Loading...
HomeMy WebLinkAboutFile Documents.731 E Durant Ave.0031-2023-BRES (4) ADDRESS: 731 E DURANT AVE #7 PERMIT NUMBER: I , COMMUNITY DEVELOPMENT DEPARTMENT i BUILDING PERMIT CONTACT SHEET t.' Er FOR PLAN REVIEW QUESTIONS Name CHERIE N STORM ' ' i •- '. ' . - ` • ' , . • Phone E-mail FOR INSPECTION QUESTIONS Name PAUL DIMENTO Phone - "-• i V E-mail r e I do ip r • 1 OWNER Name Phone Cell Phone Mailing 3007 BAY SHORE RD SARASOTA FL 34234 Address City State ZIP E-mail art14@aoI.com Address OWNER'S AUTHORIZED AGENT Name CHERIE N STORM Phone Cell Phone 41 ii Mailing Address 600 CARRIAGE WAY K14 City SNOWMASS State ZIP CO 81615 E-mail Address STORMDESIGNSASPEN@GMAIL.COM APPLICATION BEST CONTACT Name CHERIE N STORM Phone Cell Phone 4 ii Mailing Address 600 CARRIAGE WAY K14 City State SNOWMASS CO ZIP 81615 E-mail Address STORMDESIGNSASPEN@GMAIL.COM ARCHITECT OR DESIGNER OF RECORD Name CHERIE N STORM Phone Cell Phone i Mailing Address 600 CARRIAGE WAY K14 City SNOWMASS State CO ZIP 81615 E-mail Address STORMDESIGNSASPEN@GMAIL.COM CIVIL ENGINEER OF RECORD Name N/A 1 ' 1 • Phone Cell Phone Mailing N/A N/A N/A N/A Address City State ZIP E-mail N/A Address STRUCTUAL ENGINEER OF RECORD Name MICHAEL"MIC"BACA Phone Cell Phone � ' i i Mailing Address 111 EAST 3RD STREET SUITE 202 City RIFLE State CO ZIP 81650 E-mail Address studiom.engineer@gmail.com GENERAL CONTRACTOR Name PAUL DIMENTO ' °- '-' i U I] Ell Phone Cell Phone � $�� 7 BUCKSKIN COURT CARBONDALE CO 81623 I magdad J Mailing oan /zoiz'a Address City State ZIP _ ZONING E-mail Address MTN-CONST@COMCAST.NET I hereby certify that I have read and examined this application and know the same to be true and coarrect. All provisions of laws and ordinance governing this type of work will be complied with whether specified herein or not. The granting of permit does not presume to gi‘141* r aaor cancel the provisions of any other state or local law regulating construction or the performance of construction. It is my responseview9T2.02,3approved plans and any comments that are contained thereon and see that the structure and/or project is built in compliance with u�')cddes.Additionally,I understand that I am responsible for ensuring that all sub-permits associated with my project are submitted to th co,m,i,`i,�I.? � with the approved Master plan set.I understand that the City does not review sub-permits for compliance with the master plan set saltli SigntafuFe �{ Date 01/16/2023 ❑ c�' v a testedSr E IV E D. Che If ou are a ovyrrfer bfxrfder(single- amity homes only).You must take a test and complete the owner/b it I g a davlf. (CITY USE ONLY) Owner builder approved by: Date:N/A Affidavit ondi1e/16/2023 ( CITY OF ASPEN November2022 427 RIO GRANDE PL I ASPEN, COV81, LJ) BUILDING DEPARTMENT f ADDRESS: 731 E DURANT AVE#7 PERMIT NUMBER: COMMUNITY DEVELOPMENT DEPARTMENT HOMEOWNER ASSOCIATION COMPLIANCE FORM All applications for a building permit within the City of Aspen are required to include a certification of compliance with applicable covenants and homeowner association policies. The certification must be signed by the property owner or attorney representing the property owner. The following certification shall accompany the application for a permit. 731 E DURANT AVE, ASPEN CO, 81615 #7 273718210043 ADDRESS UNIT# PARCEL ID# I,the property owner, certify as follows: (pick one) ❑ This property is not subject to a homeowners association or other form of private covenant. ❑ This property is subject to a homeowners association or private covenant and the improvements proposed in this building permit do not require approval by the homeowners association or covenant beneficiary. 0 This property is subject to a homeowners association or private covenant and the improvements proposed in this building permit have been approved by the homeowners association or covenant beneficiary. I understand the City of Aspen does not interpret,enforce,or manae the applicability, meaning, or effect of private covenants or homeowner association rules or bylaws. I understand that this document is a public document. O , f Date 01/16/2023 Owner Signature Owner Printed Name ARTH U R DAY OR AI q Owner's Attorney Signature Date 'V,~ Owner's Attorney Printed Name N/A * . W4/1°12° 3 o"'sami lY vai 1-11tVl� 1 ma7 2 61)1 03/17/2023 ZONING RECE ( CITY OF ASPEN November2022 427 RIO GRANDE PL I ASPEN, Cb$, 143 ASPEN BUILDING DEPARTMENT 731 E DURANT AVE #7 ADDRESS: PERMIT NUMBER: COMMUNITY DEVELOPMENT DEPARTMENT ,,''►►. VALUATION AFFIDAVIT CITY OF ASPEN • AFFIDAVIT POLICY All applications for a building permit within the City of Aspen are required to include a certification of compliance with building permit valuation requirements. The certification must be signed by the property owner or authorized representative. The following certification shall accompany the application for a permit. I, the property owner or authorized agent, understand and certify as follows: City of Aspen Ordinance No. 40, Series of 2016 adopts the 2015 International Residential Code (IRC) and International Building Code (IBC) with certain amendments. These codes define building valuation as follows: R108.3 Building permit valuations. Building permit valuation shall include total value of the work for which a permit is being issued, such as electrical, gas, mechanical, plumbing equipment, and other permanent systems, including materials and labor. 109.3 Building permit valuations. The applicant for a permit shall provide an estimated permit value at time of application. Permit valuations shall include total value of work, including materials and labor, for which the permit is being issued, such as electrical, gas, mechanical, plumbing equipment and permanent systems. If, in the opinion of the building official, the valuation is underestimated on the application,the permit shall be denied, unless the applicant can show detailed estimates to meet the approval of the building official. Final building permit valuation shall be set by the building official. City policy indicates that permit valuation includes materials and labor for the structure and mechanical, electrical, plumbing and gas, fire sprinkler and elevator systems and equipment. Permanent systems such as audio visual, lighting and HVAC controls are included in the total as are expenses directly related to construction such as equipment rental and contractor fees. Finish materials such as paint, floor coverings, tile, cabinets and counter tops are included in the permit valuation total. Costs such as architectural and engineering design fees, landscaping and planting, tap fees, development mitigation fees, trash removal, and cleaning are not included. -44 I certify that the permit valuation entered on the permit application for this property complies t ,1 � valuation requirements. I understand that this document is a public document. 0� 2023 Owner Signature: Date: 01/16/2023 04/1„not��10 4 Owner Printed Name: ARTHUR DAY aml or, 41g5 • Authorized Agent Signature: Date: N/A 7/2023 J ZONING Authorized Agent Printed Name: CHERIE N STORM RECEIVE 02/ 20 ( CITY OF ASPEN 427 RIO GRANDE PL I ASPEN, CO November 2022 81611J _i i_I BUILDING DEPARTMENT ADDRESS: 731 E DURANT AVE#7 PERMIT NUMBER: COMMUNITY DEVELOPMENT DEPARTMENTiPp 00; ASBESTOS VERIFICATION AND CHECKLIST CITY OF ASPEN • ASBESTOS INFORMATION Asbestos is a known human carcinogen and is an airborne hazard.Once airborne,asbestos fibers can stay suspended in the air for days, weeks, or even months before settling out of the air.The fibers can easily become airborne again from a minor disturbance like turning on an air conditioner. Uncontrolled asbestos abatement projects or renovation projects that disturb asbestos may cause latent asbestos hazards that could expose people to asbestos in the future, long after the renovation activity occurred.The airborne asbestos fiber concentrations resulting from disturbances may result in a significant exposure to the current and future occupants of the home. The 1989"ban"on asbestos-containing materials is commonly misunderstood. In fact, in 1991 the U.S. Fifth Circuit Court of appeals vacated much of the so-called "Asbestos Ban and Phaseout Rule"and remanded it to the EPA.Thus, much of the original 1989 EPA ban on the U.S. manufacturing, importation, processing,or distribution in commerce of many asbestos-containing product categories was set aside and DID NOT TAKE EFFECT.Therefore,ALL demolition, remodel or renovation projects must determine if disturbed material above the trigger levels contains asbestos. ASBESTOS CHECKLIST Dyes❑ No Residential: Will you be removing more than 32 sq ft, 50 linear feet (e.g., pipe insulation), or the volume equivalent of a 55-gallon drum of any material besides concrete, wood, bricks, or steel-examples are drywall, linoleum, ceiling tiles, roofing materials, etc.? ❑Yes❑ No Commercial: Will you be removing more than 160 sq ft, 260 linear feet (e.g., pipe insulation), or the volume equivalent of a 55-gallon drum of any material besides concrete, wood, bricks, or steel-examples are drywall, linoleum, carpet, carpet adhesives, ceiling tiles, roofing materials, etc.? If the answer is YES to any of the above, you will need an asbestos test before you can receive a building and/ or demolition permit. You will also need to provide plans indicating areas to be demolished and determine if a CO state demolition license is required. A state certified asbestos inspector must do this test and the test report must be submitted with the building permit application. If the building has asbestos, a state certified asbestos abatement firm must remove it. After removal, the abatement firm must provide a letter to the Building Department stating that all the asbestos has been removed and that the air is clean. This letter must be received BEFORE a permit will be issued. (See the local or statewide Yellow Pages, DexOnLine, or http://www.cdphe.state. co.us/ap/asbestos/index.html for certified asbestos inspectors and abatement companies. ALWAYS ask for proof of current state certification.) If you are demolishing the building, you must submit a demolition permit app with the CDPHE in addition to the Aspen permit app. This form may be found at https://www.colorado.gov/pacific/cdphe/asbestos-forms NOTE: A copy of this demolition permit app must be submitted with the initial building permit application. Why CDPHE approves the app, their issued permit must be given to the Aspen Building Dept before i‘ permit. 10/2°23 CAI I hereby certify that the above information is true and complete. ami OwnerARTH U R DAY Phone #9415872329 OVIIIEWED CH ERI E N STORM 970-379-4180 magdad Applicant (print name) Phone# ZONING Applicant Signature Date 01 /16/2023 Please contact the Building Department at buildingsupport@aspen.gov at any time if you have RECEIVED asbestos, interpreting your test results, or other matters. 02/16/202.2 CITY OF ASPEN November2022 427 RIO GRANDE PL I ASPEN, CO 81611J 1 ADDRESS: PERMIT NUMBER: COMMUNITY DEVELOPMENT DEPARTMENT ;�11�,/ ZONING COMPLIANCE VERIFICATION POLICY CITY OFASPEN • • Applicability: All development projects must comply with the City's zoning regulations, including height and location, and are subject to periodic inspection during construction and a final inspection prior to project completion. When required by the City's Zoning Officer, certain development projects within the City of Aspen shall verify height and/or location compliance through submission of a survey report. Unless otherwise exempted, all commercial, multi-family, lodging, and mixed-use projects proposed within one foot of the maximum permissible height or within one foot of allowable setbacks shall verify zoning compliance through this method. In addition, the Zoning Officer may require this method be used to verify zoning compliance for single-family/ duplex development or other projects where compliance may be in question. Independent of this policy, all projects must comply with all applicable zoning limitations. The Zoning Officer will inform the applicant during building permit review if verification will be required. However, circumstances may require zoning compliance verification of a project which is already underway. Timing: Height verification should be accomplished at a point of construction when enough roof structure is in place to accurately measure the structure yet early enough in the process to still make changes if the structure is too tall. Location verification should be accomplished at a point of construction when the final exterior of the structure can be accurately measured in relation to setback requirements. Applicants are encouraged to confer with the Zoning Officer regarding the timing of zoning compliance verification. Applicants are encouraged to perform their own verification during construction to ensure the building is progressing to plan, including the height and location of foundation forms prior to concrete pours. Survey Report: A Colorado Professional Land Surveyor shall describe and depict the height and location of a structure compared to the dimensions shown on the zoning sheets of the approved building permit plan set. The City's Zoning Officer can assist in determining which elements of the structure should be measured and if natural or finished grade should be used. The report shall include the following information: 1-A brief cover letter with the building permit number, name of the project, name of the owner and general contractor, with a written description of the measurement methods including date(s) of measurement. 2-For location verification: A plan drawing showing property boundaries, permitted setbacks, building envel T- V applicable), location of foundation walls, location of the outermost exterior of each structure (i .� exterior veneer or other exterior treatments), and the location and dimension of each observe 10m' 2.3 041 3-For height verification: Elevation drawing(s) showing the natural or finished grade of the prop :q�,._" I permitted height, building elevations including the nominal roof form (inclusive of the first layer of ext-r• s sheathing or weatherproofing membrane but excluding all exterior surface treatments such as shakes, shingles, or other veneer treatments orornamentation), and the location and dimension of each observed rT a' ` 1. ■ Additional roof plans showing location of measurements may be necessary. 0 lllL �I~=i " '' '' :1 � magdad 32023 ZONING 02/16/2042 CITY OF ASPEN November2022 427 RIO GRANDE PL I H,rclJ, CO 81611J PERMIT NUMBER: ADDRESS: COMMUNITY DEVELOPMENT DEPARTMENT : 4 4110. 0, ZONING COMPLIANCE VERIFICATION POLICY 4-Plans and elevations must include height or setback exemption items unique to the building, such as stair/ elevator overruns, utility/mechanical apparatus, hot tubs and spas, and other height or setback exemption items unique to the project. 5-The report shall include a written description or drawing notes of the benchmarks or control points used to establish property boundaries, setbacks, building location, building height,and grades for each measurement. 6-All drawings must correlate with the building locations, elevations, and grading/drainage representations in the approved building permit set. 7-The report must include the signature, date, and stamp of Colorado Professional Land Surveyor who conducted the field measurements certifying that the field measurements areaccurately represented. Review and Acceptance of Report: The Zoning Officer shall review the report(s) and either confirm the project conforms to the dimensions shown on the zoning sheets of the approved building permit plan set and meets the zoning limitations for the property or shall determine which elements of the project are not in compliance. The Zoning Officer may request additional information to verify zoning compliance, which may include but is not limited to additional survey work or a site visit. All drawings of the survey report must correlate with representations in the approved building permit set for acceptance. Modifications to field conditions or amendments to the building permit may be required. A determination of non-compliance shall result in the issuance of a correction notice and possible work stoppage. Applicants are encouraged to verify zoning compliance as early as reasonably practical in the construction process to minimize disruption to the construction schedule. Acknowledgment: - I (contractor4�ame) 7l�',,, �� u erstand this policy. I agree that this project will comply with the zoning limitations affecting this parcel and the representations made on the zoning sheets of the approved building permit plans. I understand that a Certificate of Occupancy will not be issued until this project complies with all applicable zoning limitations. r Contractor Sigr�ature� � Date: 0t 46 // '/ V!4% LR+"Sami I • iu 03/17/2023 f a . . r_,a ZONING 02/16/20 3 CITY OF ASPEN November2022 427 RIO GRANDE PL I ASPEN, CO 81g j BUILDING DEPARTMENT