HomeMy WebLinkAboutFile Documents.334 McSkimming Rd.0073-2020-BRES (33)The City of Aspen
These plans must be kept at the
building site or inspection
delays may occur. Construction
shall conform to these plans. All
changes shall be approved by
the building official.
Field Plan Set Must Be Printed In Color
SEPARATE PERMITS ARE
REQUIRED FOR ELECTRICAL,
PLUMBING, MECHANICAL, OR
FIRE SPRINKLER WORK
06/01/2021
ALL OUTDOOR LIGHTING
MUST COMPLY WITH
THE CITY OF ASPEN LIGHTING CODE
SECTION 26.575.150
REFERENCES FROM 2015 IRC
CV/A = crawl space ventilation required, sec. R408.1 Access required, R408.4
EE = emergency escape required sec R310.1
EU = enclosed usable space under stairs shall be ½” Gyp, sec R302.7
G/D = garage/dwelling separation, sec R302.5 and R302.6
STC = Sound transmission class not less than 45 at dwelling separations, app
K
RV = roof and rafter ventilation required, R806.1
A = attic access 22” x 30”, 30” headroom above, R807.1
SA = smoke alarms installed to NFPA 72 requirements, sec R314
CO = carbon monoxide detector per City Ordinance 41 series 2008
SG = safety glazing required, sec R308.4
GR = guardrails, 36” min ht, 4” max opening; req at 30” drop any point w/in 36”
horizontally, sec R312
WFP = window fall protection- operable window <24” AFF & >72” above
grade: use opening control device listed to ASTM F2090, sec R312.2
HR = handrails 34”-38” ht, sec R311.7.8
SI = stairway illumination, sec R303.7
PD = protect against decay, sec R317
REFERENCES FROM 2015 IMC
V = bathroom and balanced whole house mechanical ventilation req.
Ordinance 40, 2016
DE = clothes dryer exhaust, sec 504. Makeup air req’d if over 200 CFM
AS = access and service space for maintenance req’d, sec 306
MA = make up air required if hood exhausts greater than 400 CFM, sec 505.2
ET = exhausts terminate 3’ from prop line and openings, 10’ from intakes,
501.3.1
IT= intake openings 10’ from lot line & contaminant sources (vents, streets),
401.4
D = fasten and seal all ductwork per 603.9
REFERENCES FROM 2015 IFGC
DV = direct vent req’d, sec 303.3
CA = combustion air not taken from bedrooms, bathrooms or
storage sec 303.3
OD = outdoor appliances must be listed for outdoor use, sec 303.6
REFERENCES FROM 2015 IECC
F = new or replacement glazing shall not exceed 0.28 U-Value, NFRC label
required, Ordinance 40, 2016
L = 75% of lamps in permanently installed lights must be high efficacy, sec
R404.1
SE = Continuous air barrier required; all exterior joints, cracks, and holes to be
caulked, gasketed, sealed, table R402.4.1.1
REFERENCES FROM 2014 NEC
EP = electric panel 'happy space' 30"x36"x78", not in storage, sec 110.26
External Energy Use Approved
RREMP CREMP
PERMIT #:_______________DATE:________
SNOWMELT:_____________________________
POOL: _____________________________
SPA: _____________________________
OFFSET:________________________________
REMP SHEET: __________________________
REVIEWED BY: _________________________
SNOWMELT SYSTEM AND EQUIPMENT MANDATORY REQ’S.
All snowmelt systems shall meet the following:
-Any portions in the Right of Way must be on a separate zone. A ROW
permit and Permanent Encroachment License are required.
-R10 insulation shall be installed under the area to be snow melted or R5
insulation shall be installed under and at the slab edges. (Ordinance 11
Series 2011)
-Automatic controls installed for system shut off when pavement
temperature is above 50°F and no precipitation is falling. (2009 IECC
Sec. 403.8 & 503.2.4.5)
-Automatic or manual controls installed for system shut off when outdoor
temperature is above 40°F. (2009 IECC Sec. 403.8 & 503.2.4.5)
-Inspection by testing hydrostatically at 1½ times max system design
pressure, but not less than 100psi, for 15minutes. (2009 IMC Sec.
1208.1)
MINIMUM BOILER AFUE: _________________
FIRE
SPRINKLERS
REQUIRED
FIRE
SPRINKLERS
REQUIRED
SMOKE ALARMS AND
CARBON MONOXIDE
DETECTORS REQUIRED
THROUGHOUT DWELLING
UNIT PER CITY OF ASPEN
MUNICIPAL CODE 8.15
SPECIAL INSPECTION REQUIRED:
-Structural steel welding: Field & Shop
-High strength bolting
-Epoxy anchors
-Intumescent paint
-Spray applied fire resistive materials
-Permanent micropiles
Special inspection is required per 2015 IBC
section 1704. Inspector to verify that copy of
agreement for inspection program to be on
the job site prior to performing any
inspections. A copy of all Special Inspector
field reports to be on the job site for
inspectors' review if requested. Failure to
comply may result in denial of inspection.
1313 sq ft
2.5 kw PV
CCC dam
8/20/210073-2020-BRES
95% AFUE
A.01
07/27/2021
denism
175070080
334 Road
SFRD
09-04-2021
By Trevor Strosnider at 1:02 pm, Sep 16, 2021
Approved by:
By Trevor Strosnider at 1:02 pm, Sep 16, 2021
Approved by:
By Trevor Strosnider at 1:03 pm, Sep 16, 2021
09/20/2021
0073-2020-BRES
HAMPLEMAN MARGOT
334 MCSKIMMING RD
273718103002
See Change Order
0079-2022-BCHO for updated
REMP info
These plans must be kept at the
building site or inspection
delays may occur. Construction
shall conform to these plans. All
changes shall be approved by
the building official.
Field Plan Set Must Be Printed In Color
SEPARATE PERMITS ARE
REQUIRED FOR ELECTRICAL,
PLUMBING, MECHANICAL, OR
FIRE SPRINKLER WORK
2.Approval of fabricator. Approval shall be based upon review of the fabricator's written
procedural and quality control manuals and periodic auditing of fabrication practices byan approved special inspection agency.
3.Completion of fabricadon. Upon completion offabricotion, the approved fabricatorshall submit certificate of compliance to the building official stating that the work was
performed in accordance with the approved construction documents.
G.Building Department Responsibilities
1.Approve special-inspection program. The building department shaU approve all
special inspectors and special-inspection requirements.
2.Enforce special inspection. Work requiring special inspection and the building
inspector shall monitor the performance of special inspectors. His\Her approval, inaddition to that of the special inspector, must be obtained prior to placement of concrete,
covering of structural steel, or other similar materials.
3.Review inspection reports. The building official should review special-inspection
progress and final reports.
4.Perform final inspection. The building official should perform the final inspection and
approval for a project [IBC Sec. 109.3.1) after the final special-inspection report has beenreviewed and approved.
ProjectAddress: .. ::/oLj r-.,\(..E)\,l.ltv\.MIN7. RD. Permit Number: ________ _
ACKNOWLEDGMENTS
r have rend and agree to comply with the conditions of this agreement.
*Design Professional in
Responsible Charge:
R.•A· H:rfl\l\ft.f.MPOJ
Contractor: Signaturc
a,�
rinted Name:
�t.JI:. Situtru��,..1..,1)� f,2.A{J.01<0Approved Fabricator: Signature: Pnnted Name: '"
0Iru.-pected Fabricator:
�r, MM.j,c, kJed?lrl�
City of Aspen Building .
Department:
Signature: e:
7124:, P,,Yi(QS lPrinted Name:
•Either the Owner or Design Professional in Responsible Charge mL>St sign.
Date:
Date:
Date:
Email:
Email:
Email:
Email:
Email:
•• Either the Appr<>ved Fabricator or Inspected Fabricator musl sign. If a·Tlll-:-w-:,o-,-,k,.,.,.,.., -----,.,pe""rf"""orm=ea.,..,.,,1n the shop of an Approved Fabricator, the Special
lru;pec;rion Agency signatUie is nol required (no field work). 3
Denis Murray 8/19/21 denis.murray@cityofaspen.com
08/19/2021
SPECIAL INSPECTION AND TESTING AGREEMENT
To permit applicants of project requiring special inspection and\or testing per Section 1704 of the
International Building Code (IBC).
Project Address: __________________________________ Permit Number:______________________
BEFORE A PERMIT CAN BE ISSUED: The owner, or the design professional in responsible charge,
acting as the owner’s agent, shall complete two copies of this agreement and the attached Special-
inspection and Testing Schedule, including the required acknowledgments. A pre-construction conference
with the parties involved may be required to review the special-inspection requirements and procedures.
APPROVAL OF SPECIAL INSPECTORS: Special inspectors may have no financial interest in the
projects for which they provide special inspections. Special inspectors shall be approved by the building
department prior to performing any duties. Special inspectors shall submit their qualifications and are
subject to personal interviews for pre-qualification. Special inspectors shall display approved
identification, as stipulated by the building official, when performing the function of special inspector.
Special inspection and testing shall meet the minimum requirements of the International Building Code
Section 1704. The following conditions are also applicable:
A. Duties and Responsibilities of the Special Inspector
1.Signify presence at job site. Special inspectors should notify contractor personnel of
their presence and responsibilities at the job site. If required by the building official, they
shall sign in on the appropriate form posted with the building permit.
Observe assigned work. The special inspector shall observe assigned work for
conformance with the building department approved (stamped) design drawings,
specifications, and applicable workmanship provisions of the International Building
Code. Architect\engineer-reviewed shop drawings may be used only as an aid to
inspection.
For continuous special-inspection, the special inspector shall be on site at all times
observing the work requiring special inspection. Periodic inspections, if any, must have
prior approval based on a separate written plan reviewed and approved by the building
department and the engineer or architect of record.
3.Report nonconforming items. The special inspector shall bring nonconforming items to
the immediate attention of the contractor and note all such items in the daily report. If
any item is not resolved in a timely manner or is about to be incorporated in the work, the
special inspector shall immediately notify the building department by telephone or in
person, notify the engineer or architect, and post a discrepancy notice.
Provide timely reports. The special inspector shall complete written inspection reports
for each inspection visit and provide the reports on a timely basis determined by the
building official. The special inspector or inspection agency shall furnish these reports
directly to the building official, engineer or architect of record, and others as designated.
[IBC Sec. 1704.1.2] These reports should be organized on a daily format and may be
submitted weekly at the option of the building official. These reports should include:
a.Description of daily inspections and tests made with applicable locations,
b. Listing of nonconforming items,
c.Report on how nonconforming items were resolved or unresolved as
applicable,
d.Itemized changes authorized by the architect, engineer, and building official if
not included in nonconforming items.
2.
4.
1
334 McSkimming Road 0073.2020.BRES
08/19/2021
5. Provide Final Inspection Report. The special inspector shall submit a written final
report documenting required special inspections and correction of any discrepancies
noted in the inspections prior to the final building inspection.
B. Owner Responsibilities. The project owner, the design professional in responsible charge, or an agent of
the owner is responsible for employing special-inspection services. The special inspector/agency
shall not be in the employ of the contractor, subcontractor or material supplier. [IBC Sec 1704.1] In
case of an owner\contractor, the special inspector\agency shall be employed as specified by the
building official.
Design Professional in Responsible Charge definition: An individual who is registered or licensed to practice their
respective design profession as defined by the statutory requirements of the professional registration laws of the
state or jurisdiction in which the project is to be constructed; who is engaged by the owner to review and coordinate
certain aspects of the project, as determined by the building official, for compatibility with the design of the building
or structure.
C. Design Professional in Responsible Charge Responsibilities
1. Prepare statement of special inspections. The registered design professional in responsible
charge shall prepare a statement of special inspections in accordance with IBC Section 1705
for submittal by the applicant. The statement of special inspections shall identify the
following:
1. The materials, systems, components and work required to have special inspection or
testing by the building official or by the registered design professional responsible for
each portion of the work.
2. The type and extent of each special inspection.
3. The type and extent of each test.
4. For each type of special inspection, identification as to whether it will be continuous
special inspection or periodic special inspection.
D. Contractor Responsibilities
1. Notify the special inspector. The contractor is responsible for notifying the special
inspector or agency regarding individual inspections for items listed on the attached
schedule and as noted on the building department approved plans. Adequate notice shall
be provided so the special inspector has time to become familiar with the project.
Provide access to approved plans. The contractor is responsible for providing the
special inspector access to approved plans.
Retain special inspection records. Upon request, the contractor is also responsible for
retaining, at the job site, all special inspection records completed by the special inspector.
2.
3.
E. Inspection of Fabricators
1. Fabrication of structural assemblies and members. Where fabrication of structural
load-bearing members and assemblies is being performed on the premises of a
fabricator’s shop, IBC Section 1704.2 shall require special inspection of the fabricated
items.
Fabrication and implementation procedures. The special inspector shall verify that
the fabricator maintains detailed fabrication and quality control procedures that provide a
basis for inspection control of the workmanship and the fabricator’s ability to conform to
approved construction documents and reference standards. The special inspector shall
review the procedures for completeness and adequacy relative to code requirements for
fabricator’s scope of work.
2.
F. Approved Fabricator Responsibilities
1. Fabrication exempt inspections. Special inspections are not required where work is
done on the premise of a fabricator registered and approved to perform such work
without special inspection. If work is done on site that requires special inspection, special
inspection will be required.