HomeMy WebLinkAboutagenda.council.worksession.20251006AGENDA
CITY COUNCIL WORK SESSION
October 6, 2025
4:10 PM, City Council Chambers
427 Rio Grande Place, Aspen
I.Work Session
I.A City of Aspen Financial Update
I.B 2026 Propose Budget Work Session 1 - Economic Overview and Big Picture
Considerations
I.C Pedestrian Mall Safety Initiative Work Session
II.Council discussion of the items published in the most recent information update,
as needed
Zoom Meeting Instructions
Join from PC, Mac, iPad, or Android:
https://us06web.zoom.us/j/81319481399?
pwd=lCmPdDPSmKaHk2WtRMfQEvFPcBeQWY.1
Passcode:81611
Join via audio:
+1 346 248 7799 US
Webinar ID: 813 1948 1399
Passcode: 81611
International numbers available: https://us06web.zoom.us/u/kyOA1AqLx
October 6, 2025 - Financial Update - Final.pdf
2026 Budget Work Session 1 - Kick Off slides.pdf
251006_Ped_Mall_Safety_Worksession_Accessible_Final.docx
Council Presentation_251001.pdf
1
1
October 6, 2025Tyler Sexton – Interim Finance DirectorMatt Grau – Budget ManagerFinancial Update2
2025 Taxable Sales (Thru July)July % vs 20242025 (Thru July)2024Industry7%$248,736,470$231,384,392Accommodations3%$138,565,708$133,906,362Restaurants10%$106,329,948$96,977,781Fashion Clothing23%$93,400,488$76,243,202Miscellaneous125%$92,128,812$40,921,175Construction8%$49,608,667$45,727,305Food & Drug-20%$45,184,615$56,823,628Jewelry/Gallery-3%$43,550,416$44,908,864Sports Equip/Clothing-5%$28,408,598$29,852,201Utilities-1%$10,958,918$11,055,196Liquor/Cannabis-84$3,089,672$19,587,833Automobile9%$858,600,061$787,387,940Taxable SalesBiggest SHIFT Since April:Accommodations: 2% → 7% (+5 pts)Miscellaneous: 16% → 23% (+7 pts)Jewelry/Gallery: -54% → -20% (+34 pts)Biggest SHIFT Since April:Restaurants/Bars: 20% → 3% (-17 pts)Fashion Clothing: 17% → 10% (-7 pts)Automobile: -77% → -84% (-7 pt)Makes up 57% of the local economyReporting under Vehicle Use Tax +17% over 2024.3
2.4% Sales Tax Collections2025 Midyear Update % increaseTax CollectionsBudget Assumptions5%$32,652,20020253%$33,658,70020262026 Projections2025 ProjectionsDedicated Use$21,391,500$20,801,1001.5% Parks and Open Space$2,139,100$2,080,1000.15% Transportation$1,604,400$1,560,100Portion of 0.45% Affordable Housing (25% share)$4,813,000$4,680,200Portion of 0.45% Kids First (75% share)$4,278,300$4,160,2000.30% Public Education (2026 sunset)$34,226,300$33,281,700Annual Tax ProjectionsFiscal Year 2024: $31.1M2025+7%increase over 2024+630K additional collections2026+2.84% increase over 2025+$568k additional collections% IncreaseTax CollectionsUpdated Forecast7%$33,281,70020252.84%$34,226,30020264
Lodging Taxes2025 Midyear Update % increaseTax CollectionsBudget Assumptions1.5%$12,929,30020253%$13,317,00020262026 Projections2025 ProjectionsLodging Type$5,170,000$5,018,000STR - Classic$1,990,000$1,931,000STR – Lodging Exempt$110,000$110,500STR – Owner Occupied$7,270,000$7,059,500STR’s (5% / 10%)$6,150,000$5,973,200Lodging / Hotel (2%)$13,420,000$13,148,100Total Lodging CollectionsFiscal Year 2024: $12.7MUpdated Forecast:2025 & 2026: +3% growthNet Gain: +321k over prior forecast% IncreaseTax CollectionsUpdated Forecast3%$13,148,10020253%$13,420,00020265
Real-estate Transfer Tax Collections2025 Midyear Update (Thru Aug)Fiscal Year 2024: $23.8M• Housing: $15.8M• Arts & Culture: $8M• 2025 Trend:• Transactions 10%• Cash Value up 8%• 2026 outlook: Holding flat at $25.7M due to market volatilityTax CollectionsUpdated Forecast$25,718,0002025$25,700,00020262025 (Thru Aug)418Number of Transactions$1,129,504,423Total Cash Value$2,702,164Average Cash Value$16,716,339Actual Tax ReceiptsAffordable Housing Fund $11,068,594Arts and Culture Fund $5,647,7452025 EstimateAffordable Housing Fund $17,029,000Arts and Culture Fund $8,689,0002026 EstimateAffordable Housing Fund $17,029,000Arts and Culture Fund $8,689,000Tax CollectionsBudget Assumptions$26,751,0002025$26,800,00020266
October 6, 2025
2026 Proposed
Budget
Work Session # 1
7
New Format for 2025
Budget Work Session Agenda
•Focus on Council Priority Projects, Goals, and Guiding Principles
o What’s been accomplished?
o What is proposed ahead?
•2026 Budget & Budget Drivers
o Proposed Budget Financials
o Major Capital
o Supplemental Requests & Proposed Fee Change Highlights
•Important Issues
o Capital Planning, Putting Fund Reserves to use & Fund health
o Economic Outlook
o Organizational Resiliency & Customer Service
•Wrap Up
8
City Values
Service:We serve with a spirit of excellence, humility,
integrity, and respect.
Partnership:Our impact is greater together.
Stewardship:Investing in a thriving future for all by
balancing social, environmental, and financial
responsibilities.
Innovation:Pursuing creative outcomes grounded in
Aspen's distinctive challenges and opportunities.
9
Strategic Focus Areas
Safe & Lived in Community of Choice
•Ensure Aspen is an attractive, diverse, and safe city to live, work, and visit year-round. This includes
opportunities to access childcare, healthcare, housing, transit, parks, recreation, and technological connectivity.
Community Engagement:
•Ensure a trusted dialogue and relationship in the community that encourages participation, consensus building,
and meaningful engagement.
Protect Our Environment
•Ensure that policy decisions, programs, and projects manage impacts to the, climate, public health, and well-
being.
Smart Customer Focused Government
•Provide value to the community by continuously improving services and processes based on feedback, data,
best practices, and innovation.
Fiscal Health & Economic Vitality
•Promote the economic sustainability of the Aspen community by advancing a healthy, diverse local economy
while responsibly managing revenue streams, community investments, and financial reserves.
10
Reflection of Council
Priority Projects & Goals
2026 Proposed
Budget
5
11
Council Priority Project – Armory
Hall
• What have we accomplished?
– Design progress to 100% DD (design
development)
– Construction partner selected – Shaw
Construction
– Land Use entitlements granted
• What is next?
– Obtain building permits
– Construction start estimated 3
rd quarter
2026
– 2026 proposed capital budget includes
$13.0 million for Armory Hall project
6
12
Council Priority Project –
Lumberyard
• What have we accomplished?
– Phase 0 site demolition and site
infrastructure preparation
– Vertical construction partner selected –
Gorman & Company
• What is next?
– Debt question on Nov 2025 ballot
– Site infrastructure
– Obtain building permits
– Begin vertical construction
– 2026 proposed capital budget includes
$110.0 million for Lumberyard
7
13
Council Priority Project –
Entrance to Aspen
• What have we accomplished?
– CDOT bridge inspection completed June 2025
– Council provided direction to re-evaluate the
1998 record of decision, preferred alternative,
and EIS
– Approved a contract with Jacobs Engineering to
perform the re-evaluation, projected to take
roughly 15 months
• What is next?
– Future public open house meetings to review
results and proposed modifications to the
preferred alternative
– 2026 proposed capital budget includes no new
funding for the Entrance to Aspen. 2025 project
budget was sufficient to support the contract
with Jacobs Engineering.8
14
Council Goal – Early Childhood
Education
• What have we accomplished?
– Two 2025 work sessions with Kids First to evaluate
current support structures and proposed updates to
financial aid support and workforce teacher subsidies
– Council provided direction on how to proceed with
updates to financial aid and support of ongoing
teacher subsidies
– Financial review confirming the 152 Kids First Fund
can support the additional expenses for higher level
of support to families and teachers
• What is next?
– Future 2026 work session to review the initial results
of implementation
– 2026 proposed operating budget includes an ongoing
supplemental request of $600k to increase budget
authority supporting program expansion for financial
aid and teacher wage subsidies
9
15
Council Goal – Resource & Infrastructure Resilience
• What have we accomplished?
– 2025 adopted capital budget of $57.1 million
– Infrastructure improvements made up $18.7 million or 33% of the 2025 capital budget,
including Entrance to Aspen, Electric line and equipment upgrades, Water line upgrades,
stormwater stormpipe lining project, and downtown core parking improvements
– Building improvements included Lumberyard phase 0 site demo, Armory reuse design, Old
Powerhouse renovation, and Police Dept lobby upgrades
– Multi-department asphalt replacement project including Parks trails, ARC, Rio Grande
Recycling center, Golf course parking lot, Truscott, Marolt, and Aspen Country Inn lots
•What is next?
– 2026 proposed capital budget of $171.1 million
– Includes major capital investment into Lumberyard, Armory, & Water Treatment Plant
– Robust capital discussion planned for our 3
rd budget work session on Oct 20th
– Supplemental request for City’s share for regional 911 communications center operating
expenses
16
Council Goal – Traffic Flow &
Congestion Relief
• What have we accomplished?
– RFTA free fare fall pilot
– West End traffic calming; increased police
presence and traffic officer pilot position
– Hopkins Ave traffic flow and bike prioritization pilot
– Rubey Park Transit Center capital improvements
– Increased investment in We-Cycle
• What is next?
– New electric bus and shuttle vehicles expected
delivery in 2026
– 2026 proposed capital budget includes funding for
replacement of the Power Plant Rd bridge
– 2026 proposed supplemental for additional We-
Cycle stations and operating support in Aspen
– Annual hardscape sidewalk, curb, gutter, ADA
improvements, and road paving projects
11
17
2026 Proposed Budget
• Overarching Budget Message:
– Over the past several years, we have intentionally built up our fund balances
across multiple City funds to save for large future capital projects.
– In 2026 we are deploying those fund reserves towards generational projects
like the Lumberyard and Armory for the City of Aspen.
12
18
2026 Proposed Budget
2025 Orig.
Budget 2026 Budget $ Change %
Change
Revenues $206,698,878 $230,382,150 $23,683,272 11.5%
On-Going Ops Budget (Base) $108,430,398 $113,634,096 $5,203,698 4.8%
One-Time Supplementals $3,309,402 N/A ($3,309,402) N/A
New Supplementals N/A $7,812,599 $7,812,599 N/A
Total Operating $111,739,800 $121,446,695 $9,706,895 8.7%
Capital Outlay $57,102,210 $171,168,250 $114,066,040 199.8%
Debt Service $6,333,405 $3,651,470 ($2,681,935) (42.3%)
Net Appropriations $175,175,415 $296,266,415 $121,091,000 69.1%
Transfers $35,977,310 $43,428,362 $7,451,052 20.7%
Total Appropriations $211,152,725 $339,694,777 $128,542,052 60.9%
Ending Fund Balance $293,575,727 $254,353,498 ($39,222,229) (13.4%)
13
19
2026 Proposed Budget
Revenues and Inflows: $230.4M
Revenue by Category 2024 2025 2026
Taxes $95,705,660 $101,307,200 $114,002,786
Licenses & Permits $6,819,630 $6,852,810 $7,026,213
Intergov't $860,190 $3,208,040 $3,020,055
Services $37,655,042 $39,309,569 $43,572,963
Fines, Fees, & Refunds $18,336,626 $19,819,393 $22,348,445
Grants & Investments $13,931,278 $15,130,653 $13,471,800
Transfers In $17,724,150 $21,131,110 $26,939,888
Total Gross Revenue $191,032,576 $206,758,775 $230,382,150
20
2026 Proposed Budget
Operating Exp: $121.4M
15
21
Customer Focused Government
$1,423,949
Software
$450,000
Affordable
Housing
$325,000
Arts, Parks, & Recreation
$3,146,806
Environmental Initiatives
$1,088,413
Community Building & Health
$1,378,431
2026 Proposed Budget Supplemental Requests: $7.8M
22
Infrastructure
$16,016,000
Buildings
$129,275,000
Equip
ment
$1,98
8,500
Vehicles
$3,160,300
Other Improvements
$15,510,000
Capital
Maintenance
$5,180,450
2026 Proposed Budget Capital: $171.2M
23
2026 Proposed Budget Debt: $3.65M
18
24
2026 Proposed Budget Net Appropriations: $296.3M
19
25
2026 Proposed Budget
• Economic Watch List / Economic Risks
– Inflation, Interest Rates, and US Economy; CPI
creeping up again
– Impact of Tariffs on materials and capital projects,
as well as overall Construction cost escalation
– International Travel trends
• Looking Ahead to 2027 – 2028
– Tax revenues loss and Airport closure impacts;
multiple hotels potentially going offline for
remodels built into our LRP’s
– Increased competition for local contractor
services: City of Aspen competes with Pitkin
County, Snowmass Village, ASD, and the private
sector like Lift One Lodge projects for limited pool
of RFV contractor services
20
26
Pedestrian Mall Upgrades
•Multi-Fund / Department Effort
Castle Creek Bridge Solution
•City Contribution Unknown
New Housing Opportunities
•Outside of Lumberyard, not included
Stormwater Infrastructure
•Currently Pacing Projects Based on Available Funds
Not Incorporated into Long Range Plans
21
27
Organizational Resiliency
& Customer Service
2026 Proposed
Budget
22
28
Strategic Direction 2026
HR Department
Jessica Roberts, HR Director
Margie Boyle Murphy, Senior HR Generalist
29
Agenda
HR Department Structure01
HR Strategic Direction for 202602
HR Successes in 202503
HR Structural & Operational Risks03
Building Organizational Resilience04
30
Laying the groundwork
to improve efficiency and
to enhance customer
service, while meeting
the current and future
needs of the
workforce, organization,
and community.
31
Over 50% of
city operating costs
are spent on
employees
Investing in staff
supports council goals,
benefiting the
community
Wages & Benefits
32
Current Human Resources Organizational Structure
HR Director
Sr. HR Generalist
(Operations)
Human Resources Human Resources
Business Partner–
Recruitment
Human Resources Human Resources
Business Partner -
Risk
Benefits Analyst HR Management
Analyst II
33
Exceptional Employees Deliver Exceptional Services
Council goals
& priority
projects
Staff support
& retention
Aligned
efforts drive
success
34
HR Alignment with Council Guiding Principles:
Strategic Direction for 2026
HR technology
update
Efficient core
HR services
Competitive
total
compensation
program
Support staff
retention
HR department
update
Operational
efficiency and
delivery of
services
Personnel
polices
Compliance and
innovation
35
Ongoing work and projects
HR Successes in
2025
NEW: Employee Medical Plan –
Enhanced Medical Tier Design for 2026
CIRSA: Risk Control Standard Score
100%
Facilitated Employee Appreciation Bonus
Reduced vacancy rate for full time
positions from 8.5% to 5.4% (approx.)
Successfully hired 133 part time and full
time employees (YTD)
36
Eye on future challenges
Structural and
Operational Risks
Antiquated HR systems
Increased organizational and
workforce demands
Legislative updates and
workforce trends
Capacity of HR team to deliver
transformational change
37
Building Organizational Resilience
Organizational agility and adaptability & a thriving workforce
Professional development
initiatives that include
essential technical skills and
soft skills
Enhanced focus
on employee
engagement and
flexibility for work
and wellbeing
Retention and
attraction of staff
to deliver
organizational
goals and projects
Implement and
foster adaptable
and connection-
focused culture
A resilient
workforce is more
prepared to meet
and overcome
challenges
Workforce Skill
Development
Prioritization
Workforce
Satisfaction =
Improved
Outcomes
Talent
Management
Culture of
Inclusion &
Belonging
Strengthening
Resiliency
38
Thank you!
Questions?
39
40
WorkWays Outcomes
Exemplary Service
Widen our pool of
potential job applicants Increase retention
41
Keep teams
connected regardless
of location
More flexible &
supportive work
environment
Improve processes Performance Metrics
How we get there
42
43
The WorkWays Parts
Organization-
Wide Training
Create/Update
Policies &
Procedures
Update meeting
room technology
Space & Storage
Needs
Definitions of
Success /
Performance
Metrics
Organization
Change
Management
ID of roles that
can be more
hybrid or “mostly
remote” in future
Process
Improvement
44
New
Improve Existing
Department Only
Organization
Change
Management
Culture
Initiatives
Update
Meeting
Room
Technology
Organization
Wide
Training
Process
Improvement
Compass
Performance
Metrics
Customer
Service
45
This is a long climb & a heavy lift.
And we’re already on our way.
46
47
Fund Reserves and Fund
Health
2026 Proposed
Budget
42
48
Fund Reserves: Projected Change in Fund Balance
AMP & General Fund: Using cash reserves for Armory project in 2026
Arts & Culture Fund: Increased presented events schedule & associated operating expenses
REMP Fund: Supplemental for Grants & Building IQ
Housing Development Fund: Vertical development for Lumberyard in 2026 is funded by reserves, $110M
Stormwater Fund: Capital Projects
Water & Electric Utility Funds: Capital Projects
Golf Course Fund: Capital Project-Golf Cart Fleet Replacement
IT Fund: Capital Projects and IT Roadmap Supplemental
Fund Name
$ Change in
Fund Balance
% Change in
Fund
Balance
001-General Fund ($12,107,409) (23.8%)
100-Parks and Open Space Fund $1,168,832 23.0%
120-Arts & Culture Fund ($1,093,305) (2.0%)
130-Tourism Promotion Fund $200,000 0.0%
131-Public Education Fund $0 0.0%
132-REMP Fund ($1,821,365) (49.5%)
141-Transportation Fund $972,097 4.0%
150-Housing Development Fund ($81,956,429) (61.9%)
152-Kids First Fund $723,809 6.1%
160-Stormwater Fund ($593,460) (14.9%)
250-Debt Service Fund ($510) (0.2%)
000-Asset Management Plan Fund ($1,821,570) (8.4%)
421-Water Utility Fund ($12,963,813) (56.5%)
431-Electric Utility Fund ($1,223,892) (17.2%)
451-Parking Fund ($453,540) (5.0%)
471-Golf Course Fund ($563,307) (17.9%)
491-Truscott I Housing Fund $187,708 13.7%
492-Marolt Housing Fund ($10,542) (0.5%)
501-Employee Benefits Fund ($94,717) (5.6%)
505-Employee Housing Fund $2,306,008 31.2%
510-Information Technology Fund ($167,225) (22.8%)
43
49
Projected Ending Fund Balance FY26: $254.4M
Arts & Culture Fund: for public art,
Wheeler, and Red Brick. Potential loan for
Armory in 2027 would reduce fund
balance
General Fund: Sending cash to AMP for
Armory project in 2026 and in 2027
Housing Development Fund: Vertical
development for Lumberyard in 2026 is
funded by reserves
44
50
Fund Watch List Fund Watch List
But there are funds to monitor in 2026 & Beyond…
Employee Benefits
o Claims & reinsurance cost escalation
AMP & General Fund
o Increasing capital needs
o Cash reserve funding for Armory limits
flexibility in AMP and GF
Arts & Culture Fund
o Potential internal loan for Armory will reduce
fund balance
o Would be repaid with interest
Transportation
o Transit costs averaging double digit increases,
while sales & lodging tax revenue low single
digits
Tax Credit Housing Funds - T2 and ACI
o Capital needs and capped rents could
necessitate transfer from Housing
Development Fund
Overall, City enjoys healthy reserves:
General Fund $39M
o 2026 - $11M transfer to AMP
o 2027 - $8M transfer to AMP
o Debt service and Loan Repayments on future
debt for GF & AMP
Arts & Culture $52M
Housing Development $50M
o 2026 - Lumberyard reserve funded in year 1
of vertical construction
o Debt service repayments
Transportation $26M
o Transit cost escalation and capital needs
Kids First $13M
o Future new facility planning
o Expanding Financial Aid & Subsidies
45
51
Food Tax Refund
2025 Food Tax Refund
o Council approved an increase
to $132 per person
2026 Food Tax Refund
o Budgeted increase to $136 per
person
o Based on trailing year CPI +3%
52
2026 Proposed Budget
Questions?
• Work Session # 2
– Capital Review
• Work Session # 3
– Supplemental Requests
– Highlighted Fee Changes
• Work Session # 4
– ACRA and CORE to present 2026
Business Plans
– APCHA & Managed Properties Budgets
– Council Interest Areas, Follow-up, and
Conclusions
47
53
MEMORANDUM
TO: Mayor and Council
FROM: Mike Tunte, Landscape Architect and Construction Manager
Hailey Roedel, Deputy City Engineer
THROUGH: Matt Kuhn, Parks and Open Space Director
Tricia Aragon, City Engineer
MEMO DATE: October 2, 2025
MEETING DATE: October 6, 2025
RE: Pedestrian Mall Safety Initiative Work Session
_____________________________________________________________________
REQUEST OF COUNCIL:
A multi-departmental working group led by the Parks and Open Space Department have developed three
alternative strategies to improve safety within the pedestrian mall. We respectfully request guidance
from City Council on which approach staff should prioritize moving forward.
SUMMARY AND BACKGROUND:
Originally built in the 1970s, Aspen’s Pedestrian Mall is a valued part of the Commercial Core Historic
District. In 2017, the Aspen Police Department identified a need for comprehensive security improvement
in the pedestrian mall.
Since 2016, the City of Aspen has made progress on the Pedestrian Mall redesign project, with goals to
address aging infrastructure, improve accessibility, and maintain the mall’s historical character. The
redesign project concluded in 2022 with a comprehensive schematic design that identified key focus
areas, including:
1. Infrastructure Improvements
Aging utilities, including water, gas, telephone, electric, and stormwater systems, were identified as
requiring replacement to meet the community’s needs for the next 50 years.
Enhancements were recommended to improve the stormwater infrastructure and protect the
Roaring Fork watershed.
2. Accessibility Enhancements
54
Recommendations were provided to ensure the mall's brick surfaces comply with the Americans
with Disabilities Act (ADA) standards, increasing accessibility for all users.
3. Public Engagement
Extensive community engagement was a priority throughout the design process. Input was
gathered from residents, business owners, the Historic Preservation Commission (HPC), the
Planning and Zoning Commission (P&Z), and City Council, ensuring broad consensus on the
project’s goals and design.
4. Safety and Aesthetic Improvements
Various security design alternatives were evaluated to balance historic preservation, maintenance,
emergency access, and public safety.
Enhancements were designed to preserve the mall's identity as an urban park, improving its layout
and functionality.
Aspen Pedestrian Mall Schematic Design
55
Following the completion of the Pedestrian Mall schematic design, the City has implemented several key
safety and accessibility upgrades. Notably, Wagner Park Alley was reconstructed, in a collaboration
between the Utilities and Parks department in 2024, as a test site for new materials and technologies.
An updated brick surface improves pedestrian access, while two retractable bollards were installed to
vet winter functionality, and have proven effective in managing vehicle access.
Over the last 8 years, the Aspen Police Department and Special Events team deployed temporary
Meridian barriers to address pedestrian safety in the core during Food and Wine and the 4th of July.
Though visually intrusive, these barriers provide essential protection during peak times. Covered versions
were used during the 2025 summer season to reduce visual impact.
DISCUSSION:
On April 22, 2025, Council approved a contract with Design Workshop to evaluate safety alternatives for
the Pedestrian Mall at the Wheeler intersection. A Project Advisory Team was formed to coordinate
across City departments. Following two initial meetings, three security design options have been
developed.
Option 1 – Stay the course
Option 2 – Secure the perimeter
Option 3 – Implement the vision
During the work session, the project team will review in detail the three options. The presentation is also
included in the packet and includes full details of the following options.
Stay the Course
Continue with the current seasonal use of Meridian barriers, offering flexible placement and deployment
options. This approach involves ongoing rental costs, provides protection which is limited to seasonal
deployment, and presents significant aesthetic and functional conflicts.
Secure the Perimeter
This option minimizes impact on the historic plaza while establishing a consistent and visible pedestrian
safety boundary using traffic rated K4 rated bollards. While effective, the deep foundations required may
interfere with existing utilities, necessitating custom solutions and coordination. Installation will cause
temporary disruption, and if utility upgrades are not addressed concurrently, future rework is likely.
Implement the Vision
The most comprehensive solution, this approach integrates intersection enhancements, utility upgrades,
and security improvements. It anticipates future needs and serves as a foundational step toward realizing
the long-term goals outlined in the schematic design plan.
The Aspen pedestrian malls are a designated historic resource. Staff and the consultant team presented
conceptual pedestrian safety approaches to HPC on July 23. While the initial feedback provided indicated
56
a preference for safety bollards as a solution, any design and engineering direction provided by Council
will go through the City’s land use application process and be developed in conjunction with HPC.
FINANCIAL IMPACTS:
We are seeking Council direction on which approach to pursue at the Wheeler node. The three
alternatives provided vary greatly in terms of cost and implementation. The below figures illustrate
estimated costs for the options at the Wheeler node only, and if successful, other nodes such as the
Cooper/Galena corner (Paradise corner) are anticipated as likely next steps but are not included in these
figures.
Stay the course – On going rental costs of $77,000 annually
Secure the perimeter – $920,000, plus a 30% contingency
Implement the vision - $10 - $14 million, plus a 30% contingency
Additional expenses will include soft costs related to planning for a land use application, design and
engineering, HPC approvals, permit drawings and construction documentation. This decision may affect
multiple departments and funds and require coordination across the 100 Fund, AMP, the General Fund,
and possibly both utilities. A key objective of this effort is to inform and align all these departments in
advance of the 2027 capital budgets, which will be developed in Q1 2026.
ENVIRONMENTAL IMPACTS:
The Pedestrian Mall Safety Initiative considers alternative approaches to public safety. Temporary
installations, such as Meridian barriers, typically have minimal environmental impacts but require ongoing
efforts to install, remove, and transport them, contributing to operational inefficiencies. Permanent
improvements, while initially involving more significant construction impacts, offer substantial
operational benefits by eliminating the need for frequent barrier removal and reinstallation. This reduces
long-term environmental impacts and operational costs.
ALTERNATIVES:
A framework has been developed outlining three distinct approaches to enhance safety at the Wheeler
node of the Pedestrian Mall. Each option has been evaluated through a matrix that highlights its
respective advantages and trade-offs.
Council may direct staff to advance one of these approaches or may elect to blend key elements of the
‘Implement the vision’ option with ‘Secure the perimeter’. Both ‘Secure’ and ‘Implement’ options would
include navigating the land use application process, refining the design, and preparing construction
documentation in collaboration with the Historic Preservation Commission (HPC).
Alternatively, Council may choose to continue the current strategy of deploying temporary Meridian
barriers during high-use dates.
57
RECOMMENDATIONS:
The three options that staff have presented all meet the objective of providing pedestrian safety on the
mall. Rather than making a recommendation, staff defer to Council’s direction, recognizing that this will
be a long-term community decision that will have cross-departmental effort and budgetary impacts.
CITY MANAGER COMMENTS:
Opting for ‘Implement the Vision’ would require further analysis of forecasted costs across the impacted
funds and may require a possible debt question. To this point, the Asset Management Plan Fund will have
little excess funding in the near term given the prioritization of the Armory renovation.
When considering the ‘Implement the Vision’ option, Council may also consider how this project impacts
the community and local businesses with construction likely occurring concurrently with the Armory,
Airport, Lift One and other major private development in and around town.
58
ASPEN PEDESTRIAN MALL SAFETY INITIATIVE
October 6th, 2025
FALL 2025
59
2 | 2 |
TEAM
LANDSCAPE ARCHITECT CIVIL ENGINEER GENERAL CONTRACTOR
MARGARET PLUMB
PROJECT MANAGER
JASON LOISELLE
PRINCIPAL
MATT HARDER
PROJECT MANAGER
MIKE ALBERT
PRINCIPAL
60
3 | 3 |
AGENDA FOR THIS WORK SESSION
REVIEW PEDESTRIAN MALL SCHEMATIC DESIGN
SECURITY DESIGN CRITERIA
SECURITY DESIGN ALTERNATIVES
REVIEW STAKEHOLDER ENGAGEMENT
DISCUSSION
61
4 | 4 |
2016 COUNCIL TOP 10
The Aspen City Council identified the Pedestrian Mall as
a priority project in 2016 due to deteriorating utilities, with
additional concerns for ADA compliance issues, historic
integrity, and urban forest impacts.
Develop a master plan that guides redevelopment and the
use of the pedestrian malls with the goal of maintaining
and improving the pedestrian experience.
!
!
!
!
!
!!
Outdated water use40-year-old technology threatens
historic water patterns
Untreated runoffSediment travels directly into the
roaring fork river
Uneven surfacesDislodged bricks create barriers
to accessibility
Deteriorating utilitiesAging infrastructure disrupts
utility service
Urban forest impactsModifications of the mall would
disturb the mature urban forest
Light pollutionHistoric acorn light fixtures cause light
pollution and are not dark sky compliant
Inaccessible slopesCross slopes exceed 2%
ASPEN PEDESTRIAN MALL: HISTORIC RESOURCE THREATENED BY FAILING INFRASTRUCTURE
62
5 | 5 |
2 COUNCIL PRESENTATIONS
SCHEMATIC DESIGN TIMELINE
The Schematic Design phase completed in fall of 2021,
focused on essential infrastructure and engineering
details, incorporating input from business owners and
stakeholders.
PHASE II:PREFERRED
CONCEPTUAL DESIGN
2018
MALL DESIGN,
CONSTRUCTION AND
INSTALLATION
1976 2019 20202017
PHASE I: INVENTORY
AND ANALYSIS
2016
MALL IMPROVEMENT
PROJECT
LAUNCHED
3 HPC PRESENTATIONS
PUBLIC OUTREACH AND ENGAGEMENT
WHEELER NODE SECURITY SOLUTIONS
PEDESTRIAN MALL IMPROVEMENT TIMELINE
ASPEN PEDESTRIAN
MALL IS DESIGNATED
AS A
HISTORIC RESOURCE
BY CITY OF ASPEN
ASPEN PEDESTRIAN
MALL IS DESIGNATED
AS A
GREAT PLACE IN
AMERICA BY APA
COUNCIL APPROVAL
PHASE III:
SCHEMATIC DESIGN
(ESSENTIAL WORK
/ENGINEERING
DETAILS)
SECURITY ANALYSIS
2023 2025
COUNCIL PRESENTATION
Council presentation
HPC presentation
63
6 | 6 |
PROJECT PHASE TIMELINE
WHEELER NODE SECURITY SOLUTIONS ON SITE
DEVELOPMENT OF SECURITY ALTERNATIVESMEETING 1: STEERING
COMMITTEE
MEETING 2: STEERING
COMMITTEE
COUNCIL
PRESENTATION
SECURITY ALTERNATIVES FOR WHEELER NODE
FUTURE IMPLEMENTATIONOCT.2025SEPT.2025AUG.2025JUL.2025JUN.2025
MEETING 1: HPC
64
7 | 7 |
ASPEN PEDESTRIAN MALL SCHEMATIC DESIGN
0 40 80 120 160 FEET
E DURANT AVENUE
ALLEY
WAGNER PARK
HYMAN AVENUE
ALLEY
COOPER AVENUES GALENA STREETPEDESTRIAN ALLEY MILL STREETOVERALL SITE PLAN
65
8 | 8 |
ASPEN PEDESTRIAN MALL SCHEMATIC DESIGN
0 40 80 120 160 FEET
E DURANT AVENUE
ALLEY
WAGNER PARK
HYMAN AVENUE
ALLEY
COOPER AVENUES GALENA STREETPEDESTRIAN ALLEY MILL STREETOVERALL SITE PLAN
66
9 |
WHY SECURITY ?
PROMENADE DES ANGLAIS, NICE
JUL. 2016
CHARLOTTESVILLE PED MALL, VA
AUG. 2017
HUDSON RIVER PARK, NY
OCT. 2017
BOURBON STREET, NEW ORLEANS
JAN. 2025
67
10 | 10 |
ASPEN PEDESTRIAN MALL INITIATIVE
ASPEN PED MALL SUMMER 2025
68
11 | 11 |
CURRENT CONDITIONS
B
B
A
A
C S MILL STREETE HYMAN AVENUE
E HYMAN PEDESTRIAN MALL
DANCING FOUNTAIN
C
C
C
D E
A
B
C
D
E
F
EXISTING SITE FEATURES
Private property + sidewalk
Sidewalk
Existing trees
Planters
Information Kiosk
At grade curb
SEASONAL SITE FEATURES
6 Meridian barriers placed at 6’+ interval
CONCERNS
Current deployment does not meet expected
security level
Projected costs will rise as APD anticipates
higher quantities and longer deployment in
future seasons
Minimal impact on historic resource, but overall
aesthetic value and context fit are low
Public complaints anticipated due to poor
alignment with urban and historic character
1
1
WHEELER NODE PLAN MERIDIAN BARRIERS ON SITE
CONCERNS
0 5 10 20 FEET 40 FEET+F
69
12 | 12 |
EVOLUTION OF THE MALL
Wheeler Node Present-Day - Extant Features, Mundus Bishop, 2017.
Wheeler Node Original Construction - Built Features, Mundus Bishop, 2017.
Fountain, 1980
Mundus Bishop, 2016
Nick DeWolf Foundation, 1977Main Mall entry point accentuated by
Dancing Fountain
Visual link extending Mill Street through
Hyman Avenue
Fountain repurposed storm water inlet from
1976, iconic feature since 1979
Fountain inaugurated in 1980
Planters
Brick Paving Set
MILL STREETMILL STREETHYMAN AVENUE
HYMAN AVENUE
0 15 30 60 FEET
+
++
++
+
++
+
WHEELER NODE PLAN
Continuous diagonal brick paving with grey-
black bands framing red bricks
Site Furnishings
Kiosk
70
13 | 13 |
ASPEN PEDESTRIAN MALL SECURITY
MINIMIZING ACCIDENT RISKS MINIMIZING VULNERABILITY TO TARGETED ATTACK
-Intersections are the highest-risk for conflicts.
-Good design reduces accidents and improves safety.
-Key principles: visibility, predictability, and compact layouts.
-Short crossings and slower traffic improve safety.
-Curb extensions emphasize pedestrians prioritize and reduce crashes.
-Large gatherings (festivals, markets, concerts) are potential attack targets.
-Upstream traffic control keeps vehicles out of high-pedestrian areas.
PEDESTRIAN SECURITY
(MINIMIZING VULNERABILITY TO TARGETED ATTACK)
PEDESTRIAN SAFETY
(MINIMIZING ACCIDENT RISKS)
71
14 | 14 |
SECURITY ANALYSIS
Vehicle vs Pedestrian
Vehicle Accidents(Intersections)
Vehicle Accidents(Inside the mall)
6 ACCIDENTS IN THE WHEELER INTERSECTIONS
BETWEEN FROM 2015 TO MARCH 2023
1 INCIDENT OF VEHICLE ON THE PED MALL PLAZA
Source: City of Aspen GIS, April 20, 2023 updated
0 40 80 120 160 FEET
FIRE AND EMERGENCY ACCESS POINT REQUIRES 20’ WIDTH
OPENING
STRENGTHS
• Emergency access
• Some protective features
• Limited plaza traffic
OPPORTUNITIES
• Emergency zones
• Pedestrian priority
• Entry barriers
WEAKNESSES
• Conflict intersections
• Kids near traffic
• Service vehicle conflicts
• No stop signs
THREATS
• Uncontrolled entry
• Irregular build-to lines
• Event crowd risks
• ADA parking conflicts
ALLEY
MILL STREETSECURITY VULNERABILITIES
HYMAN AVENUE
HYMAN AVENUE
center is undesirable for fire access
fire hose can reach 2-story structures
from south side
AFD erects manual ladders
HYMAN AVENUEMILL STREETALLEY
EMERGENCY ANALYSIS
HYMAN AVENUE
HYMAN AVENUE
ALLEY
MILL STREETintersections =
potential conflict
zones between
vehicles and
pedestrians
direction of
traffic flow could
result in higher
speed conflict
one-way traffic flow
one-way
traffic flowone-way traffic flowSWOT ANALYSIS
one-way traffic flowHYMAN AVENUE
72
15 | 15 |
SECURITY DESIGN CRITERIA
Features attribute
CUSTOM
LEVEL OF SECURITY
Adherence to security rating
PEDESTRIAN POROSITY
COST
UTILITY IMPLICATIONS
CONSTRUCTABILITY
HISTORIC RESOURCE SENSITIVITY
Range of protected area
Permeability score
Complexity score
Infrastructure Impact
Calendar time
Level of Integrity
ZONE OF PROTECTION
IMPLEMENTATION TIMELINE
IMPACTS TO BUSINESS
Potential site closure
Accommodate change
Inclusive by Design/Access for all
Relative cost
FLEXIBILITY
ADA ACCESSIBILITY
Temporary
Medium
Limited Plaza
Low
Low Medium
Basic
Low
Short Term
Low
Full Plaza
High
High
Complex
High
Long Term
High
Extended
$
Seasonal
Catalogue
Least
$$
Limited
$$$
Permanent
Custom
Most
73
16 | 16 |
Place security feature on existing historic resource
SECURITY DESIGN ALTERNATIVES
MERIDIAN BARRIERS ALONG PLAZA EDGE K4 BOLLARDS IN EXISTING PLAZA K4 BOLLARDS AND INTERSECTION IMPROVEMENTS
Robust vehicle securityRobust vehicle security
Historic context sensitivityApply security feature with limited
impact on historic resource
Positioning barrier to meet security standards
Layered security features
Comprehensive, long-term solution
High investment Site closures for construction
implementation
Moveable for event-specific needs
Holistic utility improvements
Introduces ADA compliance2027-2028 construction timelineQuick to implement
2028-2030 construction timeline
+++
STAY THE COURSE SECURE THE PERIMETER IMPLEMENT THE VISION
74
17 | 17 | 20 ft wide Fire laneB
B
A
A
C
C
C
C
A
B
C
D
E
1
F
2S MILL STREETE HYMAN AVENUE
E HYMAN PEDESTRIAN MALL
DANCING FOUNTAIN
1
2
STAY THE COURSE
EXISTING SITE FEATURES
Private property + sidewalk
Sidewalk
Existing trees
Planters
Information Kiosk
At grade curb
PROPOSED SITE FEATURES
14 Meridian barriers placed at 4’ interval
20’ Emergency Access
D E20 ft wide Fire lane0 5 10 20 FEET 40 FEET
WHEELER NODE PLAN
F
75
18 |
STAY THE COURSE
MERIDIAN BARRIER ELEVATION SECURITY FEATURE CRITERIA INSPIRATION IMAGERY
Features attribute
CUSTOM
LEVEL OF SECURITY
Adherence to security rating
PEDESTRIAN POROSITY
COST
UTILITY IMPLICATIONS
CONSTRUCTABILITY
HISTORIC RESOURCE SENSITIVITY
Range of protected area
Permeability score
Complexity score
Infrastructure Impact
Calendar time
Level of Integrity
ZONE OF PROTECTION
IMPLEMENTATION TIMELINE
IMPACTS TO BUSINESS
Potential site closure
Accommodate change
Inclusive by Design/Access for all
Relative cost
FLEXIBILITY
ADA ACCESSIBILITY
Temporary
Medium
Limited Plaza
Low
Low Medium
Basic
Low
Short Term
Low
Full Plaza
High
High
Complex
High
Long Term
High
Extended
$
Seasonal
Catalogue
Least
$$
Limited
$$$
Permanent
Custom
Most
OPPORTUNITIES:
Maintains current seasonal maintenance with flexible
placement and deployment options.
THREATS:
High rental cost, limited seasonal protection, aesthetic
and utility conflicts, and no clear emergency access
path.
SPECIFICATIONS:
Stops 2,430 lb vehicle at 30 mph with no anchoring; follow manufacturer spacing, configuration, and angle guidelines.
SAFETY Act certified, MASH TL-3 rated; pedestrian safety depends on barrier configuration and spacing.
Height 3ft
Base Length 4ft
76
19 |
STAY THE COURSE
Meridian Barrier at 4’ interval
4ft
77
20 | 20 | 20 ft wide Fire laneB
B
A
A
C S MILL STREETE HYMAN PEDESTRIAN MALL
DANCING FOUNTAIN
1
SECURE THE PERIMETER
C
C
C
E HYMAN AVENUE
3 ft from curb to bollards
A
B
C
D
E
F
EXISTING SITE FEATURES
Private property + sidewalk
Sidewalk
Existing trees
Planters
Information Kiosk
At grade curb
PROPOSED SITE FEATURES
11 K4 bollards placed at 5’ interval
4 Retractable bollards placed at 5’ interval
Retractable bollards allow for 20’ fire lane1
D E
F
WHEELER NODE PLAN
0 5 10 20 FEET 40 FEET
78
21 |
IMPLEMENT THE VISION
K4 BOLLARD SECTION SECURITY FEATURE CRITERIA INSPIRATION IMAGERY
SPECIFICATIONS:
Impact protection: Stops vehicles up to 16,500 lbs (7.5 metric tons) at 30 mph (K4 rating) depending on foundation detail; compliant with PA 68:2013 and IWA 14-1:2013 standards.
Construction & finish: Marine-grade aluminum alloy with stainless steel hardware, galvanized anchorage, IP65 wet-location rating; available in BEGA Unidure® Black, Bronze, Silver, White, Natural Bronze, and custom RAL finishes.
10’’ diameter Retractable bollard
Features attribute
CUSTOM
LEVEL OF SECURITY
Adherence to security rating
PEDESTRIAN POROSITY
COST
UTILITY IMPLICATIONS
CONSTRUCTABILITY
HISTORIC RESOURCE SENSITIVITY
Range of protected area
Permeability score
Complexity score
Infrastructure Impact
Calendar time
Level of Integrity
ZONE OF PROTECTION
IMPLEMENTATION TIMELINE
IMPACTS TO BUSINESS
Potential site closure
Accommodate change
Inclusive by Design/Access for all
Relative cost
FLEXIBILITY
ADA ACCESSIBILITY
Temporary
Medium
Limited Plaza
Low
Low Medium
Basic
Low
Short Term
Low
Full Plaza
High
High
Complex
High
Long Term
High
Extended
$
Seasonal
Catalogue
Least
$$
Limited
$$$
Permanent
Custom
Most
OPPORTUNITIES:
Preserves historic plaza integrity; K4 bollards provide a consistent, clear perimeter for pedestrian protection.
THREATS:
Deep foundation may conflict with utilities, requiring custom solutions and coordination.
Installation needs construction/closure, modified maintenance, and may cause double work if utility upgrades aren’t aligned.
79
22 | 22 |
SECURE THE PERIMETER
SECURITY FEATURE:
Install rated bollards with appropriate footing and
retractable mechanism.
Replace surrounding brick in kind.
Provide power only for retractable bollards.
BOLLARD FOOTING OPTIONS
SPREAD FOOTING (MONOLITHIC CONCRETE
STRUCTURE):
Shallow, smaller excavation.
More utility conflicts/coordination.
Harder to replace damaged bollards.
INDIVIDUAL FOOTINGS (CONCRETE CASINGS):
4’ min. depth, small surface impact.
Fewer utility conflicts but precise data required.
Easier single-bollard replacement.
RISKS
Utility conflicts may require minor relocations and
expand work limits.
Future intersection/mall improvements could require
rework.
OPPORTUNITIES
Work limited to bollard installation reduces utility
impacts and construction time.
0 5 10 20 FEET 40 FEET
WHEELER NODE PLAN
+
Approx. limit of work
Pavers, curbs
and pavement to
be removed and
replaced in kind
New electrical
connection to be
provided to bollards
+
+
+
Approx. limit of
footing
80
23 |
SECURE THE PERIMETER
k4 Bollards at 5’ interval Retractable Bollards
5ft
81
24 | 24 |
ASPEN PEDESTRIAN MALL SCHEMATIC DESIGN IMPROVEMENTS
Pedestrian and vehicular overlap zone demarcated by
paving change.
Narrow intersection (increases pedestrian zone).
From 33.5’ to 19.6’.
1
2
3
4
5
6
1
5
2
3
3
3
3
4
Retain contra-flow bike lane on north side of road.
Extends curbs to shelter pedestrians from direct vehicular
traffic that also contain added bike racks on south side
Snowmelted ADA crossing.
6” grade separated roadway clearly delineates pedestrian
and vehicular zones.
6
PROPOSED SAFETY STRATEGIES TO MINIMIZE PEDESTRIAN RISKS
MODIFICATION TO CURB LINESWHEELER NODE PLAN
S MILL STREETE HYMAN AVENUE
E HYMAN PEDESTRIAN MALL
DANCING FOUNTAIN
0 5 10 20 FEET 40 FEET
82
25 | 25 | S MILL STREETE HYMAN AVENUE
E HYMAN PEDESTRIAN MALL
DANCING FOUNTAIN
PROPOSED SAFETY FEATURES
Narrow Intersection (Increases pedestrian zone). From 33.5’ to 19.6’
Retain contra-flow bike lane on north side of road.
Extends curbs to shelter pedestrians from direct vehicular traffic that also contain added bike racks on south side.
Pedestrian and vehicular overlap zone demarcated by paving change.
Snow melted ADA crossing.
6’’ grade separated roadway clearly delineates pedestrian and vehicular zones.
11 K4 Bollards.
3 Retractable Bollards.
Retractable bollards allow for 20’ fire lane
1
2
3
5
6
A
4
3
3
2
3
4
1 6
A
3
IMPLEMENT THE VISION
5
5 ft from curb to bollards
WHEELER NODE PLAN
0 5 10 20 FEET 40 FEET20 ft wide Fire lane83
26 |
IMPLEMENT THE VISION
K4 BOLLARD SECTION SECURITY FEATURE CRITERIA INSPIRATION IMAGERY
Features attribute
CUSTOM
LEVEL OF SECURITY
Adherence to security rating
PEDESTRIAN POROSITY
COST
UTILITY IMPLICATIONS
CONSTRUCTABILITY
HISTORIC RESOURCE SENSITIVITY
Range of protected area
Permeability score
Complexity score
Infrastructure Impact
Calendar time
Level of Integrity
ZONE OF PROTECTION
IMPLEMENTATION TIMELINE
IMPACTS TO BUSINESS
Potential site closure
Accommodate change
Inclusive by Design/Access for all
Relative cost
FLEXIBILITY
ADA ACCESSIBILITY
Temporary
Medium
Limited Plaza
Low
Low Medium
Basic
Low
Short Term
Low
Full Plaza
High
High
Complex
High
Long Term
High
Extended
$
Seasonal
Catalogue
Least
$$
Limited
$$$
Permanent
Custom
Most
10’’ diameter Retractable bollard
OPPORTUNITIES:
Preserves historic plaza integrity; K4 bollards provide a consistent, clear perimeter for pedestrian protection.
THREATS:
Deep foundation may conflict with utilities, requiring custom solutions and coordination.
Installation needs construction/closure, modified maintenance, and may cause double work if utility upgrades aren’t aligned.
SPECIFICATIONS:
Impact protection: Stops vehicles up to 16,500 lbs (7.5 metric tons) at 30 mph (K4 rating) depending on foundation detail; compliant with PA 68:2013 and IWA 14-1:2013 standards.
Construction & finish: Marine-grade aluminum alloy with stainless steel hardware, galvanized anchorage, IP65 wet-location rating; available in BEGA Unidure® Black, Bronze, Silver, White, Natural Bronze, and custom RAL finishes.
84
27 | 27 |
IMPLEMENT THE VISION
SURFACE MATERIALS:
Replace pavement, pavers, and curbs
Regrade for ADA compliance.
SECURITY:
Install retractable bollards with rated footings.
Provide adequate power supply.
DRAINAGE:
Coordinate with Aspen Engineering to confirm need for
additional catch basins/structures.
UTILITIES:
Install water, telecom, electrical, irrigation.
Utilities cap 5’ beyond permanenet limit of work limits.
Reset castings to finished grade.
RISKS
Maximum cost
Longest construction duration.
OPPORTUNITIES
Long-term investment
Maximum benefits toward future completion of the mall.
0 5 10 20 FEET 40 FEET
Approx. limit of work+
+
+
+
+
WHEELER NODE PLAN
Proposed irrigation
line+
+Proposed water line
(12’’dia) connect to
ex.12’’’
Proposed telecom.
conduit
Temporary transition
zone to match
existing grading (typ.)
remove and replace
pavers
Temporary transition
zone to match
existing grading (typ.)
remove and replace
pavers
+
++
Proposed elec.
conduit extend trench
from Wagner Park+
Approx. limit of
bollards and footings
Regrade area to
match ADA design
Approx. limit of work
(electrical trench from
Wagner Park required
to provide service)
Existing Storm drain
to remain
Existing Raw water
to remain
Existing Gas to
remain
+
+
85
28 |
IMPLEMENT THE VISION
k4 Bollards Retractable Bollards
6’’ grade separated curb
clearly delineates pedestrian
and vehicular zones.
86
29 | 29 | S MILL STREETE HYMAN AVENUE
E HYMAN PEDESTRIAN MALL
DANCING FOUNTAIN
3
3
2
3
4
1 6
7
3
IMPLEMENT THE VISION
20 ft20 ft20 ft20 ft5 ft5 ft5 ft5 ft6 ft6 ft6 ft6 ftWHEELER NODE PLAN
20 ft wide Fire lane5
0 5 10 20 FEET 40 FEET
PROPOSED SAFETY FEATURES
Narrow Intersection (Increases pedestrian zone). From 33.5’ to 19.6’
Retain contra-flow bike lane on north side of road.
Extends curbs to shelter pedestrians from direct vehicular traffic that also contain added bike racks on south side.
Pedestrian and vehicular overlap zone demarcated by paving change.
Snow melted ADA crossing.
6’’ grade separated roadway clearly delineates pedestrian and vehicular zones.
Site furniture feature creating a space for people to sit and interact.
3 Retractable Bollards.
Retractable bollards allow for 20’ fire lane
1
2
3
5
6
7
A
4
A
87
30 |
IMPLEMENT THE VISION
SPECIFICATIONS:
Designed for long-lasting pedestrian seating in demanding environments; pedestrian safety depends on appropriate spacing and installation according to manufacturer guidelines.
BENCH SECTION SECURITY FEATURE CRITERIA INSPIRATION IMAGERY
Features attribute
CUSTOM
LEVEL OF SECURITY
Adherence to security rating
PEDESTRIAN POROSITY
COST
UTILITY IMPLICATIONS
CONSTRUCTABILITY
HISTORIC RESOURCE SENSITIVITY
Range of protected area
Permeability score
Complexity score
Infrastructure Impact
Calendar time
Level of Integrity
ZONE OF PROTECTION
IMPLEMENTATION TIMELINE
IMPACTS TO BUSINESS
Potential site closure
Accommodate change
Inclusive by Design/Access for all
Relative cost
FLEXIBILITY
ADA ACCESSIBILITY
Temporary
Medium
Limited Plaza
Low
Low Medium
Basic
Low
Short Term
Low
Full Plaza
High
High
Complex
High
Long Term
High
Extended
$
Seasonal
Catalogue
Least
$$
Limited
$$$
Permanent
Custom
Most
OPPORTUNITIES:
Bike amenities and narrowed, grade-separated intersections improve safety and pedestrian access.
Long-term solution upgrades utilities, adds historic context features, and creates a vibrant plaza.
THREATS:
Major disturbance with closure and complex phasing. Utility conflicts and revised snow/seasonal maintenance needs.
Overall Height 17.5’’
Customized Bench
Brick Paving
Concrete Footing
Sub-structure with reinforcement
Compacted crushed aggregate base
88
31 | 31 |
IMPLEMENT THE VISION
SURFACE MATERIALS:
Remove and replace pavement, pavers, and curbs
Regrade for ADA compliance.
SECURITY:
Install retractable bollards with rated footings.
Replace surrounding brick in kind.
Provide adequate power supply.
DRAINAGE:
Coordinate with Aspen Engineering to confirm need for
additional catch basins/structures.
UTILITIES:
Install water, telecom, electrical, irrigation;
Utilities cap 5’ beyond permanenet limit of work limits;
Reset castings to finished grade.
RISKS
Maximum cost
Construction duration.
OPPORTUNITIES
Long-term investment
Maximum benefits toward future completion of the mall.
0 5 10 20 FEET 40 FEET
Approx. limit of work
Approx. limit of
furniture and footings
Proposed irrigation
line
Regrade area to
match ADA design
+
+
+
+
Proposed water line
(12’’dia)
Proposed elec.
conduit
Proposed telecom.
conduit
Temporary transition
zone to match
existing grading (typ.)
remove and replace
pavers
Temporary transition
zone to match
existing grading (typ.)
remove and replace
pavers
+
+
+
++
WHEELER NODE PLAN
+
+
+
+
Approx. limit of work
(electrical trench from
Wagner Park required
to provide service
Ex. Storm drain to
remain
Ex. Raw water to
remain
Ex. Gas to Remain
+
89
32 | 32 |
IMPLEMENTATION TIMELINE IMPLEMENTATION TIMELINE IMPLEMENTATION TIMELINE
COST ESTIMATE COST ESTIMATE (2027 COST)COST ESTIMATE (2030 COST)
SECURITY DESIGN ALTERNATIVES: OVERALL PRICING
Rental: $76,230 per year
Purchase: $151,000 per year + 10% contingency
Entire scope: $10 - $14 million + 30% contingency
includes plaza improvements: utility replacement,
regrading, fountain repairs, intersection material
changes, and bollard installation
6 months timeline 18-24 months timeline
Design services: 2026
Permiting + HPC approvals: 2026 - 2027
Construction: 2027 - 2028
3 - 5 years timeline
Design services: 2026 -2027
Permiting + HPC approvals: 2027 - 2028
Construction: 2028 - 2030
2026 2027 2028 2028 2030
$$$$$$$$$$$$$$$$$$
MERIDIAN BARRIERS ALONG PLAZA EDGE K4 BOLLARDS IN EXISTING PLAZA K4 BOLLARDS AND INTERSECTION IMPROVEMENTS
STAY THE COURSE SECURE THE PERIMETER IMPLEMENT THE VISION
Purchase + Installation: $920,000 + 30% contingency
Replacement: $20,000 fixed bollard
$100,000 retractable bollard
+++
90
33 | 33 |
CONS
SECURITY DESIGN ALTERNATIVES: PROS AND CONS
MERIDIAN BARRIERS ALONG PLAZA EDGE K4 BOLLARDS IN EXISTING PLAZA K4 BOLLARDS AND INTERSECTION IMPROVEMENTS
STAY THE COURSE SECURE THE PERIMETER IMPLEMENT THE VISION
PROS PROS PROS
CONS CONS
»Quick to implement
»Risk to pedestrians if not spaced as recommended or only seasonally
»More time to move for emergency access than bollards
»Does not align with historic Pedestrian Mall aesthetic
»Prioritizes permanent industry standard security
feature
»Bollards are preferred security feature by HPC
»Does not address aging utilities
»Does not address ADA accessibility
»Installation of bollard footings may conflict with existing utility lines
»Addresses security goals AND aging utilities and ADA
accessibility
»Bollards are preferred security feature by HPC
»Highest cost
»Longest timeframe to implement
+++
91
34 | 34 |
FEEDBACK FROM STEERING COMMITTEE
CITY OF ASPEN STEERING COMMITTEE DEPARTMENTS
Parks & Open Space
Historic Preservation
Engineering
Police Department
Utilities
Lodging & Commercial Core
Deputy City Clerk
Capital Asset
PEDESTRIAN SECURITY
ASPEN SOLUTION
DURABILITY AND TIMELESSNESS
OPERATIONAL NEEDS
BUSINESS AND INFRASTRUCTURE IMPACTS
IMPLEMENTATION COMPLEXITY
92
35 | 35 |
LEAST VISUALLY INVASIVE SOLUTION
BOLLARD APPROACH PREFERRED
TRAFFIC AND PEDESTRIAN MOVEMENT
FEEDBACK FROM HPC
INFRASTRUCTURE INVESTMENT
93
36 | 36 |
DISCUSSION
What questions do you have about the security alternatives?
Which alternative is most replicable for other Pedestrian Mall intersections?
Which security alternative is most suitable for Aspen?
94