Loading...
HomeMy WebLinkAboutFile Documents.33 MINING STOCK PKWY.0093-2020-BRES (3)RG 21B RG 28B RG 17B RG 22B RG 23BRG 24B RG 16B P14 P11 E11 FF2=7838.90 FF1=7828.00 E15 FF2=7832.40 FF1=7821.50 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA S S S S S S SS SS SS SS SS ETC ETC ETC ETC ETC ET C PDS PDS PDS PDS SS 9 9 VA N AC C E S S I B L E 4 VA N AC C E S S I B L E 8 6 >>> > P11-09 P11-10 P11-11 P11-12 P11-13 P11-14 P11-01 911-02 P11-03 P11-04 P11-05 P11-06 P11-07 P11-08 P14-10 P14-11 P14-12 P14-13 P14-14 P14-15 P14-16 P14-17 P14-7 EV PARKING P14-8 EV ACCESSIBLEP14-6 P14-5 P14-4P14-3 P14-9 U E UE E T C E T C E T C E T C ET C > >>>> ETC ETC ETC ETC ETC ETC RG 20B RG 1B STBK STBK STBK ST B K S T B K S T B K S T B K S T B K S T B K STBK STBK STBK STBK STBK STBK STBK STB K ST B K STB K STB K U E UE UE UE U E U E UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE ET C E T C E T C 4 ' ' W 4' ' W 4'' W 4'' W 4'' W 4'' W 4'' W 4'' W 8''SS 8''SS 8''SS > > > P14 P11 E11 FF2=7838.90 FF1=7828.00 E15 FF2=7832.40 FF1=7821.50 XSD XSD XSD XSD XSD XS D XS D X S D X S D X S D X S D X S D X S D XSD XSD XSD XSD XSD XSD X S D X S D X S A X S A X S A X S A X S A XSA XSA XS A XS A XSA XSA XS A X W L X W L X W L X W L X W L X W L XW L XW L X H C E X H C E XHCE XHCE X H C E X H C E X H C E X H C E X H C E XH C E XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS XGAS X G A S X G A S XG A S XG A S XE L X E L X E L X E L X E L X E L X E L X E L X E L XE L XE L XETC XETC XETC XETC XE L XE L XE L XE L XG A S XG A S XG A S XG A S XG A S XG A S X G A S X G A S X G A S X G A S X G A S X G A S X G A S X G A S XTC X T C X T C X T C X T C X T C X T C X T C X T C XT C XT C X T C X T C XT C XT C w w w w w w w w w w w w w EE EE ETV ETV ETV ETV EE EE EE EE EE EE EE EE ETV ETV ET V EP EP EP EP EP EP EP EP EP EP EE EE EE EE EE EG EG EP EE EE EE ET V ETV ETV ETV EE E E EE EE w w w EGEE EE EE EE EE EE EG EG EG EG EG EG EG EG EG X S D XSD XSD XSD XSD XSD XSD ES S EW S w XSD X S A X S A X S A X S A XSA XSA XSA XSA XSA XSA XSA XSA XSA XSA XSA XSA 1+98 0+0 0 0+50 1+00 1+50 0 + 0 0 0 + 2 6 0 + 9 2 0+00 0 + 5 0 1+0 0 0+00 0+ 5 0 0+ 0 0 0+ 5 0 1+00 0+00 0+50 1+00 25 + 5 0 2 6 + 0 0 2 6 + 5 0 2 7 + 0 0 2 7 + 5 0 PT: 25+88.6 1 BOT RG: 20.29 BOT RG: 20.00 BOT RG: 18.68 BOT RG: 19.85 BOT RG: 20.00 BOT RG: 19.50 BOT RG: 19.20 BOT RG: 24.70 BOT RG: 21.75 RI M : 2 7 . 0 0 RI M : 2 6 . 4 0 RI M : 2 2 . 2 5 RI M : 2 1 . 3 0 RI M : 3 1 . 5 0 RI M : 2 9 . 5 0 RI M : 2 0 . 5 0 RI M : 1 9 . 6 0 RI M : 2 5 . 2 0 RI M : 2 0 . 3 3 RIM: 20.18 RI M : 1 9 . 3 5 12C FF2: 7843.00 FF1: 7832.10 15E FF2 = 7832.40 FF1 = 7821.50 DRY HYDRANT CROSSING SEWER SERVICE CROSSING SEWER SERVICE CROSSING RE. TO NOTE 26 THIS SHT 25.9' of 18" HDPE @ 0.6% 41.9' of 15" P.V.C. @ 0.6% 58.8' of 15" HDPE PIPE @ 0.5% 49.0' of 15" HD P E P I P E @ 0.5% 6.5' of 15" HDPE @ 0.5% 13.2' of 15" RCP @ 1.9% 4 7 . 8 ' o f 1 2 " H D P E @ 1 . 0 % 40 . 5 ' o f 1 2 " H D P E @ 1 . 0 % 25.5 ' o f 1 2 " H D P E @ 7. 5 % 69 . 9 ' o f 1 2 " H D P E @ 2 . 0 % 63 . 7 ' o f 1 2 " H D P E @ 2 . 6 % 30.3' o f 1 2 " H D P E @ 1. 0 % 22.8' of 12" HDPE 35.1' of 12" HDPE @ 1.0% 47.6' of 1 2 " H D P E @ 1.0 % (EXISTING) 2'X3' CURB INLET ''J6A3'' EX. RIM:7821.88 ADJUST RIM TO: 7820.05 REMOVE EXISTING 12" RCP (N) & INSTALL 18" RCP (N) INV IN:7815.60 24" RCP INV OUT:7815.40 FLAT TOP MH W/ 24" GRATE OFFSET TO THE WEST STA:0+41.80 RIM:7819.35 15" HDPE INV:7815.85 15" HDPE INV:7815.85 18" HDPE INV OUT:7815.85 INLET-23B 15" NYLOPLAST BASIN STA:0+86.09 RIM:7820.18 15" HDPE INV:7816.13 INLET-22B 15" NYLOPLAST BASIN STA:1+46.09 RIM:7820.33 15" HDPE INV:7816.42 DRYWELL-21B 4' DIA MANHOLE/DRYWELL WITH INLET TOP STA:1+97.74 RIM:7820.50 SUMP:7807.50 12" HDPE INV IN (W):7815.40 12" HDPE INV IN (N):7815.40 4" P.V.C. INV IN (TO RG 21B UNDERDRAIN):7817.59 15" HDPE INV OUT:7816.67ABANDON EXISTING INLET STRUCTURE & EXISTING STORM DRAIN PIPE DRYWELL-25B1 5' DIA MANHOLE/DRYWELL RE. TO DETAILS STA:0+10.20 RIM:7820.57 SUMP:7805.57 15" RCP INV IN:7815.75 15" HDPE INV OUT:7815.90 INLET-25B COA STANDARD CURB INLET; RE. TO DETAILS 2'X3' CURB INLET STA:0+26.38 RIM:7819.33 15" RCP INV OUT:7816.00 INLET-17B 2'X2' AREA INLET STA:0+92.34 RIM:7825.20 4" P.V.C. INV IN:7822.78 (TO RG 17B UNDERDRAIN) 4" P.V.C. INV IN:7819.42 (TO FND & BLDR DRN) 12" HDPE INV OUT:7816.28 INLET-20B7 12" NYLOPLAST BASIN STA:0+72.37 RIM:7821.17 12" HDPE INV:7816.80 HEADWALL-20B CONCRETE HEADWALL RE. DETAIL C/10.06 STA:0+04.33 12" HDPE INV OUT:7822.00 INLET-20B5 12" NYLOPLAST BASIN STA:0+69.03 RIM:7826.40 12" HDPE INV:7823.65 INLET-20B4 12" NYLOPLAST BASIN STA:1+00.36 RIM:7827.00 12" HDPE INV:7823.95 INLET-20B3 12" NYLOPLAST BASIN STA:1+24.12 RIM:7827.00 12" HDPE INV:7824.18 HEADWALL-17B4 CONCRETE HEADWALL RE. DETAIL C/C10.06 STA:0+00.00 12" HDPE INV OUT:7826.50 INLET-17B3.1 12" NYLOPLAST BASIN STA:0+36.10 RIM:7829.50 12" HDPE INV:7826.86 INLET-20B6 12" NYLOPLAST BASIN STA:0+98.70 RIM:7822.25 4" P.V.C. INV IN:7819.83 1" DRAIN INV IN=7819.40'' 12" HDPE INV OUT:7818.75 INLET-17B3 12" NYLOPLAST BASIN STA:0+84.71 RIM:7831.50 12" HDPE INV:7827.35 39.0' of 12" H D P E @ 1.0% INLET-28B 12" NYLOPLAST BASIN STA:0+43.03 RIM:7819.60 12" HDPE INV:7815.80 4" PERFORATED UNDERDRAIN CLEANOUT RG 20B RIM:7821.75 4" P.V.C. INV OUT:7819.99 CLEANOUT RG 21B RIM:7819.50 4" P.V.C. INV OUT:7817.66 4" PERFORATED UNDERDRAIN CLEANOUT RG 17B RIM:7824.70 4" P.V.C. INV OUT:7822.95 PERFORATED 4" UNDERDRAIN @ 0.5% 4" SOLID PVC STUB TO FOUNDATION DRAINS AND WALL DRAINS (RE. TO SHEET C8.05) (EXISTING) 3'X3' AREA INLET ''I-6A'' EX. RIM:7820.80 CONFIRM RIM AT 7820.80 (IF SO, NO ADJUSTMENT) (EXISTING) 2'X2' AREA INLET ''30B'' EX. RIM:7825.92 (EXISTING) 2'X3' CURB INLET ''J6A2'' EX. RIM:7819.30 ADJUST RIM TO: 7820.17 ETC CROSSING 7825 ABANDON EXISTING STORM PIPE BLOCK EXISTING PIPE & PATCH HOLE INLET 16B CONC. FLAT TOP MH W/ 24" GRATE OFFSET TO THE WEST STA:0+13.12 RIM:7821.00 18" HDPE INV IN:7815.68 4" P.V.C. INV IN:7817.96 18" RCP INV OUT:7815.68 11.0' of 18" RCP @ 0.6% EXISTING CONC. INLET TO BE REMOVED & CONNECT EXISTING 4" UNDERDRAIN TO NEW INLET STRUCTURE 16B 22.9' of 4" P.V.C. @ 0.5% ABANDON EXISTING 12" STORM PIPE CL STORM J6A3(EX.) TO 21B PROFILE 7800 7810 7820 7830 7800 7810 7820 7830 CL STORM PIPE TO 25B PROFILE 7800 7810 7820 7830 7800 7810 7820 7830 CL STORM 21B TO 17B PROFILE 7800 7810 7820 7830 7800 7810 7820 7830 CL STORM 21B TO 20B6 PROFILE 7800 7810 7820 7830 7800 7810 7820 7830 0+00 78 2 0 . 1 78 2 0 . 8 78 1 5 . 7 5 0+50 78 1 9 . 7 78 1 5 . 9 0 78 2 0 . 8 78 1 6 . 0 5 1+00 78 2 0 . 4 78 1 6 . 2 0 78 2 1 . 1 78 1 6 . 3 2 1+50 78 2 0 . 3 78 1 6 . 4 4 78 2 1 . 3 78 1 6 . 5 7 1+98 78 2 0 . 5 UTILITY CROSSING EX. E-T-C; RE. TO NOTES 8 STA: 0+06.38 ELEV= 7817.86' UTILITY CROSSING EX GAS LINE; RE. TO NOTE 8 STA: 0+47.70 ELEV= 7815.16' 0+00 78 1 9 . 4 78 1 9 . 8 78 1 5 . 9 9 0+26 78 1 9 . 3 78 1 6 . 0 0 0+00 78 2 0 . 5 78 1 5 . 4 0 78 2 1 . 1 78 1 5 . 6 3 0+50 78 1 9 . 4 78 1 5 . 8 6 78 2 1 . 4 78 1 6 . 1 1 0+92 78 2 5 . 2 78 1 6 . 2 8 0+00 78 2 0 . 5 78 1 5 . 4 1 78 2 0 . 8 78 1 5 . 8 6 0+50 78 2 1 . 3 78 1 6 . 3 6 78 2 1 . 6 78 1 6 . 9 8 1+00 78 2 1 . 8 78 1 8 . 7 5 5.46' PR SEWER MAIN STA: 0+39.48 T.O.P.: 7810.64 PR SEWER SERVICE TO 15E STA: 1+25.54 T.O.P.: 7814.31 PR WATER SERVICE TO 15E STA: 1+74.69 T.O.P.: 7814.07 2.02' 2.50' 25.9' of 18" HDPE @ 0.6% 41.9' of 15" HDPE @ 0.6% 58.8' of 15" HDPE @ 0.5% 49.0' of 15" HPDE @ 0.5% INLET-24B 4' Ø FLAT TOP MH W/ GRADE RINGS & 24" GRATE STA:0+41.80 RIM:7819.35 SUMP:7815.35 15" HDPE INV IN:7815.85 15" HDPE INV IN:7815.85 18"HDPE INV OUT:7815.85 INLET-23B 15" NYLOPLAST BASIN STA:0+86.09 RIM:7820.18 15" HDPE INV:7816.13 INLET-22B 15" NYLOPLAST BASIN STA:1+46.09 RIM:7820.33 15" HDPE INV:7816.42 DRYWELL-21B RE. TO DETAILS 4' DIA MANHOLE/DRYWELL STA:1+97.74 RIM:7820.50 SUMP:7807.50 12" HDPE INV IN:7815.40 12" HDPE INV IN:7815.40 4" P.V.C. INV IN:7817.59 15" HDPE INV OUT:7816.67 13.2' of 15" RCP @ 1.9%INLET-25B COA STANDARD CURB INLET; RE. TO DETAILS 2'X3' CURB INLET STA:0+26.38 RIM:7819.33 15" RCP INV OUT:7816.00 DRYWELL-21B RE. TO DETAILS 4' DIA MANHOLE/DRYWELL STA:0+00.00 RIM:7820.50 SUMP:7807.50 12" HDPE INV IN:7815.40 12" HDPE INV IN:7815.40 4" P.V.C. INV IN:7817.59 15" P.V.C. INV OUT:7816.67 40.5' of 12" HDPE @ 1.0% 47.8' of 12" HDPE @ 1.0% INLET-17B 2'X2' AREA INLET STA:0+92.34 RIM:7825.20 4" P.V.C. INV IN:7822.78 4" P.V.C. INV IN:7819.42 12" HDPE INV OUT:7816.28 DRYWELL-21B 4' DIA MANHOLE/DRYWELL STA:0+00.00 RIM:7820.50 SUMP:7807.50 12" HDPE INV IN:7815.40 12" HDPE INV IN:7815.40 4" P.V.C. INV IN:7817.59 15" P.V.C. INV OUT:7816.67 69.9' of 12" HDPE @ 2.0% INLET-20B7 12" NYLOPLAST BASIN STA:0+72.37 RIM:7821.17 12" HDPE INV:7816.80 25.5' of 12" HDPE @ 7.5% INLET-20B6 12" NYLOPLAST BASIN STA:0+98.70 RIM:7822.25 4" P.V.C. INV IN:7819.83 1" DRAIN INV IN=7819.40'' 12" HDPE INV OUT:7818.75 INLET-28B 12" NYLOPLAST BASIN STA:0+43.03 RIM:7819.60 12" HDPE INV:7815.80 PROPOSED GRADE (TYP) EXISTING GRADE (TYP) PROPOSED GRADE (TYP)PROPOSED PIPE INVERT (TYP) STA: 0+28.18 EX. ELEC T.O.P.= 7815.60' (ADJUST AS REQUIRED; RE. TO NOTE 8)UTIL XING (PROP. ELEC) STA: 0+18.23 T.O.P.= 7813.76' UTIL XING (PROP. ELEC) STA: 1+80.38 T.O.P.= 7814.53' (EXISTING) 2'X3' CURB INLET ''J6A3'' STA:0+00.00 EX. RIM:7821.88 ADJUST RIM TO: 7820.05 PROPOSED 18" HDPE INV IN:7815.60 EXISTING 24" RCP INV OUT:7815.4± DRYWELL-25B1 RE. TO DETAILS 5' DIA MANHOLE/DRYWELL STA:0+10.20 RIM:7820.57 SUMP:7805.57 15" RCP INV IN:7815.75 15" HDPE INV OUT:7815.90 INLET-24B 4' DIA. FLAT TOP MH STA:0+41.80 RIM:7819.35 SUMP:7815.35 INV IN:7815.85 15" HDPE INV IN:7815.85 15" HDPE INV OUT:7815.85 18" HDPE INLET 16B 4' Ø FLAT TOP MH W/ GRADE RINGS & 24" GRATE STA:0+13.12 RIM:7821.00 SUMP:7815.18 INV IN:7815.68 18" HDPE INV IN:7817.96 4" P.V.C. (RG 16B UNDERDRAIN) INV OUT:7815.68 18" RCP 11.0' of 18" RCP @ 0.6% D D SNOW S T O R A G E EASEM E N T (SEE D E T A I L A T H I S S H E E T ) S8 1 ° 2 5 ' 2 1 " W 9 0 . 9 1 ' N8 1 ° 2 5 ' 2 1 " E 1 1 1 . 5 3 ' N7° 21' 19"W 89.91' TOC 42.33 BURLINGAME RANCH PHASE 1 BURLINGAME RANCH PHASE 2BURLINGAME RANCH PHASE 3RO6 RO5 BLD G 1 4 BLDG 13 BLDG 15 BLDG 11 BLDG 10 BLDG 9 BLDG 8 BL D G 1 2 P11 P14 G: \ 2 0 1 9 \ 1 9 1 2 0 - B G P H 3 \ C I V I L \ C I V I L D W G S \ P L O T \ S H E E T S E T \ 1 9 1 2 0 - 6 - S T O R M . D W G - A p r 0 5 , 2 0 2 3 - 6 : 1 9 a m NORTH 1 inch = ft. ( IN FEET ) GRAPHIC SCALE 020 20 40 20 8010 MEMBER UTILITIES FOR THE MARKING OF UNDERGROUND BEFORE YOU DIG, GRADE, OR EXCAVATE CALL 2-BUSINESS DAYS IN ADVANCE Know what's below. before you dig.Call R C6.03 SHEET INDEX MAP SCALE: 1" = 300' NORTH STORM PLAN & PROFILE 3 OPRIS ES NGINEERING, LLC. CIVIL CONSULTANTS 502 MAIN STREET CARBONDALE, CO 81623 (970) 704-0311 FAX: (970)-704-0313 PROJECT NUMBER ISSUE DATE REVISIONS SHEET TITLE ISSUE SHEET NO. TOWN STAMP DISCIPLINE STAMP 19120 No.Description Date BU R L I N G A M E R A N C H P H A S E 3 I M P R O V E M E N T S CI T Y O F A S P E N , C O L O R A D O 1 50% DD 1.24.2020 HORIZONTAL SCALE: 1" = 20' VERTICAL SCALE: 1" = 20' 6/19/2020 2 100% DD 3.10.2020 3 25% CD 5.1.2020 4 50% CD 5.15.2020 PERMIT DRAWINGS 5 PERMIT SET 6.19.2020 P A E P C K E R O A D MIN I N G S T O C K 6 12.11.2020PERMIT RESUBMIT 1 1.STORM SEWER STRUCTURE TYPES REFER TO COLORADO DEPARTMENT OF TRANSPORTATION M & S STANDARDS, CDOT STANDARD SPECIFICATIONS, OR ARE INCLUDED ON THE DETAIL SHEETS; CONTRACTOR TO PROVIDE SHOP DRAWINGS FOR APPROVAL PRIOR TO INSTALLATION. 2.ALL AREA INLETS FOR NYLOPLAST BASINS SHALL BE STANDARD 12" GRATES OR AS OTHERWISE NOTED ON THE PLANS. CONTRACTOR SHALL SUPPLY SHOP DRAWINGS PRIOR TO INSTALLATION. 3.STORM SEWER ELEVATIONS SHOWN ARE AT A PIPE INVERT UNLESS OTHERWISE SPECIFIED. 4.ALL HDPE STORM PIPE GREATER THAN 8" TO BE ADS-12-HP, SMOOTH INTERIOR WALL PIPE. 4" PERFORATED UNDERDRAINS TO MEET SPECIFICATIONS NOTED ON DETAILS. 5.PIPE LENGTHS INDICATED ARE SLOPE LENGTHS MEASURED ALONG THE CENTERLINE OF PIPE FROM INSIDE FACE OF INLET (OR MANHOLE) TO INSIDE FACE OF INLET (OR MANHOLE) 6.PIPE LENGTHS DO NOT INCLUDE FLARED END SECTIONS. 7.CONTRACTOR TO CONFIRM EXISTING LOCATION, MATERIAL AND DEPTHS OF ALL POINTS OF CONNECTION OF PROPOSED STORM DRAIN LINES TO EXISTING STORM SYSTEM. 8.CONTRACTOR TO CONFIRM ALL LOCATIONS AND DEPTHS OF EXISTING UTILITIES AT STORM SEWER CROSSINGS PRIOR TO INSTALLATION OF STORMWATER INFRASTRUCTURE. IF A UTILITY CONFLICT EXISTS BETWEEN EXISTING SHALLOW UTILITIES & PROPOSED STORM INFRASTRUCTURE, THE CONTRACTOR SHALL COORDINATE WITH THE UTILITY PROVIDER AND INSTALL/RELOCATE SHALLOW UTILITIES TO COMPLY WITH CITY OF ASPEN ENGINEERING STANDARDS AS LISTED WITHIN TABLE 3 OF SECTION 3.2. 9.ALL PROPOSED UTILITY CROSSINGS SHALL COMPLY WITH TABLE 3, SECTION 3.2 OF THE CITY ENGINEERING STANDARDS. 10.STORM SEWER STATIONING IS INDEPENDENT OF ROAD STATIONING. STORM SEWER STATIONING CORRELATES TO THE CENTERLINE OF STORM SEWER PIPE AND THE CENTER OF INLET BOXES OR MANHOLES. 11.ALL CONCRETE INLET BOXES SHALL HAVE A 6" SUMP BELOW THE OUTLET PER COA STANDARDS. 12.ALL STORM PIPE OUTFALL LARGER THAN 12" DIAMETER TO HAVE TRASH RACKS. (RE. TO DETAILS) 13.ANY DEVIATIONS FROM THESE PLANS REQUIRES PRE-APPROVAL BY THE ENGINEER OF RECORD & THE CITY OF ASPEN ENGINEERING DEPARTMENT. 14.CONTRACTOR SHALL CONFIRM EXISTING UTILITIES AT ALL CROSSING LOCATIONS TO CONFIRM LOCATION, DEPTH, SIZE AND NUMBER OF CONDUITS PRIOR TO ENSURE PROPER CLEARANCES ARE MAINTAINED/PROVIDED. 15.RAIN GARDENS LOCATED WITHIN 10-FT OF A STRUCTURE SHALL INCLUDE AN UNDERDRAIN SYSTEM; RE TO DETAILS & SIZING CHART FOR ADDITIONAL INFORMATION. 16.CONTRACTOR SHALL PROVIDE SHOP DRAWINGS TO ENGINEERING OF RECORD FOR APPROVAL PRIOR TO INSTALLATION. 17.RAIN GARDENS SHALL BE PROTECTED DURING CONSTRUCTION TO AVOID CONTAMINATION. 18.REFER TO RAIN GARDEN DETAILS & SIZING CHART ON SHT. C10.07 FOR DEPTHS & SIZING PARAMETERS. 19.CONTRACTOR SHALL SCHEDULE & PERFORM A PERC. TEST AT EACH RAIN GARDEN ONCE EXCAVATED AREA IS COMPLETED TO CONFIRM UNDERLYING SOILS ARE ACCEPTABLE. IF NOT THEN CONTRACTOR TO INSTALL RAIN GARDEN PER NON-INFILTRATION DETAIL PER SHT. C10.07. 20.CONNECTION TO EXISTING INLET STRUCTURES SHALL BE DONE IN A WORKMANLIKE MANNER. THE INVERT SHALL BE BROUGHT INTO STRUCTURES AT THE ELEVATION SHOWN HEREIN. THE DOWNSTREAM PIPE INSIDE THE MANHOLE SHALL BE SCREENED TO PREVENT ENTRY OF DEBRIS FROM ENTERING THE SYSTEM. FILL VOIDS WITH NON-SHRINK GROUT. AFTER GROUT HAS SET CUT PIPE OFF EVENLY SO THAT NO MORE THAN 2" OF PIPE PROTRUDES INTO STRUCTURE AND THEN REMOVE ALL SCREENS. 21.CONTRACTOR RESPONSIBLE FOR CLEANING & CCTV'ING THE EXISTING AND PROPOSED STORM SYSTEM AND PROVIDING VIDEO DOCUMENTATION TO ENGINEER OF RECORD FOR ACCEPTANCE PRIOR TO REQUESTING FINAL INSPECTIONS FOR PROJECT CLOSE OUT. 22.INSTALLATION OF STORMWATER INFRASTRUCTURE SHALL FOLLOW MANUFACTURER'S SPECIFICATIONS. 23.STORM DRAINAGE FACILITIES NEED TO BE PERIODICALLY INSPECTED AND MAINTAINED TO ENSURE PROPER FUNCTION THROUGHOUT THE DURATION OF CONSTRUCTION. 24.CONTRACTOR IS RESPONSIBLE FOR COORDINATING WITH THE ENGINEER OF RECORD ON MEANS AND METHODS OF ACQUIRING AS-BUILT INFORMATION IN SUPPORT OF THE FINAL GRADING & DRAINAGE CERTIFICATION THAT IS REQUIRED PRIOR TO PROJECT CLOSE-OUT. 25.CONTRACTOR IS RESPONSIBLE FOR PROVIDING FINAL VIDEO INSPECTIONS OF STORM DRAINS THAT CONNECT TO THE CITY'S STORM DRAIN SYSTEM. VIDEO INSPECTIONS SHALL BE SENT TO ENGINEER OF RECORD FOR APPROVAL PRIOR TO ISSUING TO CITY. 26.CONTRACTOR TO CONFIRM LOCATION, DEPTH AND SIZE OF EXISTING UNDERDRAIN PRIOR TO CONSTRUCTION AND COORDINATE WITH ENGINEER OF RECORD AS NECESSARY TO ENSURE COMPLIANCE WITH DRAINAGE DESIGN NOTES: 7 ADDENDUM 2 12.16.2020 8 3.15.2021PERMIT RESUBMIT 2 SUPPLEMENTAL INFORMATION SUMMARY: 1.REVISED DRY WELL 25B OUTFALL PIPE ROUTING BASED ON EXISTING CONDITIONS AND INABILITY TO CONNECT TO EXISTING 18" RCP STORM PIPE (RFI 498). 11 03.23.2023SUPPLEMENTAL INFO. 11 11 11 11 11 11 11 11 11 11 11 11 11 11 Reviewed by Engineering 04/05/2023 8:37:52 AM "It should be known that this review shall not relieve the applicant of their responsibility to comply with the requirements of the City of Aspen. The review and approval by the City is offered only to assist the applicant's understanding of the applicable Engineering requirements." The issuance of a permit based on construction documents and other data shall not prevent the City of Aspen from requiring the correction of errors in the construction documents and other data.