HomeMy WebLinkAboutFile Documents.602 E Cooper Ave.0059-2023-BCOM City of Aspen Building Permit Application Checklist
if140
for Commercial and Multifamily Projects (IBC)
T %-ASPEN GG
PROJECTADDRESSv02 E. Cooper AVE,#104 DATE 9/28/2023
Note:This checklist is specific to Building Department requirements for various building permit application types.For Zoning,Engineering,Parks,
Utilities,and WELS requirements visit their pages at http://www.aspen.gov.
Building permit application submissions must include ALL the Submittal Requirements on this checklist or they will not be accepted.Refer to the
IBC Building Submittal Guide for more information about each requirement. Submittal guides,required forms and other resources can be found in
the Building Department Document and Resource Library.
Submit all documents and drawings in PDF format via the Salesforce portal.Follow File Preparation Standards for all files submitted.
REQUIRED 8 34" X 11" DOCUMENTS
Submittal New Addition Alteration/ Alteration Demo Repair
Requirements Construction Remodel (Interior only) (Complete)
Permit
Application ❑
Packet* ✓
Asbestos test and
clearance reports ✓ ❑
State Asbestos
Demolition
Approval Notice
Fireplace
Registration Form
in Manufacturer's ❑ ❑
installation
instructions
116
Energy Code
Compliance
(REScheck, I✓
COMcheck,or I_
prescriptive path)
U-Factor
Fenestration
Docs
Pee documents
s
docu
Line Grade
Verification Form
RECEIVED
Updated 3/9/22 Page 1 of 5
11/09/2023
ASPEN
BUILDING DEPARTMENT
Submittal New Addition Alteration/ Alteration Demo Repair
Requirements Construction Remodel (Interior only) (Complete)
Signed Special ❑
Inspection and ❑
Testing
Agreement
Verification of
Structural
Integrity V
Soils Report
111
Mechanical Docs
Photos
Unit/Building
relationship ❑ I I
CMP**
Residential ECU
Calculator** I 1 ❑
Water/sewer
Service D ❑
Disconnect
Applications
*Permit Application Packet must be filled out entirely or your submission will not be accepted.
**CMP and ECU Calculator are common Engineering requirements; contact Engineering to discuss.
REQUIRED 24"x36" PLANS
Note: Sheets must be in the following order. Existing plans required for all additions &alterations.
Submittal I New I Addition I Alteration/ Alteration Demo Repair
Requirements Construction Remodel (Interior only) (Complete)
Cover Sheet
111
•
Survey
Fire Area Sheet
RECEIVE!
Updated 3/9/22 Page 2 of 5
11/09/2023
ASPEN
BUILDING DEPARTMENT
Submittal New Addition Alteration/ Alteration Demo Repair
Requirements Construction Remodel (Interior only) (Complete)
Site Plan
CREM P/RREMP
Plan ❑ ❑
Floor Plans:
Existing & ❑ ❑
Proposed ✓
Reflected Ceiling
Plans
Lighting Plan w/
spec sheet(s)
Occupancy/
Means of Egress
Plans
Separation/Fire
Resistance Plans
Fire Resistant
Assembly Listed ❑
Installation
Details
Accessibility
Plans &Details ✓
Roof Plan
Elevations/
Height ❑ ❑ ❑
Sections
Details
Fireplace Details
RECEIVED
Updated 3/9/22 Page 3 of 5
11/09/2023
ASPEN
BUILDING DEPARTMENT
Submittal New Addition Alteration/ Alteration Demo Repair
Requirements Construction Remodel (Interior only) (Complete)
Schedules
Excavation/
Earth Retention
Plans
Civil Plans
*discuss directly ❑
with Engineering
Electrical Plans
Kitchen Plans
Mechanical Plans
Plumbing
Isometrics/
Flatometric
Structural Plans
ADDITIONAL NOTES and/or REQUIREMENTS
-asbestos testing
-structural verification
-ComCheck for lighting
-light spec package with NRTL listing and max wattage highlighted on specs
-show accessible route and proposed furnishings
-POS if provided max height 36"
-update plan to show 2020 NEC as current electrical code (shows 2017)
-note existing HVAC system to remain
RECEIVED
Updated 3/9/22 Page 4 of 5
11/09/2023
ASPEN
BUILDING DEPARTMENT
PRE-SUBMISSION BUILDING CHECKLIST REVIEWED AND ACCEPTED:
Dgitay si,ed by Just.Hahn
Justin Hahn ON Eousen.hah eeigotaspen.oan.CN=Jushn Hahn.OU=User,OUxanunity
De,ebpment OUxarmutity Dn sion.OUxity.DC=asperpikn,DC=aq
ReaSa':I Fave revieWetl this tloaanerH
CITY STAFF NAME: Date:202210°B10%°swat
DATE: 1 0/6/22
PERMIT APPLICANT DECLINES TO CONDUCT A PRE-BUILDING PERMIT SUBMISSION MEETING
WITH BUILDING STAFF AND UNDERSTANDS THAT FAILING TO DO SO MAY RESULT IN A
LENGTHIER BUILDING REVIEW PROCESS:
PERMIT APPLICANT NAME:
DATE:
RECEIVED
Updated 3/9/22 Page 5 of 5