HomeMy WebLinkAboutFile Documents.602 E Cooper Ave.0059-2023-BCOM (7) COMcheck Software Version COMcheckWeb
rr'fl(i Interior Lighting Compliance Certificate
Project Information retie
ji)
Energy Code: 2021 IECC 6/2023 yj
Project Title: Avi and Co
Project Type: Alteration RCOMcXE
justinh
Construction Site: Owner/Agent: Designer/Contractor:
602 E Cooper Ave unit 104 Avi&Co Aspen Roscoe Hancock
ASPEN,Colorado 81611 602 E cooper Ave Taranaki Electric Inc
Aspen, Colorado 81611 PO BOX 1748
ASPEN,Colorado 81612
9706189573
roscoe@sopris.net
Allowed Interior Lighting Power
A B C D
Area Category Floor Area Allowed Allowed
(ft2) Watts /ft2 Watts
1-Retail:Sales Area 625 1.05 656
Allowance:Jewelry,crystal, china highlighting/Fix. ID: MT4LD411NE 300(a) 1.87 561(b)
Allowance:Jewelry,crystal, china highlighting/Fix. ID: MT4LD111NE 300(a) 1.87 297(b)
Allowance:Jewelry,crystal, china highlighting/Fix. ID: LED Cabinet 25(a) 1.87 24(b)
lighting
Allowance:Jewelry,crystal, china highlighting/Fix. ID: D1,D2 Led strip 40(a) 1.87 75(b)
fed from 100w d
Supplemental Allowed Watts(null) = 50
Total Allowed Watts = 1663
(a)Area claimed may exceed total floor area when Retail Merchandise Highlighting allowance(s)are specified.
(b)Allowance is (B x C)or the actual wattage of the fixtures given in Proposed Power section,whichever is less.
(c)Supplemental watts must be associated with retail merchandise highlighting fixtures.
Proposed Interior Lighting Power
A B C D E
Fixture ID : Description / Lamp/Wattage Per Lamp/ Ballast Lamps/ # of Fixture (C X D)
Fixture Fixture Watt.
Retail: Sales Area (625 sq.ft.)
LED: MT4LD411NE: Recessed LED 4 lamp: Other: 4 15 44 660
LED: MT4LD111NE: Recessed LED 1 lamp 11w: Other: 1 27 11 297
Incandescent:A: Pendant Sprig: Incandescent Other: 4 1 240 240
LED: LED Cabinet lighting: Cabinet LED 3w: Other: 3 8 3 24
LED: C: KF1034BBS: Semi-Flush Mount: Other: 4 1 12 12
LED: B: ORBET 42 CHANDELIER: Other: 1 1 50 50
LED: D1,D2 Led strip fed from 100w d: COB 24V LED Strip 4.6W per ft35: Other: 1 2 100 200
LED: D3,D4,D5 Led strip fed from 60w: COB 24v led strip 4.6w per ft: Other: 1 3 60 180
Total Proposed Watts = 1663
Project Title: Avi and Co Report date: 10/22/ 1 �/
23
Data filename: Patel/o§f/A0 2 3
ASPEN
BUILDING DEPARTMENT
Interior Lighting : Passes using retail merchandise highlighting supplemental watts.
Interior Lighting Compliance
Statement
Compliance Statement: The proposed interior lighting alteration project represented in this document is consistent with the
building plans, specifications, and other calculations submitted with this permit application.The proposed interior lighting
systems have been designed to meet the 2021 IECC requirements in COMcheck Version COMcheckWeb and to comply with any
applicable mandatory requirements listed in the Inspection Checklist.
R G Hancock ie ff'Yr,�dLl.&0% 10/21/2023
Name-Title Signature DA!
RELProject Title: Avi and Co Report a e: 0 2IVED
Data filename: Parl/d9f/ 023
ASPEN
BUILDING DEPARTMENT
COMcheck Software Version COMcheckWeb
Inspection Checklist
Energy Code: 2021 IECC
irIA
Requirements: 100.0% were addressed directly in the COMcheck software
Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each
requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception
is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
Section
# Plan Review Complies? Comments/Assumptions
& Req.ID
C103.2 Plans, specifications, and/or ❑Complies Requirement will be met.
[PR4]1 calculations provide all information ❑Does Not
with which compliance can be
determined for the interior lighting ❑Not Observable
and electrical systems and equipment ❑Not Applicable
and document where exceptions to
the standard are claimed. Information
provided should include interior
lighting power calculations,wattage of
bulbs and ballasts,transformers and
control devices.
Additional Comments/Assumptions:
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) `,- i ` j V i
Project Title: Avi and Co Report date: 10/22/23v
Data filename: Patel/d§f/2023
ASPEN
BUILDING DEPARTMENT
Section
# Rough-In Electrical Inspection Complies? Comments/Assumptions
& Req.ID
C405.2.3. Spaces required to have light- ❑Complies Requirement will be met.
1 reduction controls have a manual ❑Does Not
[EL22]1 control that allows the occupant to
reduce the connected lighting load in ['Not Observable
a reasonably uniform illumination ❑Not Applicable
pattern >= 50 percent.
C405.2.1, Occupancy sensors installed in ❑Complies Requirement will be met.
C405.2.1. classrooms/lecture/training rooms, ❑Does Not
1 conference/meeting/multipurpose
[EL18]1 rooms, copy/print rooms, ['Not Observable
lounges/breakrooms, enclosed offices, ❑Not Applicable
open plan office areas, restrooms,
storage rooms, locker rooms,
corridors,warehouse storage areas,
and other spaces <= 300 sqft that are
enclosed by floor-to-ceiling height
partitions. Reference section language
C405.2.1.2 for control function in
warehouses and section C405.2.1.3
for open plan office spaces.
C405.2.1. Occupancy sensors control function in EComplies Exception: Requirement does not apply.
2 warehouses: In warehouses,the ❑Does Not
[EL19]1 lighting in aisleways and open areas is
controlled with occupant sensors that ['Not Observable
automatically reduce lighting power ❑Not Applicable
by 50%or more within 20 minutes of
when the areas are unoccupied.The
occupant sensors control lighting in
each aisleway independently and do
not control lighting beyond the
aisleway being controlled by the
sensor. Lights not turned off by
occupant sensors is done so by time-
switch.
C405.2.1. Occupant sensor control function in ❑Complies Exception: Requirement does not apply.
3 open plan office areas: Occupant ❑Does Not
[EL20]1 sensor controls in open office spaces ['Not Observable
>= 300 sq.ft. have controls 1) ❑Not Applicable
configured so that general lighting can pp
be controlled separately in control
zones with floor areas <= 600 sq.ft.
within the space, 2)general lighting in
each zone permitted to turn on upon
occupancy in control zone, 3)
automatically turn off general lighting
in all control zones within 20 minutes
after all occupants have left the
space, 4)are configured so that
general lighting power in each control
zone is reduced by>= 80%of the full
zone general lighting power within 20
minutes of all occupants leaving that
control zone.
C405.2.2, Each area not served by occupancy ❑Complies Requirement will be met.
C405.2.2. sensors (per C405.2.1.1) have time- ❑Does Not
1 switch controls and functions detailed
[EL21]2 in sections C405.2.2.1. ❑Not Observable
ENot Applicable
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) ;,I, - 91 I k;k_'}t-'';
Project Title: Avi and Co Report date: 10/22/23,44
Data filename: Paiel/U§f/ 0 2 3
ASPEN
BUILDING DEPARTMENT
Section
# Rough-In Electrical Inspection Complies? Comments/Assumptions
& Req.ID
C405.2.4, Daylight zones provided with ❑Complies Exception: Requirement does not apply.
C405.2.4. individual controls that control the ❑Does Not
1, lights independent of general area
C405.2.4. lighting. See code section C405.2.3 Not Observable
2 Daylight-responsive controls for ❑Not Applicable
[EL23]2 applicable spaces,C405.2.3.1 Daylight
responsive control function and
section C405.2.3.2 Sidelit zone.
C405.2.5 Additional interior lighting power ❑Complies Requirement will be met.
[EL27]1 allowed for special functions per the ❑Does Not
approved lighting plans and is
automatically controlled and Not Observable
separated from general lighting. ❑Not Applicable
C405.7 Low-voltage dry-type distribution ❑Complies Requirement will be met.
[EL26]2 electric transformers meet the ❑Does Not
minimum efficiency requirements of
Table C405.6. Not Observable
❑Not Applicable
C405.8 Electric motors meet the minimum ❑Complies Exception: Requirement does not apply.
[EL27]2 efficiency requirements of Tables ❑Does Not
C405.7(1)through C405.7(4).
Efficiency verified through certification Not Observable
under an approved certification ❑Not Applicable
program or the equipment efficiency
ratings shall be provided by motor
manufacturer(where certification
programs do not exist).
C405.9.1, Escalators and moving walks comply ❑Complies Exception: Requirement does not apply.
C405.9.2 with ASME A17.1/CSA B44 and have ❑Does Not
[EL28]2 automatic controls configured to
reduce speed to the minimum Not Observable
permitted speed in accordance with ❑Not Applicable
ASME A17.1/CSA B44 or applicable
local code when not conveying
passengers.
C405.10 Total voltage drop across the ❑Complies Requirement will be met.
[EL29]2 combination of feeders and branch ❑Does Not
circuits <= 5%.
❑Not Observable
❑Not Applicable
C405.1.1 At least 90%of dwelling unit ❑Complies Exception: Requirement does not apply.
[EL3O]2 permanently installed lighting shall EDoes Not
have lamp efficacy >= 65 Im/W or
luminaires with efficacy>=45 Im/W Not Observable
or comply with C405.2.4 or C405.3. ❑Not Applicable
C405.11, 50%of 15/20 amp receptacles ❑Complies Exception: Requirement does not apply.
C405.11.1 installed in enclosed offices, ❑Does Not
[EL31]2 conference rooms, copy rooms, break
rooms, classrooms and workstations Not Observable
and > 25%of branch circuit feeders ❑Not Applicable
for modular furniture will have
automatic receptacle control in
accordance with C405.11.1.
Additional Comments/Assumptions:
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) I, ( - 91
Project Title: Avi and Co Report date:'10/2z/23
Data filename: Paiel/6§f/A0 2 3
ASPEN
BUILDING DEPARTMENT
Section
# Final Inspection Complies? Comments/Assumptions
& Req.ID
C303.3, Furnished O&M instructions for EComplies Requirement will be met.
C408.2.5. systems and equipment to the ❑Does Not
2 building owner or designated
[FI17]3 representative. ENot Observable
❑Not Applicable
C408.1.1 Building operations and maintenance EComplies Requirement will be met.
[FI57]1 documents will be provided to the ❑Does Not
owner. Documents will cover
manufacturers' information, ENot Observable
specifications, programming ❑Not Applicable
procedures and means of illustrating
to owner how building, equipment and
systems are intended to be installed,
maintained, and operated.
C408.2.5 Furnished as-built drawings for EComplies Requirement will be met.
[FI16]3 electric power systems within 90 days ❑Does Not
of system acceptance.
❑Not Observable
ENot Applicable
C408.3 Lighting systems have been tested to EComplies Requirement will be met.
[FI33]1 ensure proper calibration, adjustment, ❑Does Not
programming, and operation.
❑Not Observable
ENot Applicable
Additional Comments/Assumptions:
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) ;,I, - 91
Project Title: Avi and Co Report date: 10/22/23
Data filename: Paiel/d§f/ 0 2 3
ASPEN
BUILDING DEPARTMENT