Loading...
HomeMy WebLinkAboutFile Documents.366 Pfister Dr.0048-2021-BRES (11)The City of Aspen These plans must be kept at the building site or inspection delays may occur. Construction shall conform to these plans. All changes shall be approved by the building official. Field Plan Set Must Be Printed In Color SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, MECHANICAL, OR FIRE SPRINKLER WORK 06/04/2021 28085 03/24/2021 03/25/2021 External Energy Use Approved RREMP CREMP PERMIT #:_______________DATE:________ SNOWMELT:_____________________________ POOL: _____________________________ SPA: _____________________________ OFFSET:________________________________ REMP SHEET: __________________________ REVIEWED BY: _________________________ SNOWMELT SYSTEM AND EQUIPMENT MANDATORY REQ’S. All snowmelt systems shall meet the following: -Any portions in the Right of Way must be on a separate zone. A ROW permit and Permanent Encroachment License are required. -R10 insulation shall be installed under the area to be snow melted or R5 insulation shall be installed under and at the slab edges. (Ordinance 11 Series 2011) -Automatic controls installed for system shut off when pavement temperature is above 50°F and no precipitation is falling. (2009 IECC Sec. 403.8 & 503.2.4.5) -Automatic or manual controls installed for system shut off when outdoor temperature is above 40°F. (2009 IECC Sec. 403.8 & 503.2.4.5) -Inspection by testing hydrostatically at 1½ times max system design pressure, but not less than 100psi, for 15minutes. (2009 IMC Sec. 1208.1) MINIMUM BOILER AFUE: _________________ X 0048-2021-BRES 8.25.21 494 SQ.FT. HYDRONIC G-001 98% NONE JH 08/25/2021 justinh 0048-2021-BRES COVENANT ASPEN LLC 366 PFISTER DR 273511309039 SNOWMELT SYSTEM AND EQUIPMENT MANDATORY REQ'S All snowmelt systems shall meet the following: - Any portions in the Right of Way must be on a separate zone. A ROW permit and Permanent Encroachment License are required. - R10 insulation shall be installed under the area to be snowmelted or R5 insulation shall be installed under the slab edges. (Ordinance 11 Series 2011) - Automatic controls installed for system shut off when pavement temperature is above 50°F and no precipitation is falling. (2015 IECC R403.9 and C403.2.4.5) - Automatic or manual controls installed for system shut off when outdoor temperature is above 40°F. (2015 IECC R403.9 and C403.2.3.5) - Inspection by testing hydrostatically at 1.5 times max system design pressure, but not less than 100psi, for 15 minutes. (2015 IMC 1208.1) FIRE SPRINKLERS REQUIRED SMOKE ALARMS AND CARBON MONOXIDE DETECTORS REQUIRED THROUGHOUT DWELLING UNIT PER CITY OF ASPEN MUNICIPAL CODE 8.15 Recessed luminaires installed in building thermal envelope shall be sealed and IC-rated – IECC sec R402.4.5 Any recessed light fixtures in contact with insulation must be IC rated. 494 494