HomeMy WebLinkAboutFile Documents.800 Gibson Ave.0024-2023-BREP (2) 1 Construction Mitigation Plan for Minor Projects Full Construction Management Plan (CMP) requirements can be found in the Construction Management Plan Requirements Manual available here. The following document can be utilized for interior remodels and/or soil disturbance less than 1,000 SF with no excavation stabilization. The “Construction Mitigation Plan for Medium Projects” document can be utilized for interior remodels and/or soil disturbance greater than 1,000 SF and less than 2,000 SF. For large projects or at the discretion of the CMP reviewer a full CMP written by the project contractor is required. The purpose of this form is for small projects to acknowledge the applicant is aware of all CMP requirements and will abide by all requirements. 1.0 General The project contractor has completed the City of Aspen online CMP certification class. The online training course is available at cmpaspen.com. A copy of the CMP certificate is provided with this submission. 2.0 Project Location Project Address: Project Disturbance Area: Project Description: Contact Information: Name: Phone: Email: 3.0 Project Documentation Prior to the start of permit activity, the contractor will properly notify all neighbors and the general public. Prior to the start of permit activity, a project sign will be posted at the site. 05/11/2023 Reviewed by Engineering 05/30/2023 7:26:52 AM "It should be known that this review shall not relieve the applicant of their responsibility to comply with the requirements of the City of Aspen. The review and approval by the City is offered only to assist the applicant's understanding of the applicable Engineering requirements." The issuance of a permit based on construction documents and other data shall not prevent the City of Aspen from requiring the correction of errors in the construction documents and other data. 2 4.0 Project Implementation Hours of Construction: Construction hours shall be limited to 7:30am – 5:30pm Monday through Friday and 9:00am – 5:00pm on Saturday. No construction is permitted on Sundays or holidays as identified by the CMP Manual. Prior to the start of permit activity the project will provide fencing six feet (6') in height and constructed out of chain-link fence with mesh windscreens (visual barriers) for all exterior work. The contractor is aware of all trees within the work area and will provide tree protection in coordination with, and as directed by the City Parks Department. 5.0 Site and Right of Way Management By signing this document, the contractor ensures that there is adequate staging area onsite for all construction trailers, job materials storage, portable restrooms, waste management and recycling containers. If a portion of the ROW is needed the contractor will submit for a temporary encroachment permit. Loose job material storage is not allowed in ROW under any circumstances. The project will maintain continuous emergency vehicle access, on and around site, including but not limited to police, fire, and ambulance services. All required construction parking shall be provided onsite or the contractor will properly lease parking spaces from the COA Parking Department. Contractor will provide recycling onsite for both conventional and construction related materials. 6.0 Traffic Control By signing this document the contractor ensures that the project does not impact roadways or pedestrian walkways. No traffic control plan is needed. The project requires no special circumstances for deliveries. Traffic control required for deliveries must be fully coordinated with the City of Aspen Engineering Department. Roads will not be closed under any circumstances, unless granted permission from the City of Aspen Engineering Department. 7.0 Pedestrian Protection The project maintains all pedestrian walkways including all ADA requirements. 8.0 Sediment and Erosion Control Best Management Practices will be installed which will prevent any erosion and sediment transport offsite. 05/11/2023