Loading...
HomeMy WebLinkAboutFile Documents.134 E Bleeker St.0102-2020-BRES (48)The City of Aspen These plans must be kept at the building site or inspection delays may occur. Construction shall conform to these plans. All changes shall be approved by the building official. Field Plan Set Must Be Printed In Color SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, MECHANICAL, OR FIRE SPRINKLER WORK 04/12/2021 101 W 11th Street #109-C Durango, CO 81301 Ph: (970) 422-7676 386 Indian Road Grand Junction, CO 81501 Ph: (970) 241-8709 Bighorn Consulting engineers, co. February 17, 2021 Aspen Colorado Building Department This letter is in regards with the IECC requirements for the projects. Please accept this letter as a request for exemption from the ResCheck document normally required for a residential project. All construction in this project meets the prescriptive code requirements of the 2015 International Energy Conservation Code. The new roof will meet the prescriptive value of R-49 from Table 402.1.2. The new slab will have a value equal to (or better than) the R-10 factor listed in table 402.1.2. The new basement walls will have a value equal to (or better than) the R15/19 factor listed in table 402.1.2. See table for information The new walls will meet the prescriptive value of R-21 (R13 cavity insulation + R10 continuous insulation) from Table 402.1.2. The new windows will have a fenestration u-factor equal to (or better than) the 0.28 U-factor listed in table 402.1.2. For existing walls and ceilings, the existing framing should be filled with insulation per IECC. The new glass doors will have a fenestration u-factor equal to (or better than) the 0.28 factor listed in table 402.1.2. Copies of the windows and their specifications can be forwarded to you should you want to verify the values above. Please let us know if you require any further documentation or discussion regarding the above information and the contractor, architect and I will be happy to provide it for you. Sincerely, Johnathan VanVleet 03/26/2021 05/19/2021 bonniem External Energy Use Approved RREMP CREMP PERMIT #DATE SNOWMELT _____________________________ POOL _____________________________ SPA _____________________________ OFFSET:________________________________ REMP SHEET: ___________________________ REVIEWED BY: _________________________ 4 bonniem 5/19/20210102-2020-BRES 145 sqft 0 sqft 0 sqft M1-3, L0-03 SNOWMELT SYSTEM AND EQUIPMENT MANDATORY REQ’S. All snowmelt systems shall meet the following: -Any portions in the Right of Way must be on a separate zone. A ROW permit and Permanent Encroachment License are required. -R10 insulation shall be installed under the area to be snow melted or R5 insulation shall be installed under and at the slab edges. (Ordinance 11 Series 2011) -Automatic controls installed for system shut off when pavement temperature is above 50°F and no precipitation is falling. (2009 IECC Sec. 403.8 & 503.2.4.5) -Automatic or manual controls installed for system shut off when outdoor temperature is above 40°F. (2009 IECC Sec. 403.8 & 503.2.4.5) -Inspection by testing hydrostatically at 1½ times max system design pressure, but not less than 100psi, for 15minutes. (2009 IMC Sec. 1208.1) none SPECIAL INSPECTION REQUIRED: -Structural steel welding: Field & Shop -High strength bolting -Epoxy anchors Special inspection is required per 2015 IBC section 1704. Inspector to verify that copy of agreement for inspection program to be on the job site prior to performing any inspections. A copy of all Special Inspector field reports to be on the job site for inspectors' review if requested. Failure to comply may result in denial of inspection. 0102-2020-BRES 134 BLEEKER STREET FIRE SPRINKLERS REQUIRED SMOKE ALARMS AND CARBON MONOXIDE DETECTORS REQUIRED THROUGHOUT DWELLING UNIT PER CITY OF ASPEN MUNICIPAL CODE 8.15 SPECIAL INSPECTION AND TESTING AGREEMENT To permit applicants of project requiring special inspection and\or testing per Section 1704 of the International Building Code (IBC). Project Address: __________________________________ Permit Number:______________________ BEFORE A PERMIT CAN BE ISSUED: The owner, or the engineer or architect of record, acting as the owner’s agent, shall complete two copies of this agreement and the attached Special-inspection and Testing Schedule, including the required acknowledgments. A pre-construction conference with the parties involved may be required to review the special-inspection requirements and procedures. APPROVAL OF SPECIAL INSPECTORS: Special inspectors may have no financial interest in the projects for which they provide special inspections. Special inspectors shall be approved by the building department prior to performing any duties. Special inspectors shall submit their qualifications and are subject to personal interviews for pre-qualification. Special inspectors shall display approved identification, as stipulated by the building official, when performing the function of special inspector. Special inspection and testing shall meet the minimum requirements of the International Building Code Section 1704. The following conditions are also applicable: A. Duties and Responsibilities of the Special Inspector 1. Signify presence at job site. Special inspectors should notify contractor personnel of their presence and responsibilities at the job site. If required by the building official, they shall sign in on the appropriate form posted with the building permit. Observe assigned work. The special inspector shall observe assigned work for conformance with the building department approved (stamped) design drawings, specifications, and applicable workmanship provisions of the International Building Code. Architect\engineer-reviewed shop drawings may be used only as an aid to inspection. For continuous special-inspection, the special inspector shall be on site at all times observing the work requiring special inspection. Periodic inspections, if any, must have prior approval based on a separate written plan reviewed and approved by the building department and the engineer or architect of record. 3. Report nonconforming items. The special inspector shall bring nonconforming items to the immediate attention of the contractor and note all such items in the daily report. If any item is not resolved in a timely manner or is about to be incorporated in the work, the special inspector shall immediately notify the building department by telephone or in person, notify the engineer or architect, and post a discrepancy notice. Provide timely reports. The special inspector shall complete written inspection reports for each inspection visit and provide the reports on a timely basis determined by the building official. The special inspector or inspection agency shall furnish these reports directly to the building official, engineer or architect of record, and others as designated. [IBC Sec. 1704.1.2] These reports should be organized on a daily format and may be submitted weekly at the option of the building official. These reports should include: a. Description of daily inspections and tests made with applicable locations, b. Listing of nonconforming items, c. Report on how nonconforming items were resolved or unresolved as applicable, d. Itemized changes authorized by the architect, engineer, and building official if not included in nonconforming items. 2. 4. 1 134 E Bleeker St, Aspen, CO 81611 0102-2020-BRES 03/26/2021 5. Provide Final Inspection Report. The special inspector shall submit a written final report documenting required special inspections and correction of any discrepancies noted in the inspections prior to the final building inspection. B. Owner Responsibilities. The project owner, the engineer or architect or record, or an agent of the owner is responsible for employing special-inspection services. The special inspector\agency shall not be in the employ of the contractor, subcontractor or material supplier. [IBC Sec 1704.1] In case of an owner\contractor, the special inspector\agency shall be employed as specified by the building official. C. Engineer or Architect of Record Responsibilities 1. Prepare special inspection program. The engineer or architect of record shall list the items for which special inspection is required; and shall indicate any items for which the IBC or the building official approves periodic inspection and the frequency of such inspections. Respond to field discrepancies. The engineer or architect of record shall respond to uncorrected field discrepancies in design, material, or workmanship observed by the special inspector. Review shop drawings and submit design changes. The engineer or architect of record shall acknowledge and review for conformance with the construction drawings those shop drawings that may detail structural information, shall submit to the building official and to the special-inspection agency written documentation of any verbally authorized deviations from the approved construction documents, and shall submit revised documents for building official approval as required. 2. 3. D. Contractor Responsibilities 1. Notify the special inspector. The contractor is responsible for notifying the special inspector or agency regarding individual inspections for items listed on the attached schedule and as noted on the building department approved plans. Adequate notice shall be provided so the special inspector has time to become familiar with the project. Provide access to approved plans. The contractor is responsible for providing the special inspector access to approved plans. Retain special inspection records. Upon request, the contractor is also responsible for retaining, at the job site, all special inspection records completed by the special inspector. 2. 3. E. Inspection of Fabricators 1. Fabrication of structural assemblies and members. Where fabrication of structural load-bearing members and assemblies is being performed on the premises of a fabricator’s shop, IBC Section 1704.2 shall require special inspection of the fabricated items. Fabrication and implementation procedures. The special inspector shall verify that the fabricator maintains detailed fabrication and quality control procedures that provide a basis for inspection control of the workmanship and the fabricator’s ability to conform to approved construction documents and reference standards. The special inspector shall review the procedures for completeness and adequacy relative to code requirements for fabricator’s scope of work. 2. F. Approved Fabricator Responsibilities 1. Fabrication exempt inspections. Special inspections are not required where work is done on the premise of a fabricator registered and approved to perform such work without special inspection. 2 03/26/2021 2. Approval of fabricator. Approval shall be based upon review of the fabricator’s written procedural and quality control manuals and periodic auditing of fabrication practices by an approved special inspection agency. Completion of fabrication. Upon completion of fabrication, the approved fabricator shall submit certificate of compliance to the building official stating that the work was performed in accordance with the approved construction documents. 3. G. Building Department Responsibilities 1. Approve special-inspection program. The building department shall approve all special inspectors and special-inspection requirements. Enforce special inspection. Work requiring special inspection and the building inspector shall monitor the performance of special inspectors. His\Her approval, in addition to that of the special inspector, must be obtained prior to placement of concrete, covering of structural steel, or other similar materials. Review inspection reports. The building official should review special-inspection progress and final reports. Perform final inspection. The building official should perform the final inspection and approval for a project [IBC Sec. 109.3.1] after the final special-inspection report has been reviewed and approved. 2. 3. 4. Project Address: __________________________________ Permit Number:______________________ ACKNOWLEDGMENTS I have read and agree to comply with the conditions of this agreement. Special Inspection Agency: __________________________ Owner: __________________________ Engineer/ Architect: __________________________ Contractor: __________________________ Approved Fabricator: __________________________ Inspected Fabricator: __________________________ (circle one) CITY OF ASPEN PITKIN COUNTY: Signature: __________________________ Signature: __________________________ Signature: __________________________ Signature: __________________________ Signature: __________________________ Signature: __________________________ Signature: __________________________ 3 Printed Name: __________________________ Printed Name __________________________ Printed Name: __________________________ Printed Name: __________________________ Printed Name: __________________________ Printed Name: __________________________ Printed Name: __________________________ Date: __________________________ Date __________________________ Date: __________________________ Date: __________________________ Date: __________________________ Date: __________________________ Date: __________________________ KL&A, Inc.Brett McElvain, P.E.02/08/21 134 E Bleeker St, Aspen, CO 81611 0102-2020-BRES 03/26/2021 Bonnie Muhigirwa 11/8/21