factor Skylight U-Factor Ceiling U-Factor Frame Wall U- Factor Mass Wall U-Factor (b) Floor U-Factor Basement Wall U-Factor Crawl- space Wall U-Factor 0.28 0.55 0.026 0.045 0.057 0.028 0.050 0.055 Prescriptive Energy Requirements R-Value OR U-factor SPECIAL INSPECTION REQUIRED: -Structural steel welding: Field & Shop -High strength bolting -Epoxy anchors -Intumescent paint -Spray applied fire resistive materials -Permanent micropiles Special inspection is required per 2015 IBC section 1704. Inspector to verify that copy of agreement for inspection program to be on the job site prior to performing any inspections. A copy of all Special Inspector field reports to be on the job site for inspectors' review if requested. Failure to comply may result in denial of inspection. 11/29/2022 jimp External Energy Use Approved RREMP CREMP PERMIT #:_______________DATE:________ SNOWMELT:_____________________________ POOL: _____________________________ SPA: _____________________________ OFFSET:________________________________ REMP SHEET: __________________________ REVIEWED BY: _________________________ SNOWMELT SYSTEM AND EQUIPMENT MANDATORY REQ’S. All snowmelt systems shall meet the following: -Any portions in the Right of Way must be on a separate zone. A ROW permit and Permanent Encroachment License are required. -R10 insulation shall be installed under the area to be snow melted or R5 insulation shall be installed under and at the slab edges. (Ordinance 11 Series 2011) -Automatic controls installed for system shut off when pavement temperature is above 50°F and no precipitation is falling. (2009 IECC Sec. 403.8 & 503.2.4.5) -Automatic or manual controls installed for system shut off when outdoor temperature is above 40°F. (2009 IECC Sec. 403.8 & 503.2.4.5) -Inspection by testing hydrostatically at 1½ times max system design pressure, but not less than 100psi, for 15minutes. (2009 IMC Sec. 1208.1) MINIMUM BOILER AFUE: _________________ 0021-2022-BRES Jim Pomeroy 11/28/22 309 Oak Lane, Aspen Co 81611 0021-2022-BRES All soil is contaminated, therefore will be disposed at the landfill There will be no loose soil left at the property. New soil will be obtained for backfill 01/03/23 01/03/23 01/16/23 SPECIAL INSPECTION AND TESTING AGREEMENT This form is required for projects needing special inspection and/or testing per Chapter 17 of the International Building Code (IBC). Project Address: __________________________________ Permit Number: ______________________ BEFORE A PERMIT CAN BE ISSUED: The owner, or the design professional in responsible charge, acting as the owner’s agent, shall complete two copies of this agreement and the attached Special-inspection and Testing Schedule, including the required acknowledgments. A pre-construction conference with the parties involved may be required to review the special-inspection requirements and procedures. APPROVAL OF SPECIAL INSPECTORS: Special inspectors may have no financial interest in the projects for which they provide special inspections. Special inspectors shall be approved by the building department prior to performing any duties. Special inspectors shall submit their qualifications and are subject to personal interviews for pre-qualification. Special inspectors shall display approved identification, as stipulated by the building official, when performing the function of special inspector. Special inspection and testing shall meet the minimum requirements of the International Building Code Section 1704. The following conditions are also applicable: A. Special Inspector Responsibilities: 1. Signify presence at job site. Special inspectors should notify contractor personnel of their presence and responsibilities at the job site. If required by the building official, they shall sign in on the appropriate form posted with the building permit. 2. Observe assigned work. The special inspector shall observe assigned work for conformance with the building department approved (stamped) design drawings, specifications, and applicable workmanship provisions of the International Building Code. Architect\engineer-reviewed shop drawings may be used only as an aid to inspection. For continuous special-inspection, the special inspector shall be on site at all times observing the work requiring special inspection. Periodic inspections, if any, must have prior approval based on a separate written plan reviewed and approved by the building department and the engineer or architect of record. 3. Report nonconforming items. The special inspector shall bring nonconforming items to the immediate attention of the contractor and note all such items in the daily report. If any item is not resolved in a timely manner or is about to be incorporated in the work, the special inspector shall immediately notify the building department by telephone or in person, notify the engineer or architect, and post a discrepancy notice. 4. Provide timely reports. The special inspector shall complete written inspection reports for each inspection visit and provide the reports on a timely basis determined by the building official. The special inspector or inspection agency shall furnish these reports directly to the building official, engineer or architect of record, and others as designated. [IBC Sec. 1704.1.2] These reports should be organized on a daily format and may be submitted weekly at the option of the building official. These reports should include: a. Description of daily inspections and tests made with applicable locations, b. Listing of nonconforming items, c. Report on how nonconforming items were resolved or unresolved as applicable, d. Itemized changes authorized by the architect, engineer, and building official if not included in nonconforming items 5. Provide Final Inspection Report. The special inspector shall submit a written final report documenting required special inspections and correction of any discrepancies noted in the inspections prior to the final building inspection. 309 OakLane 0021-2022-BRES B. Owner Responsibilities: 1. The project owner, an agent of the owner, or the design professional in responsible charge acting as the owner’s agent, is responsible for employing special-inspection services. The special inspector/agency shall not be in the employ of the contractor, subcontractor or material supplier. [IBC Sec 1704.1] In case of an owner/contractor, the special inspector\agency shall be employed as specified by the building official. C. Design Professional in Responsible Charge Responsibilities: Design Professional in Responsible Charge definition: An individual who is registered or licensed to practice their respective design profession as defined by the statutory requirements of the professional registration laws of the state or jurisdiction in which the project is to be constructed; who is engaged by the owner to review and coordinate certain aspects of the project, as determined by the building official, for compatibility with the design of the building or structure. 1. Prepare statement of special inspections. The registered design professional in responsible charge shall prepare a statement of special inspections in accordance with IBC Section 1705 for submittal by the applicant. The statement of special inspections shall identify the following: a. The materials, systems, components and work required to have special inspection or testing by the building official or by the registered design professional responsible for each portion of the work. b. The type and extent of each special inspection. c. The type and extent of each test. d. For each type of special inspection, identification as to whether it will be continuous special inspection or periodic special inspection. D. Contractor Responsibilities: 1. Notify the special inspector. The contractor is responsible for notifying the special inspector or agency regarding individual inspections for items listed on the attached schedule and as noted on the building department approved plans. Adequate notice shall be provided so the special inspector has time to become familiar with the project. 2. Provide access to approved plans. The contractor is responsible for providing the special inspector access to approved plans. 3. Retain special inspection records. Upon request, the contractor is also responsible for retaining, at the job site, all special inspection records completed by the special inspector. E. Inspection of Fabricators: 1. Fabrication of structural assemblies and members. Where fabrication of structural load-bearing members and assemblies is being performed on the premises of a fabricator’s shop, IBC Section 1704.2 shall require special inspection of the fabricated items. 2. Fabrication and implementation procedures. The special inspector shall verify that the fabricator maintains detailed fabrication and quality control procedures that provide a basis for inspection control of the workmanship and the fabricator’s ability to conform to approved construction documents and reference standards. The special inspector shall review the procedures for completeness and adequacy relative to code requirements for fabricator’s scope of work. F. Approved Fabricator Responsibilities: 1. Fabrication exempt inspections. Special inspections are not required where work is done on the premise of a fabricator registered and approved to perform such work without special inspection. If work is done on site that requires special inspection, special inspection will be required. 2. Approval of fabricator. Approval shall be based upon review of the fabricator’s written procedural and quality control manuals and periodic auditing of fabrication practices by an approved special inspection agency. 3. Completion of fabrication. Upon completion of fabrication, the approved fabricator shall submit certificate of compliance to the building official stating that the work was performed in accordance with the approved construction documents. C°!°frarfupceE#thent andEnvironment DEMOLITION NOTIFICATION APPLICATION FORM AppLicATioN FEE MusT AccoMPAri¥ Tiits FORM INCOMPLETE APPLICATIONS WILL BE RETURNED (Notice will be mailed to the demolition contractor unless specified otherwise) Fee: $50 + $5 per 1000 ft2 of area to be demolished = S (See instniction #1 on reverse side) Submit form to: Pemit Coordinator Colorado Dept. of Public Health and Environment APCD-lE-B1 4300 Cherry Creek Drive South Denver, CO 80246-1530 Phone : 303J592€100 Fax: 303-782J)278 AsbestDs@stafe.co.us Ie Company`Natne:__I£as BtiiidingName: SH Built Canpalgre Residence Street:Square footage Of footpririt Of facility or portion of facilfty to be demolished 314 Aspen Business Ctr, Ste. 8 1,382 City: State: 81611 Street: 309 Oak Ln®9t:Aspen CO Teleohone # I Fax #City: I Pitkin cnty. I zio code:aaIa-(970) 923+ 122 (any@shbuilt.com ..i_a'=Aspen- I I 8161r Project Manager:Cell Phone #Proposed start Date Proposed completon Data hfudian Erwin (970) 309-0371 i5E 08/01 /2022 , 01 /30/3023 I cerrify that the Certified Asbestos Bu ilding Inspector has informed me Method/Means of Demolition:H\/\heckingIBumingtIlmplosien H Moving X Other, specify:a about any remaining asbestoscontaining materials in the facility to be a'a E®a demolished. Signature:Print Name: Madian Erwin NIOSH 7400 Landfill Receiving Building Debris:tBuming requires additional author[zation -Please call (303) 692-3100 and ask Yes to speak to the Open Burning Permit Coordinator-General Abatement Contractor (GAC)I®5 Ormer's Name:a>!iJ2&Quetzal Environlnental #468 Chris Campaigne CDPH E Asbestos permit # Total Quantity of Asbestos Removed Street: 309 Oak Ln. Cmly appr'ovar by 22gstfro'6'rviHjt Trevor S a)I5 Date Removal completed I Telephone #I Aspen CO I 61611 7/1 22 (303) 956-8586 Im' Type(s) of Asbestos-Containing Material Removed:Contact's Name: Telephone # ACM vinyl sheet Chris canpaigne (719) 293-0513 Ia `vi:rm ffiy si-giiatu`i`e b€tow, i ceiifty th.at i possess lit-Ti`€ift AHERA a-th+edifeaEit5'n~ arid sirate Of-C.6iorfide eefffiffiGati.en as an Asbestos Building lnsp ector. I also certify that I ha ve tho roughly inspected the facility to be demolished, as listed i;jn the Demolition Site bloc k above, sampled all suspect materials, had all samples analyzed for the presence of ®CL asbestos by a NVLAP-accredited laboratory, and have determined that no Regulated ACM exists anywhere in the0==facility.* I also certify that have informed the owner/operator of the facility or the demolition contractor that any co.9 asbestos-contain ing in ate rial allowed to stay in the facility must remain non-friable during demolition. Specify type(s) £ .¥ i Of ,cea,4 renainng, beky9,J: {Sfaeeek apprcp#ate be3±{es}}: ?5a'L='Ea't} I Vinyl asbestos floor tile (VAT) I VAT mastic I Tar/asphalt impregnated roofing I Asphaltic pipe coatings I Spray-applied tar coatings I Caulking I Glazing I Other, specfty:--------I---dif`:::::\\I{:I..:ft``{..---=-`_-==i_i€ .;a-. `+-ir--;a: (i.-,,.; Dat6°¥':aj&grfuTa°3Cirtc,#ci I 5X5ra.ti#.a5o ,2?3 i Telephone #( 9?Li `a?4/,--?/ 3q ; Ce" Ph°:e&?ca -366`3383 !j! I verify that all refrigerants from air conditioning/refrigeration applia nces have been properly recovered in accordance with AQCC Regulation No. 15 (for information on CFC requirements call 692-3100). I further verify that all luminous exit signs (containing radioactive material) have been disposed of in accordance with 6 CCR 1007-1 subpart 3.6.4.3 (for information on luminous exit sign requirements call 303€92-3320). CHECK THE APPROPRIATE BOX: I E] Buildingowner i E] Contractor i E] other i DateI signetwe:PeiRt` Name: THIS Box IS FOR CDPHE USE ONLy: PQs_t.m`a_rk o_r Ha_nd_ QeJ`ive_ry Da_t_e_: Asp.ro_ve_d_ fey.: i GQ¢.Q; E` injti`atral`Q E tr`ansf`er`-3ee Forrtt ofpaym-enr& # PeTmtt# I Re-c-orti# I Date ls"ed: * Regulated asbestos-containing materials means (a) friable asbest.o_s-.gontainLn.g.pr_aj§[ia|, (b) Qjgt?^qorv I Don_friable ACM that has become friable, (c) Cateaorv I nonffiable ACM that will be or has been subjected to sanding, arindina, cutting, or abrading or (d) Cateaorv 11 nonffiable ACM that has a high probability of becoming or has become crumbled, pulverized, or reduced to powder by the forces expected to act on the material in the course of demolition or-reno`v'ation operations regulated by this regulaton. Notei Asbestos-containing-sheet vinyl and linoleum must-be-pTapedy- abated/.rem®vedpriortodemdition. 5 Pitkin County Solid Waste Center x Madian Erwin Digitally signed by Madian Erwin DN: C=US, E=madian@shbuilt.com, OU="SH Built ", CN=Madian Erwin Date: 2022.07.25 15:23:55-06'00' Madian ErwinMadian Erwin Digitally signed by Madian Erwin DN: C=US, E=madian@shbuilt.com, OU="SH Built ", CN=Madian Erwin Date: 2022.07.25 15:24:51-06'00' 60.00 By Cody Archuleta at 11:47 am, Jul 26, 2022 By Cody Archuleta at 11:47 am, Jul 26, 2022 X 191006186 / $60 By Cody Archuleta at 11:48 am, Jul 26, 2022