Construction Mitigation Plan for Minor Projects
Full Construction Management Plan (CMP) requirements can be found in the Construction Management
Plan Requirements Manual available here. The following document can be utilized for interior remodels
and/or soil disturbance less than 1,000 SF with no excavation stabilization. The “Construction Mitigation
Plan for Medium Projects” document can be utilized for interior remodels and/or soil disturbance greater
than 1,000 SF and less than 2,000 SF. For large projects or at the discretion of the CMP reviewer a full CMP
written by the project contractor is required.
The purpose of this form is for small projects to acknowledge the applicant is aware of all CMP
requirements and will abide by all requirements.
1.0 General
The project contractor has completed the City of Aspen online CMP certification class. The online
training course is available at cmpaspen.com. A copy of the CMP certificate is provided with this
submission.
2.0 Project Location
Project Address:
Project Disturbance Area:
Project Description:
Contact Information:
Name:
Phone:
Email:
3.0 Project Documentation
Prior to the start of permit activity, the contractor will properly
notify all neighbors and the general public.
Prior to the start of permit activity, a project sign will be posted at the
site.
05/11/2023
Reviewed by Engineering
05/30/2023 7:26:52 AM
"It should be known that this review shall not
relieve the applicant of their responsibility to
comply with the requirements of the City of
Aspen. The review and approval by the City is
offered only to assist the applicant's
understanding of the applicable Engineering
requirements." The issuance of a permit based
on construction documents and other data shall
not prevent the City of Aspen from requiring the
correction of errors in the construction
documents and other data.
2
4.0 Project Implementation
Hours of Construction: Construction hours shall be limited to 7:30am – 5:30pm Monday through
Friday and 9:00am – 5:00pm on Saturday. No construction is permitted on Sundays or holidays as
identified by the CMP Manual.
Prior to the start of permit activity the project will provide fencing six feet (6') in height and
constructed out of chain-link fence with mesh windscreens (visual barriers) for all exterior work.
The contractor is aware of all trees within the work area and will provide tree protection in
coordination with, and as directed by the City Parks Department.
5.0 Site and Right of Way Management
By signing this document, the contractor ensures that there is adequate staging area onsite for all
construction trailers, job materials storage, portable restrooms, waste management and recycling
containers. If a portion of the ROW is needed the contractor will submit for a temporary
encroachment permit. Loose job material storage is not allowed in ROW under any circumstances.
The project will maintain continuous emergency vehicle access, on and around site, including but not
limited to police, fire, and ambulance services.
All required construction parking shall be provided onsite or the contractor will properly lease parking
spaces from the COA Parking Department.
Contractor will provide recycling onsite for both conventional and construction related materials.
6.0 Traffic Control
By signing this document the contractor ensures that the project does not impact roadways or
pedestrian walkways. No traffic control plan is needed.
The project requires no special circumstances for deliveries. Traffic control required for deliveries
must be fully coordinated with the City of Aspen Engineering Department. Roads will not be closed
under any circumstances, unless granted permission from the City of Aspen Engineering Department.
7.0 Pedestrian Protection
The project maintains all pedestrian walkways including all ADA requirements.
8.0 Sediment and Erosion Control
Best Management Practices will be installed which will prevent any erosion and sediment transport
offsite.