Burlingame Phase III - COA Permit Comment Response 2 - 225 Paepcke CSI - 02-12-2021
* The following matrix are the COA Civil Permit Comments 2 per the Permit drawings dated 12-11-2020. The comments are organized per department review and contain the original comment information along with design team
response and the design team member responsible for the response.
Landscaping Comments - Jay C Reviewer - 359 Design
File Page Parties Notes Design Team Member Design Team Response Date Complete
P2.1 90.Civil Plans.20201211.pdf 2 Civil /
Contractor
(see sheet) Shaw Shaw Construction has accounted for all
Inspections in our schedule. Permits and
associated fee's will be paid by COA/Owners
Representative.
P2.2 90.Architectural Plans-
CARPORTS.20201211.pdf
1 Civil /
Contractor
(see sheet) Shaw Shaw Construction has accounted for all
Inspections in our schedule. Permits and
associated fee's will be paid by COA/Owners
Representative.
P2.3 50.Construction Managment Plan 6 Civil /
Contractor
During the earth stabilization activities it is
required that noise mitigation in the form of
Sound Fencing be installed. Please provide
details as to how this system will be
implemented.
Shaw Shaw Construction will be providing a Noise
Mitigation plan and the proposed sound fence will
be iincluded. The purchase agreement with the
vendor will be finalized. The CMP plan will be
updated with the requeseted information.
P2.4 90.Civil Plans.20201211.pdf 1 Civil /
Contractor
The scope of this work requires a State of
Colorado Stormwater Permit, all construction
permits require the standardized CoVid Safety
Plan that can be found on the City of Aspen
Website. Additionally a Utility Water
Connection Permit will be required to process
the required Water Services.
Sopris Engineerin / Shaw Aspen Diggers will be applying for
the Utility Water Connection permit.
Shaw Constructions will provide the COVID Safety
Plan. The CMP plan will be updated with the
requeseted information.
P2.5 90.Civil Plans.20201211.pdf 1 Civil /
Contractor
Please provide installation details for all BMPs
that are proposed including Concrete
Washout, Protection for Paver system and
assembly, Inlet Protection, Tracking Control
System, and all other proposed BMPs.
Shaw Shaw is contracted with ESI and will be providing a
full Storm Water plan that complies with all
Federal, state and local codes. The CMP plan will
be updated with the requeseted information.
03/05/202103/05/2021