Loading...
HomeMy WebLinkAboutFile Documents.904 E Cooper Ave.0039-2022-BRES (2) A DDRESS: 904 E COOPER AVE, ASPEN 1 PERMIT NUMBER: COMMUNITY DEVELOPMENT DEPARTMENT �41►, BUILDING PERMIT CONTACT SHEET '' FOR PLAN REVIEW QUESTIONS CITY C3FASPEN li ame Anne Grice Interiors _. ._. , Phone E-mail FDR INSPECTION QUESTIONS ame Tom Stevens-Hendrickson Construction Phone - -I . - I. • �� • OWNER _ E-mail ame •�� Phone Cell Phone ailing•ddress 509-511 West 24th St City New York City State NY 10011 ZIP E mail•dress marianne@boeskygallery.com OWNER'S AUTHORIZED AGENT ame Phone Cell Phone ailing •.dress City State ZIP E mail A.dress APPLICATION BEST CONTACT li Name Anne Grice Interiors - . Phone Cell Phone ailing 408 ABC Ste 201 As en City p State CO A. ding ZIP 81611 A.dress Anne@annegrice.com, whitney@annegrice.com ARCHITECT OR DESIGNER OF RECORD N:me See Above Phone Cell Phone Mailing A.dress City State ZIP E- ail A.dress CIVIL ENGINEER OF RECORD N.me Phone Cell Phone M.iling A..ress City State ZIP E- ail Ad•ress STRUCTUAL ENGINEER OF RECORD Na e Calvetti Engineering • 1-. -; . • . Phone Cell Phone Md resailings P.O. Box 4231 City Aspen A State CO ZIP 81611 E- ail Ad•ress alcengrg@aol.com GENERAL CONTRACTOR Na e Hendrickson Construction , ,• Phone Cell Phone Ma ling 130 Primrose Path Aspen Ad.ress City State CO ZIP 81611 E-mail tom@hendricksoninc.corn Add ess I he -by certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or c.ncel the provisions of any other state or local law regulating construction or the performance of construction. It is my responsibility to review the approved plans and any comments that are contained thereon and see that the structure and/or project is built in compliance with all applicable codes. Addi Tonally,I understand that I am responsible for ensuring that all sub-permits associated with my project are submitted to the City in compliance with the approved Master plan set.I understand that the City does not review sub-permits for compliance with the master plan set G SigCont actor %9 � �z .� n ure 2/21/2022 Date ❑ Check if you are a tested owner builder(single-family homes only).You must take a test and complete the owner/building affidavit. (CITY USE ONLY)Owner builder approved by: Date: Affidavit o lj CITY OF ASPENOctober2020 /29y2022 130 S. GALENA ST I ASPEN, CO 81611 BUILDING DEPAL ADDRESS: 904 E COOPER AVE, ASPEV PERMIT NUMBER: COMMUNITY DEVELOPMENT DEPARTMENT HOMEOWNER ASSOCIATION COMPLIANCE FORM '04 '' CITY OF ASPEN • All applications for a building permit within the City of Aspen are required to include a certification of compliance with applicable covenants and homeowner association policies. The certification must be signed by the property owner or attorney representing the property owner. The following certification shall accompany the application for a permit. ADDRESS 904 E Cooper Ave 2 273718231046 UNIT# PARCEL ID# I, the property owner, certify as follows: (pick one) ❑ This property is not subject to a homeowners association or other form of private covenant. ❑ This property is subject to a homeowners association or private covenant and the improvements proposed in this building permit do not require approval by the homeowners association or covenant beneficiary. This property is subject to a homeowners association or private covenant and the improvements proposed in this building permit have been approved by the homeowners association or covenant beneficiary. I understand the City of Aspen does not interpret, enforce, or manage the applicability, meaning, or effect of private covenants or homeowner association rules or bylaws. I understand that this document is a public document. Owner Signature Date 2/21/2022 Owner Printed Name Marianne Boesky OR Owner's Attorney Signature Date Owner's Attorney Printed Name ( CITY OF ASPENIanuary2018 130 S. GALENA ST I ASPEN, CO 81611 �2 >l1ILDING DEPARTMENT ADDRESS: 904 E COOPER AVE, ASPEN PERMIT NUMBER: COMMUNITY DEVELOPMENT DEPARTMENT VALUATION AFFIDAVITirit)%11101) 40,404 CITY OF ASPEN AFFIDAVIT POLICY All applications for a building permit within the City of Aspen are required to include a certification of compliance with building permit valuation requirements. The certification must be signed by the property owner or authorized representative. The following certification shall accompany the application for a permit. I, the property owner or authorized agent, understand and certify as follows: City of Aspen Ordinance No. 40, Series of 2016 adopts the 2015 International Residential Code (IRC) and International Building Code (IBC) with certain amendments. These codes define building valuation as follows: R108.3 Building permit valuations. Building permit valuation shall include total value of the work for which a permit is being issued, such as electrical, gas, mechanical, plumbing equipment, and other permanent systems, including materials and labor. 109.3 Building permit valuations. The applicant for a permit shall provide an estimated permit value at time of application. Permit valuations shall include total value of work, including materials and labor, for which the permit is being issued, such as electrical, gas, mechanical, plumbing equipment and permanent systems. If, in the opinion of the building official, the valuation is underestimated on the application,the permit shall be denied, unless the applicant can show detailed estimates to meet the approval of the building official. Final building permit valuation shall be set by the building official. City policy indicates that permit valuation includes materials and labor for the structure and mechanical, electrical, plumbing and gas, fire sprinkler and elevator systems and equipment. Permanent systems such as audio visual, lighting and HVAC controls are included in the total as are expenses directly related to construction such as equipment rental and contractor fees. Finish materials such as paint, floor coverings, tile, cabinets and counter tops are included in the permit valuation total. Costs such as architectural and engineering design fees, landscaping and planting, tap fees, development mitigation fees, trash removal, and cleaning are not included. I certify that the permit valuation entered on the permit application for this property complies with the above valuation requirements. I nd rs nd that this document is a public document. Owner Signature: Date:2/21/2022 Owner Printed Name: Marianne Boesky o r, Authorized Agent Signature: Date: Authorized Agent Printed Name: • nV/2A/9 22 CITY OF ASPEN January zo19 130 S. GALENA ST I ASPEN, CO 8161' 1J ADDRESS: 904 E COOPER AVE,ASPEN PERMIT NUMBER: COMMUNITY DEVELO " MENT DEPARTMENT ASBESTOS VERIFICATI 0 N AND CHECKLIST Nd oi3O 004 ,044 ASPEN CITY OF ASPEN ASBESTOS INFORMATION Asbestos is a known human carcinogen and i•an airborne hazard.Once airborne,asbestos fibers can stay suspended in the air for days, weeks, or even months before settling out of he air.The fibers can easily become airborne again from a minor disturbance like turning on an air conditioner. Uncontrolled asbestos .batement projects or renovation projects that disturb asbestos may cause latent asbestos hazards that could expose people to asbestos in the future, long after the renovation activity occurred.The airborne asbestos fiber concentrations resulting from disturbances m:y result in a significant exposure to the current and future occupants of the home. The 1989"ban"on asbestos-containing materials is commonly misunderstood. In fact, in 1991 the U.S. Fifth Circuit Court of appeals vacated much of the so-called "Asbestos Ban .nd Phaseout Rule"and remanded it to the EPA.Thus, much of the original 1989 EPA ban on the U.S. manufacturing, importation, proc:ssing, or distribution in commerce of many asbestos-containing product categories was set aside and DID NOT TAKE EFFECT.Therefor:,ALL demolition, remodel or renovation projects must determine if disturbed material above the trigger levels contains asbestos. ASBESTOS CHECKLIST ❑✓ YespNo Residential: Will you be removing mor• than 32 sq ft, 50 linear feet (e.g., pipe insulation), or the volume equivalent of a 55-gallon drum of any aterial besides concrete, wood, bricks, or steel-examples are drywall, linoleum, ceiling tiles, roofing material., etc.? ❑Yes El No Commercial: Will you be removing mo e than 160 sq ft, 260 linear feet (e.g., pipe insulation), or the volume equivalent of a 55-gallon drum of any aterial besides concrete, wood, bricks, or steel-examples are drywall, linoleum, carpet, carpet adhesives, ceiling tiles, roofing materials, etc.? If the answer is YES to any of the abov-, you will need an asbestos test before you can receive a building and/ or demolition permit. You will also ne:d to provide plans indicating areas to be demolished and determine if a CO state demolition license is require.. A state certified asbestos inspector must do this test and the test report must be submitted with the building permit application. If the building has asbestos, a state certified asbestos abatement firm must remove it. After r•moval, the abatement firm must provide a letter to the Building Department stating that all the asbesto. has been removed and that the air is clean. This letter must be received BEFORE a permit will be issued. (See th, local or statewide Yellow Pages, DexOnLine, or http://www.cdphe.state. co.us/ap/asbestos/index.html for certified asbestos inspectors and abatement companies. ALWAYS ask for proof of current state certification.) If you are demolishing the building, yo must submit a demolition permit app with the CDPHE in addition to the Aspen permit app. This form may be fo nd at https://www.colorado.gov/pacific/cdphe/asbestos-forms NOTE: A copy of this demolition permit app m st be submitted with the initial building permit application. When the CDPHE approves the app, their issued p rmit must be given to the Aspen Building Dept before we issue our permit. I hereby certify that the above informa.'on is true and complete. Owner Phone #970-429-4148 Applicant (print name) V\JOQ, 1vion Phone#970-319-0699 Applicant Signature ;',L/W' osgir , ',{� Date 2/21/2022 Please call the City of Aspen En,/'ronmen al Health Department at 920-5039 at any time if you have q estibn`s about asbestos, interpreting your test re'ults, or other matters. I C TY OF ASPEN August2017 n'�/29/ ' 130 S. GALENA ST I ASPEN, CO 8i6, LiJ 3UILDINC DEPARTMENT ADDRESS: PERMIT NUMBER: COMMUNITY DEVELOPMENT DEPARTMENT .40 44400 ZONING COMPLIANCE VERIFICATION POLICY CITY OF ASPEN Applicability: All development projects must comply with the City's zoning regulations, including height and location, and are subject to periodic inspection during construction and a final inspection prior to project completion. When required by the City's Zoning Officer, certain development projects within the City of Aspen shall verify height and/or location compliance through submission of a survey report. Unless otherwise exempted, all commercial, multi-family, lodging, and mixed-use projects proposed within one foot of the maximum permissible height or within one foot of allowable setbacks shall verify zoning compliance through this method. In addition, the Zoning Officer may require this method be used to verify zoning compliance for single-family/ duplex development or other projects where compliance may be in question. Independent of this policy, all projects must comply with all applicable zoning limitations. The Zoning Officer will inform the applicant during building permit review if verification will be required. However, circumstances may require zoning compliance verification of a project which is already underway. Timing: Height verification should be accomplished at a point of construction when enough roof structure is in place to accurately measure the structure yet early enough in the process to still make changes if the structure is too tall. Location verification should be accomplished at a point of construction when the final exterior of the structure can be accurately measured in relation to setback requirements. Applicants are encouraged to confer with the Zoning Officer regarding the timing of zoning compliance verification. Applicants are encouraged to perform their own verification during construction to ensure the building is progressing to plan, including the height and location of foundation forms prior to concrete pours. 5 urvey Report:A Colorado Professional Land Surveyor shall describe and depict the height and location of a structure compared to the dimensions shown on the zoning sheets of the approved building permit plan set. The City's Zoning Officer can assist in determining which elements of the structure should be measured and if natural or finished grade should be used. The report shall include the following information: 1-A brief cover letter with the building permit number, name of the project, name of the owner and general contractor, with a written description of the measurement methods including date(s) of measurement. 2-For location verification:A plan drawing showing property boundaries, permitted setbacks, building envelope (ic applicable), location of foundation walls, location of the outermost exterior of each structure (inclusive of all exterior veneer or other exterior treatments), and the location and dimension of each observed measurement. 3-For height verification: Elevation drawing(s) showing the natural or finished grade of the property, maximum permitted height, building elevations including the nominal roof form (inclusive of the first layer of exterior sheathing or weatherproofing membrane but excluding all exterior surface treatments such as shakes, shingles,or other veneer treatments orornamentation), and the location and dimension of each observed meaSuremen '\ Additional roof plans showing location of measurements may be necessary. C TY OF ASPEN August 2017 130 S. ��zy��022 . GALENA ST I ASPEN, CO 816 _1) iiLDING DEPAR EN1 T PERMIT NUMBER: ADDRESS: COMMUNITY DEVELOPMENT DEPARTMENT ZONING COMPLIANCE VERIFICATION POLICY 41 01 • CITY OF ASPEN • 4-Plans and elevations must include height or setback exemption items unique to the building, such as stair/ , elevator overruns, utility/mechanical apparatus, hot tubs and spas, and other height or setback exempt-ion items unique to the project. 5-The report shall include a written description or drawing notes of the benchmarks or control points used to establish property boundaries, setbacks, building location, building height,and grades for each measurement. 6-All drawings must correlate with the building locations, elevations, and grading/drainage representations in the approved building permit set. 7-The report must include the signature, date, and stamp of Colorado Professional Land Surveyor who conducted the field measurements certifying that the field measurements areaccurately represented. Review and Acceptance of Report: The Zoning Officer shall review the report(s) and either confirm the project conforms to the dimensions shown on :he zoning sheets of the approved building permit plan set and meets the zoning limitations for the property or shall determine which elements of the project are not in compliance. The Zoning Officer may request additional information to verify zoning compliance, which may include but is not limited to additional survey work or a site visit. All drawings of the survey report must correlate with representations in the approved building permit set for acceptance. Modifications to field cond tons or amendments to the building permit may be required. A determination of non-compliance shall result in the issuance of a correction notice and possible work stoppage. Applicants are encouraged to verify zoning compliance as early as reasonably practical in the construction process to minimize disruption to the construction schedule. Acknowledgment: I (contractor name) , Dm G-i-even understand this policy. I agree that this project will comply with the zoning limitations affecting this parcel and the representations made on the zoning sheets of the approved building permit plans. I understand that a Certificate of Occupancy will not be issued until this project complies with all applicable zoning limitations. Contractor Signature: /� ��Zr `ex� Date: Z �I J 2 2— d� - CITY OF ASPEN r' i/.,y/2 22 I 130 S. GALENA ST I ASPEN, CO 81611{{ 1