Loading...
HomeMy WebLinkAboutSub Permit.100 E Main St.0031-2022-BCOM (4)Close Window Print This Page Expand All | Collapse All 0137-2022-UTWC Number 0137-2022-UTWC Record Type Utility Water Connection 100 E MAIN ST 4 Owner Robert Gregor Original Number 22-2956 Status Closed - Final Type Utility Water Connection Reason for Cancel or Compl. Review Fail Applicant Jessica Yeh No Butler Armsden Architects Imported Project HPC-ZON-EH-UTIL Review Permit Contractor Eng Review Yes Parks-Prkng-San Review Master Building Permit 0031-2022-BCOM Conditional Inspections Conditional Final Insp Supplemental/Addendum Master Permit Action Items 2022 Hold Reason Permit Dates 12/8/2022 Expiration Date 12/15/2022 12/15/2022 3/20/2023 0 95 Milestone Current Days in City Hands 81 Close/CO Issuance Date 12/18/2023 Job Location Address 100 E MAIN ST 4, ASPEN : 273512401207 Lot Site Address Display on Map Block Historic Property?No Legal Description Subdivision: 100 EAST MAIN STREET CONDO Unit: 4 Historic District?Yes Zone District MU Property Information Common Building Name Already on City Water?Yes Public Building?Yes Class of Service Customer Mixed-Use In a Park?No 01-20018870-00 Other Use Water Service Area 1 Inside City Boundaries? Project Information Use of Building Mixed-Use 1.00 Use Class Commercial 1.00 Class of Work Addition 2.00 0.00 Number of Meters Proposed 1 Description Interior remodel for a small one person occupied private office, including a bathroom with shower, adding a new gas insert to the existing fireplace, kitchenette, radiant floor, and mini-split for heating and cooling. CO Description Raw Water Information Existing toilet and bathroom sink.Is There Well or Wells on the Property? Does Project Involve Outdoor Irrigation? No 0 Address Aspen Internal? Account Is This Associated w/a Building Permit? Is this an Addendum Permit? Hold All Reviews Price Book New Application Date Application Complete Date Override Expiration Date Application Accepted Date Last Activity Date Issue Date Milestone Current Days in Applicant Hand Days to Issue Eden Address Utility Account Number Size of Existing Domestic Water Line Size of Proposed Domestic Water Line Size of Existing Fire Suppression Line If Residential App, Estimated New ECUs Size of Proposed Fire Suppression Line Identify ALL Sources of Water Acre-feet of Water Currently by Well 3/10/25, 2:49 PM 0137-2022-UTWC ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a038X000028i3suQAA/p 1/4 Irrigated Area Sq Ft 0 0 City of Aspen Is There a Pool, Spa or Water Feature? No Water Service Requests New Tap?Yes Abandon Existing Tap No Existing Tap Modifications?Yes Abandon Existing Well No Internal Use Only Existing ECU Count Utility Investment Charge (Tap Fees) Final ECU Count Utility Investment Charge Paid Date of Existing Tap Date of New Tap Utility Hookup Charge Paid CO Status if Applicable Date of CO Cash in Lieu Paid CO Approved Date Well Development Charges Date of Final Connection Fee Payment Well Development Charges Paid Water Service Agreement Required? Summary of Prior Water Fees Paid Status of Final Agreement Financials Total Payments Fees Paid Total Balance $0.00 System Information Created By Jessica Yeh, 9/6/2022 2:32 PM Last Modified By Aspen Avocette, 9/28/2024 1:54 AM Number 0137-2022-UTWC VIP Form Tool VIP Foreign Language VIP Form Template Permit Application VIP Submitted 12/8/2022 11:57 AM VIP Template Status [{"parentCategoryId":null,"isSubmit":null,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryId":"a2E6A000000UwvPUAS"}, {"parentCategoryId":null,"isSubmit":null,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryId":"a2E6A000000UwvNUAS"}, {"parentCategoryId":"a2E6A000000UwvhUAC","isSubmit":null,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryId":"a2E6A000000Uwvd {"parentCategoryId":null,"isSubmit":null,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryId":"a2E6A000000UwvaUAC"}, {"parentCategoryId":null,"isSubmit":null,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryId":"a2E6A000000UwvZUAS"}, {"parentCategoryId":null,"isSubmit":true,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryId":"a2E6A000000Ux1dUAC"}, {"parentCategoryId":"a2E6A000000UwvaUAC","isSubmit":null,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryId":"a2E6A000000UxFO Action Items View/Print Permit Link Attachment Activity History Email: Utility Connection Permit Final Type Billable Assigned To Tim Rohe Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 12/15/2023 Days in Applicant's Hands Comments To: jessicayeh@butlerarmsden.com CC: BCC: Attachment: 100 E main unit 4 Final UCP-Signed.pdf Subject: Utility Connection Permit Final Body: Hello Jessica Yeh, Attached is your final Utility Connection Permit for the completed project at 100 E MAIN ST 4 associated with permit #: 0137-2022-UTWC. After review, please print, have signed by owner, and notarized. Once signed and notarized, please return UCP with payment, if applicable, to the Finance Department window located on the second floor of City Hall at 427 Rio Grande Place. Alternatively, you may upload the signed and notarized copy of the UCP as a SCANNED (not photographed) .pdf file and pay all fees due via Salesforce, but if submitting via Salesforce, please send a chatter to @Robert Gregor and @Cole Langford on the permit record once the document is uploaded and all fees are paid to serve as a “push” notification that these permit requirements are complete. Please reach out with any questions or concerns. Acre-feet of Water Rights to be Conveyed Indicate Amt, Source, and Use of Water Do Water Feat use Recirc/Recycled Water? Utility Hookup Charge Cash in Lieu Total Fees 3/10/25, 2:49 PM 0137-2022-UTWC ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a038X000028i3suQAA/p 2/4 Email: Utility Connection Permit Review Type Billable Assigned To Tim Rohe Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 3/6/2023 Days in Applicant's Hands Comments To: jessicayeh@butlerarmsden.com CC: BCC: Attachment: 100 E main unit 4 Review UCP-Signed.pdf Subject: Utility Connection Permit Review Body: Hello Jessica Yeh, Attached is your review Utility Connection Permit for the proposed project at100 E MAIN ST 4 associated with permit #: 0137-2022-UTWC After review, please print, have signed by owner, and notarized. Once signed and notarized, please return UCP with payment, if applicable, to the Finance Department window located on the second floor of City Hall at 427 Rio Grande Pl. Alternatively, you may upload the signed and notarized copy of the UCP as a SCANNED (not photographed) .pdf file and pay all fees due via Salesforce, but if submitting via Salesforce, please send a chatter to @Robert Gregor and @Cole Langford on the permit record once the document is uploaded and all fees are paid to serve as a “push” notification that these permit requirements are complete. Please reach out with any questions or concerns. Contacts Jessica Yeh Account Butler Armsden Architects Type Applicant Active Contractor License Count 0.00 Number 0050549 Account Type Architect or Engineer of Record Active Contractor License Count 0.00 Number 0050550 Account Type Owner Active Contractor License Count 0.00 Number 0050551 Files UCP (Fin) - FE, No Fees - 100 E Main #4 Last Modified 12/18/2023 8:45 AM Created By Robert Gregor UCP (Rev) - FE, No Fees Due - 100 E Main Unit 4 Last Modified 3/20/2023 1:45 PM Created By Robert Gregor UCP_Permit_Insubstantial_Review__20230306.docx Last Modified 3/6/2023 9:38 AM Created By Tim Rohe 100 E main unit 4 Final UCP-Signed Last Modified 12/15/2023 3:34 PM Created By Tim Rohe 100 E main unit 4 Review UCP-Signed Last Modified 3/6/2023 9:51 AM Created By Tim Rohe Permit Application 2022-12-08 18:57:10.pdf Last Modified 12/8/2022 11:57 AM Created By Jessica Yeh Milestones Review Round 1 - 0137-2022-UTWC Status Approved Due Date Created Date 12/15/2022 Permit History 12/18/2023 8:51 AM User Robert Gregor Action Changed Status from Ready for Closure to Closed - Final. 12/18/2023 8:51 AM User Robert Gregor Action Changed Status from Issued to Ready for Closure. Reviews REV-027883 Milestone Review Round 1 - 0137-2022-UTWC Status Approved Type Engineering Water Due Date Completed Date 3/6/2023 9:51 AM Owner Alias TRohe On Hold Created Date 12/15/2022 3/10/25, 2:49 PM 0137-2022-UTWC ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a038X000028i3suQAA/p 3/4 Submissions 230320_100 E main unit 4 Review UCP-signed.pdf Actions Submission Date 3/22/2023 10:00 AM Status Required Description Commercial ECU Calculator 2020.xlsx Actions Submission Date 12/8/2022 11:55 AM Status Required Description 231215_100 E MainUCP_Signed.pdf Actions Submission Date 12/15/2023 5:32 PM Status Required Description Copyright © 2000-2025 salesforce.com, inc. All rights reserved. 3/10/25, 2:49 PM 0137-2022-UTWC ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a038X000028i3suQAA/p 4/4