Loading...
HomeMy WebLinkAboutFile Documents.341 Park Ave.0072-2022-BRES (14) CONSTRUCTION MANAGEMENT PLAN 341 PARK AVE, ASPEN itto,"7 j f•.,•••,. .1 1 P 4 1. .n i IA id:114 dea kit�i ; '. . 0. Iplor Ilk I �.1 ' , • MIDLAND PARK .. 4. • ___ . ••.,. •,� ,, 11-r1 ....: .. 4... . , FAMPin r UN ME • kre_ 4r I4N it .!. N:. 't:... f Mk or .. 11141414"111 4.11:1111.1121*ihr 4‘ a".;411;...11111%iimer:4 .411:1, IQUI 11; . . ............... *'tti oil Ir; r ` �r/ t..,,, •-: - dallp 4 . Nptoli. err D i‘pgis ' -' --7, a - j''. • #1..a • . ,ii I f ,� - . CONTACTS: OWNER: David Near 512 656 1971 CONTRACTOR: Giant Properties, Inc. 970 688 1804 SITE SUPERVISOR: John Mudrey 724 815 5984 FOREMAN: Eliseo Chavez 970 319 4546 DESCRIPTION: This project includes changing the doors out to the deck from swing doors to sliders, also changing the structural elements of the front entry portico from logs to steel I-beams, with a new trim detail around the garage door switching from logs to steel c-channel. Adding a new window in the wall adjacent to the front entry door and replacing the garage door with a new door of the same size. RECEIVED 07/15/2022 ASPEN BUILDING DEPARTMENT The property is a condo and part of a 2-condo property at the end of the cul-de-sac. There is no formal HOA. The neighbor is aware of the project and does not live locally. He has given permission for us to park in his driveway if we need to. The project will not have any impact on public utilities, stormwater drains or water mains. IMPLEMENTATION: The project will begin immediately upon the issuance of the permit. There is good access and the scope is minor and should be completed within 3-4 weeks. Work will be performed during allowed hours only(7:30am-5:30pm, Mon-Fri, and occasionally on Saturdays between 9am-5pm) WASTE REMOVAL: The demo will consist of removal of rock veneer where necessary, which will be removed and dumped. The wood logs and veneers will be moved to our storage warehouse for potential re-use on other projects or recycling. Any additional waste and/or demo material will be exported offsite via dump trailer parked onsite and removed as needed. We anticipate max 1-2 loads of waste and debris to be removed. Waste from personnel such as drinks cans, lunch wrappers, etc. will be maintained inside the unit and recycled or removed along with other household garbage. There will be no soil disturbance on this project. There will be no trees affected since there are no trees withing the area of scope of work. NOISE & SUPPRESSION: 70 dB during the on season There will not be any loud continuous noise in excess of 80 decibels—we do not anticipate use of noisy equipment or noisy operations, only drills, saws and hand tools. There will not be use of any heavy equipment. There may be a boom truck involved in the delivery of steel onsite. PARKING & STAGING: Staging will be performed onsite. There will be few subcontractors involved and not more than two or three onsite at a time—therefore we do not anticipate any parking issues. There is ample room to park in driveway since the neighbor also has permitted us to park in his drive and won't be in residence. There will not be any obstruction to the public right of ways, or streets at any time during this minor project. PERMITS: The full plan set for permitting is attached with this CMP including all relevant drawings. There are no associated permits expected to be required. RECEIVED 07/15/2022 ASPEN BUILDING DEPARTMENT