HomeMy WebLinkAboutFile Documents.341 Park Ave.0072-2022-BRES (13) CONSTRUCTION MANAGEMENT PLAN
341 PARK AVE, ASPEN
itto,"7 j f•.,•••,. .1 1 P 4 1. .n i IA
id:114
dea
kit�i ; '. . 0. Iplor
Ilk I
�.1 ' ,
•
MIDLAND PARK
.. 4.
• ___
. ••.,.
•,� ,, 11-r1 ....:
.. 4... . ,
FAMPin r UN ME
• kre_ 4r I4N it .!. N:. 't:... f Mk or
.. 11141414"111 4.11:1111.1121*ihr 4‘ a".;411;...11111%iimer:4 .411:1, IQUI 11; . . ...............
*'tti
oil Ir;
r ` �r/ t..,,, •-: - dallp 4 .
Nptoli. err D
i‘pgis ' -' --7, a - j''. • #1..a • . ,ii I
f ,� - .
CONTACTS:
OWNER: David Near 512 656 1971
CONTRACTOR: Giant Properties, Inc. 970 688 1804
SITE SUPERVISOR: John Mudrey 724 815 5984
FOREMAN: Eliseo Chavez 970 319 4546
DESCRIPTION:
This project includes changing the doors out to the deck from swing doors to sliders, also
changing the structural elements of the front entry portico from logs to steel I-beams, with a new
trim detail around the garage door switching from logs to steel c-channel. Adding a new window
in the wall adjacent to the front entry door and replacing the garage door with a new door of the
same size.
RECEIVED
07/15/2022
ASPEN
BUILDING DEPARTMENT
The property is a condo and part of a 2-condo property at the end of the cul-de-sac. There is no
formal HOA. The neighbor is aware of the project and does not live locally. He has given
permission for us to park in his driveway if we need to.
The project will not have any impact on public utilities, stormwater drains or water mains.
IMPLEMENTATION:
The project will begin immediately upon the issuance of the permit. There is good access and the
scope is minor and should be completed within 3-4 weeks.
Work will be performed during allowed hours only(7:30am-5:30pm, Mon-Fri, and occasionally
on Saturdays between 9am-5pm)
WASTE REMOVAL:
The demo will consist of removal of rock veneer where necessary, which will be removed and
dumped. The wood logs and veneers will be moved to our storage warehouse for potential re-use
on other projects or recycling.
Any additional waste and/or demo material will be exported offsite via dump trailer parked onsite
and removed as needed. We anticipate max 1-2 loads of waste and debris to be removed.
Waste from personnel such as drinks cans, lunch wrappers, etc. will be maintained inside the unit
and recycled or removed along with other household garbage.
There will be no soil disturbance on this project.
There will be no trees affected since there are no trees withing the area of scope of work.
NOISE & SUPPRESSION:
There will not be any loud continuous noise in excess of 80 decibels—we do not anticipate use of
noisy equipment or noisy operations, only drills, saws and hand tools. There will not be use of
any heavy equipment. There may be a boom truck involved in the delivery of steel onsite.
PARKING & STAGING:
Staging will be performed onsite. There will be few subcontractors involved and not more than
two or three onsite at a time—therefore we do not anticipate any parking issues. There is ample
room to park in driveway since the neighbor also has permitted us to park in his drive and won't
be in residence. There will not be any obstruction to the public right of ways, or streets at any
time during this minor project.
PERMITS:
The full plan set for permitting is attached with this CMP including all relevant drawings. There
are no associated permits expected to be required.
RECEIVED
07/15/2022
ASPEN
BUILDING DEPARTMENT