Loading...
HomeMy WebLinkAboutFile Documents.33 MINING STOCK PKWY.0093-2020-BRES (10)Column1 Column2 Column3 Column4 Column5 Column6 Column7 Column8 Column9 Burlingame Phase III - COA Permit Comment Response 2 - 225 Paepcke CSI - 02-12-2021 * The following matrix are the COA Civil Permit Comments 2 per the Permit drawings dated 12-11-2020. The comments are organized per department review and contain the original comment information along with design team response and the design team member responsible for the response. Landscaping Comments - Jay C Reviewer - 359 Design File Page Parties Notes Design Team Member Design Team Response Date Complete P2.1 90.Civil Plans.20201211.pdf 2 Civil / Contractor (see sheet) Shaw Shaw Construction has accounted for all Inspections in our schedule. Permits and associated fee's will be paid by COA/Owners Representative. P2.2 90.Architectural Plans- CARPORTS.20201211.pdf 1 Civil / Contractor (see sheet) Shaw Shaw Construction has accounted for all Inspections in our schedule. Permits and associated fee's will be paid by COA/Owners Representative. P2.3 50.Construction Managment Plan 6 Civil / Contractor During the earth stabilization activities it is required that noise mitigation in the form of Sound Fencing be installed. Please provide details as to how this system will be implemented. Shaw Shaw Construction will be providing a Noise Mitigation plan and the proposed sound fence will be iincluded. The purchase agreement with the vendor will be finalized. The CMP plan will be updated with the requeseted information. P2.4 90.Civil Plans.20201211.pdf 1 Civil / Contractor The scope of this work requires a State of Colorado Stormwater Permit, all construction permits require the standardized CoVid Safety Plan that can be found on the City of Aspen Website. Additionally a Utility Water Connection Permit will be required to process the required Water Services. Sopris Engineerin / Shaw Aspen Diggers will be applying for the Utility Water Connection permit. Shaw Constructions will provide the COVID Safety Plan. The CMP plan will be updated with the requeseted information. P2.5 90.Civil Plans.20201211.pdf 1 Civil / Contractor Please provide installation details for all BMPs that are proposed including Concrete Washout, Protection for Paver system and assembly, Inlet Protection, Tracking Control System, and all other proposed BMPs. Shaw Shaw is contracted with ESI and will be providing a full Storm Water plan that complies with all Federal, state and local codes. The CMP plan will be updated with the requeseted information. 03/05/202103/05/2021