Loading...
HomeMy WebLinkAboutFile Documents.602 E Cooper Ave.0059-2023-BCOM City of Aspen Building Permit Application Checklist if140 for Commercial and Multifamily Projects (IBC) T %-ASPEN GG PROJECTADDRESSv02 E. Cooper AVE,#104 DATE 9/28/2023 Note:This checklist is specific to Building Department requirements for various building permit application types.For Zoning,Engineering,Parks, Utilities,and WELS requirements visit their pages at http://www.aspen.gov. Building permit application submissions must include ALL the Submittal Requirements on this checklist or they will not be accepted.Refer to the IBC Building Submittal Guide for more information about each requirement. Submittal guides,required forms and other resources can be found in the Building Department Document and Resource Library. Submit all documents and drawings in PDF format via the Salesforce portal.Follow File Preparation Standards for all files submitted. REQUIRED 8 34" X 11" DOCUMENTS Submittal New Addition Alteration/ Alteration Demo Repair Requirements Construction Remodel (Interior only) (Complete) Permit Application ❑ Packet* ✓ Asbestos test and clearance reports ✓ ❑ State Asbestos Demolition Approval Notice Fireplace Registration Form in Manufacturer's ❑ ❑ installation instructions 116 Energy Code Compliance (REScheck, I✓ COMcheck,or I_ prescriptive path) U-Factor Fenestration Docs Pee documents s docu Line Grade Verification Form RECEIVED Updated 3/9/22 Page 1 of 5 11/09/2023 ASPEN BUILDING DEPARTMENT Submittal New Addition Alteration/ Alteration Demo Repair Requirements Construction Remodel (Interior only) (Complete) Signed Special ❑ Inspection and ❑ Testing Agreement Verification of Structural Integrity V Soils Report 111 Mechanical Docs Photos Unit/Building relationship ❑ I I CMP** Residential ECU Calculator** I 1 ❑ Water/sewer Service D ❑ Disconnect Applications *Permit Application Packet must be filled out entirely or your submission will not be accepted. **CMP and ECU Calculator are common Engineering requirements; contact Engineering to discuss. REQUIRED 24"x36" PLANS Note: Sheets must be in the following order. Existing plans required for all additions &alterations. Submittal I New I Addition I Alteration/ Alteration Demo Repair Requirements Construction Remodel (Interior only) (Complete) Cover Sheet 111 • Survey Fire Area Sheet RECEIVE! Updated 3/9/22 Page 2 of 5 11/09/2023 ASPEN BUILDING DEPARTMENT Submittal New Addition Alteration/ Alteration Demo Repair Requirements Construction Remodel (Interior only) (Complete) Site Plan CREM P/RREMP Plan ❑ ❑ Floor Plans: Existing & ❑ ❑ Proposed ✓ Reflected Ceiling Plans Lighting Plan w/ spec sheet(s) Occupancy/ Means of Egress Plans Separation/Fire Resistance Plans Fire Resistant Assembly Listed ❑ Installation Details Accessibility Plans &Details ✓ Roof Plan Elevations/ Height ❑ ❑ ❑ Sections Details Fireplace Details RECEIVED Updated 3/9/22 Page 3 of 5 11/09/2023 ASPEN BUILDING DEPARTMENT Submittal New Addition Alteration/ Alteration Demo Repair Requirements Construction Remodel (Interior only) (Complete) Schedules Excavation/ Earth Retention Plans Civil Plans *discuss directly ❑ with Engineering Electrical Plans Kitchen Plans Mechanical Plans Plumbing Isometrics/ Flatometric Structural Plans ADDITIONAL NOTES and/or REQUIREMENTS -asbestos testing -structural verification -ComCheck for lighting -light spec package with NRTL listing and max wattage highlighted on specs -show accessible route and proposed furnishings -POS if provided max height 36" -update plan to show 2020 NEC as current electrical code (shows 2017) -note existing HVAC system to remain RECEIVED Updated 3/9/22 Page 4 of 5 11/09/2023 ASPEN BUILDING DEPARTMENT PRE-SUBMISSION BUILDING CHECKLIST REVIEWED AND ACCEPTED: Dgitay si,ed by Just.Hahn Justin Hahn ON Eousen.hah eeigotaspen.oan.CN=Jushn Hahn.OU=User,OUxanunity De,ebpment OUxarmutity Dn sion.OUxity.DC=asperpikn,DC=aq ReaSa':I Fave revieWetl this tloaanerH CITY STAFF NAME: Date:202210°B10%°swat DATE: 1 0/6/22 PERMIT APPLICANT DECLINES TO CONDUCT A PRE-BUILDING PERMIT SUBMISSION MEETING WITH BUILDING STAFF AND UNDERSTANDS THAT FAILING TO DO SO MAY RESULT IN A LENGTHIER BUILDING REVIEW PROCESS: PERMIT APPLICANT NAME: DATE: RECEIVED Updated 3/9/22 Page 5 of 5 11/09/2023 ASPEN BUILDING DEPARTMENT