HomeMy WebLinkAboutFile Documents.1213 Alta Vista Dr.0042-2022-BRES (11)SK PEIGHTAL ENGINEERS Ltd
STRUCTURAL CONSULTANTS
21085 FR 2022-10-20
PO Box 410 • Basalt, Colorado • 81621 • 970.927.9510 • skpe.structural@gmail.com
www.skpeightalengineers.com
TO x Peak 3 Construction
ATTN x Dan Bosko dan@peak3aspen.com
FROM x Adrienne Prosser, PE
DATE x 20 October 2022
PROJECT x Remodel 1213 Alta Vista
PROJECT No .x 21085
Those Present Dan Bosko, Peak 3 Construction
Joel Harries, Galambos Architects
Adrienne Prosser, SK Peightal Engineers
On site 13 October 2022, to review framing progress and assess in-place framing conditions. Observed
construction appeared to be in general conformance of the construction documents with the exception of the
following which were discussed while on site:
Item 1: The decision was made (by others) to not alter the roof framing or bearing wall location at the kitchen.
Therefore, these conditions are considered as existing and historic load path is maintained without the need to
revise rafter or ridge member sizes.
Item 2: The entry way floor had been reframed. The entry floor was framed such that it is bearing on the existing
floor slab and the existing foundation wall. Photos were provided to illustrate the framing process. The work
appeared to be acceptable.
Item 3: The stairway had been reframed in its existing configuration and location. The new stair was wood
framed and mostly available to view while on site. Framing appeared to be acceptable.
Item 4: The builder requested an alternate connection between the wood column to wood beam at the exterior
entry porch as indicated in Detail 2/S531. This connection may be achieved using Simpson APA6 each side of
column or Simpson APT6 each side of beam.
Item 5: The builder requested an option to use a big foot pier and footing system as opposed to the two-pour
footing and pier system indicated on the structural drawings. This is acceptable using a 24” diameter big foot and
10” tube. Provide reinforcement per Detail 1/S531.
Item 6: The base of the wood column at the exterior entry porch may be attached to the pier per attached
Clarification C2.1.
cc: Joel Harries jharries@galambosarchitects.net
The above represents our report of events noted and items discussed and will be relied upon as true and correct
by all parties unless notified within (5) working days of receipt.
FIELD REPORT
25 Oct '22
11/10/2022
11/10/2022
justinh