Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Master Permit.920 E Hyman Ave.0006-2024-BREP
9/18/25,5:53 PM 0006-2024-BREP Salesforce-Enterprise Edition • Close Window salesforce • Print This Page • Expand All I Collapse All 0006-2024-BREP Number 0006-2024-BREP Record Type Building-Repair Address 920 E HYMAN AVE Owner Fernando Cruz Original Number 24-1034 Status Closed-Final Type Building-Repair Reason for Cancel or Comp!. Review Fail Applicant STEPHEN SIMMONS Aspen Internal? No Account Aspen Home Inspections,LLC Required Bond Amount Project Total Available Bond Amount Land Use Planning Application Bluebeam Project Id 527-301-496 Permit Contractor Aspen Home Inspections,LLC HPC-ZON-EH-UTIL Review HPC Rev, Valid Business License on Eng Review #Error! Account Imported Parks-Prkng-San Review Parks Rev,Parks Fee, Required Submissions Conditional Inspections HPC Insp,Parks Insp, Documents Resubmitted Conditional Final lnsp HPC Final,Parks Final, Action Items Hold All Reviews Create Fees Hold Reason Create Fees 2 Utility Review Type #Error! Price Book 2024 Conditional Flat Fee Formula Applicant is a Nonprofit? No Conditional Tiered Fee Formula Discount All Fees(%) Conditional Tiered SqFt Fee Fee Discount Reason Formula CO/LOC? LOC CO Status if Applicable Issued Queue Score Project Designation Repairs Milestone Current Days in 0 Applicant Hand Queue Designation Repairs Milestone Current Days in City 13 Hands Queue Score 0 Milestone-Total Days in 0 Applicant Hand Last Date Received from Milestone-Total Days in City 10 Applicant Hands Dates New Application Date 4/11/2024 Close/CO Issuance Date 9/8/2024 Application Complete Date 5/8/2024 Expiration Date 2/24/2025 Application Accepted Date 5/8/2024 Override Expiration Date Issue Date 5/30/2024 Last Activity Date 8/28/2024 Days to Issue 22 Basic Information Description Repair failed below grade water-proofing that was Census Code completed in 2021.First failure(leaks in basement walls) was summer 2022.Original contractor repaired it.2nd failure was 2023 and owner does not want original contractor on job. Use of Building Single Family Use Class Residential Permit Comments Engineering CMP:Staging or parking within the alley will not be permitted without proper permitting in place prior to occupation of the City of Aspen Right of Way. Parks Comment: TREE/Dripline Excavation Permit shall be issued prior to work resuming within existing tree drip line. Additional encroachment within existing tree drip lines shall be performed via hand-digging only.All exposed roots to be preserved shall be covered by fabric and kept moist throughout exposure and prior to backfilling of soils.Contractor shall contact the City Forester prior to pruning roots greater than 1.5" in diameter at(970)319-9729. https://cityofaspen.my.salesforce.com/a038X00002N1dfAQAR/p 1/14 9/18/25,5:53 PM 0006-2024-BREP Salesforce-Enterprise Edition It shall be unlawful for any person,without first obtaining a permit for tree removal as herein provided,to dig,excavate,turn,compact or till the soil within the dripline of any tree in such a manner as to cause material damage to the root system of the tree. The dripline of a tree is a cylinder extending from grade level down to a depth of ten(10)feet below grade,having a radius equal to the length of the longest branch of the tree,with the center of the cylinder located at the center of the trunk of the tree. Historic Preservation Comments: Waterproofing the foundation and returning the landscape to its previous appearance is approved on the condition that additional work(e.g.,replacing the front walkway)not be performed without obtaining a land use approval.Although not required,It is recommended that a gravel boarder void of irrigation and plantings be installed around historic resource to proved at least one foot of separation between historic resource and any irrigation/foliage. Job Location Address 920 E HYMAN AVE,ASPEN:273718206005 Lot N Site Address Display on Map Legal Description Subdivision:EAST ASPEN ADDITION Block:32 Lot:N Historic Property? Yes Eden Address Historic District? No HPC-Planning-Zoning Details Zone District R/MF Located in a PD? Yes Deed Restricted? No Work Affects Exterior of Yes Building? HOA/Covenant Property Not Subject to HOA or Covenant Building Project Details Valuation $135,000.00 Lot Size Sq.Ft. Reason for Valuation Change Cost of work to discover,expose,and repair below grade Soil Disturbance Sq Ft 45 water-proofing failure. Unit Sq.Ft. 2,149 Affected Area Sq Ft 45 Building Footprint Sq Ft Existing Hardscape Footprint Sq Ft Sq Ft of Building Work Area 280 Existing Hardscape%of Lot #Error! Building Fire Area Sq Ft Con Mit Sq Ft Total 325 of Interior being Altered Utility Review Sq Ft Total 45 Scope of Work Details Work Changes No Work Affects Tree/Drip Line? Yes Fenestration/Thrml Envelop? Requires Asbestos Test? No Located Within City Mall No Boundaries? Affects Parking/Alleys/Loading? No Adjacent to City Open Space? No Impacts City Trails/Parks? No Work Subject to Water Efficient Yes L.O.? Building Description Code Editions 2021 IBC Required Special Inspections Other Code Editions 2021 IEBC Energy Code Compliance Total Building Performance Building Type(IRC) One family Open Text Field For Comments Construction Type VB Occupancy Group R-3 Financials Total Fees $878.85 Total Payments $878.85 Total Balance $0.00 System Information Number 0006-2024-BREP Community Visibility 1 Bluebeam Project Id 527-301-496 Contact IDs 0038X000040DVg4QAG,0038X000040DVg4QAG,0038X000040DVg4QAG BB Project Name 920 E HYMAN AVE-0006-2024-BREP IsTestData? Created By Stephen Simmons,4/11/2024,2:10 PM Last Modified By Renee Espinoza,5/21/2025,12:51 PM VIP Form Tool VIP 4/11/2024, VIP Permit Application Submitted 3:18 PM Form Template VIP VIP i{"parentCategoryld":null,"isSubmit":null,"isCurrenf':null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryld":"a2E6A000000UwvPUAS"}, Foreign Template {"parentCategoryld":null,"isSubmit":null,"isCurrenY':null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryld":"a2E6A000000UwvNUAS'}, Language Status {"parentCategoryld":null,"isSubmit":null,"isCurrenY':null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryld":"a2E6A000000iWidUAE"), https://cityofaspen.my.salesforce.com/a038X00002N1dfAQAR/p 2/14 9/18/25,5:53 PM 0006-2024-BREP—Salesforce-Enterprise Edition {"parentCategoryld":null,"isSubminnulrisCurrennnull,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryld":"a2E6A000000UwvVUAS'}, {"parentCategoryl d":nu I I,"isSu bminnulrisCu Trent':n ull,"categoryStatusLabels":n u l I,"categoryStatus":"Completed","categoryld":"a2E6A000000UwvKUAS"}, {"parentCategoryl d":nu I risSu bminnulrisCu Trent':n ull,"categoryStatusLabels":n u l I,"categoryStatus":"Completed","categoryld":"a2E6A000000UwvXUAS"}, {'parentCategoryl d":nu I risSu bminnulrisCu Trent':n ull,"categoryStatusLabels":n u l I,"categoryStatus":"Completed","categoryld":"a2E6A000000UwvaUAC"}, {'parentCategoryld":null,"isSubminnulrisCurrennnull,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryld":"a2E6A000000UwvZUAS"}, {"parentCategoryld":null,"isSubmintrue,"isCurrennnull,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryld":"a2E6A000000Ux1 dUAC"}] Action Items View/Print Permit Link Attachment Activity History Email:Letter of Completion:Permit 0006-2024-BREP at 920 E HYMAN AVE,ASPEN:273718206005 Type Billable Assigned To Martyna Wojtkowska Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 9/8/2024 Days in Applicants Hands To:aspenhomeinsp@gmail.com CC: BCC: Attachment:Building_- CO City Use Tax -_Final Return Reconciliation_20240909.pdf,920 E HYMAN AVE-0006-2024-BREP_LOC_Final.pdf Subject:Letter of Completion:Permit 0006-2024-BREP at 920 E HYMAN AVE,ASPEN:273718206005 Comments Body: Hello Stephen Simmons, Please find attached your issued letter of completion for the completed project at 920 E HYMAN AVE,ASPEN:273718206005. If you have any questions about use tax or how to fill out the forms,please contact Bebo Salib at bebo.salib@aspen.gov or 970.920.5043. For questions about this permit,you can reply to this email. Email:Building Permit 0006-2024-BREP-920 E HYMAN AVE,ASPEN:273718206005-Issued Type Billable Assigned To Emily Page Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 5/30/2024 Days in Applicants Hands To:aspenhomeinsp@gmail.com CC: BCC: Attachment:Building_-_Permit_Issuance_and_Use_Tax_Letter_20240530.pdf Subject:Building Permit 0006-2024-BREP-920 E HYMAN AVE,ASPEN:273718206005-Issued Body: Stephen Simmons, Please find attached your issued building permit for 0006-2024-BREP for 920 E HYMAN AVE,ASPEN:273718206005 and City Use Tax exemption letter, if applicable. Below is a link to your plans.Please print these 24x36 in color and keep them on site at all times.As a reminder,links will expire in 30 days so please download the plans as soon as you get this email. https://cityofaspen.sharepoint.com/:f:/s/COA-IssuedBuildingPlansPublicRecords/Es-1ZSsbMw1 EkJgJ9WfORV4BodzgR8ZE9kv8nY_tupuOPA?e=Fk6PSZ Comments All inspections are scheduled through the Salesforce applicant portal. BUILDING INSPECTIONS REQUESTED BY 7:30 PM WILL BE SCHEDULED FOR THE NEXT BUSINESS DAY.REQUESTS AFTER 7:30 PM WILL BE SCHEDULED FOR THE FOLLOWING BUSINESS DAY.ALLOW THE ENTIRE DAY FOR THE INSPECTION. PLEASE NOTE THAT ALL REFERRAL AGENCIES MUST APPROVE THEIR FINAL INSPECTIONS PRIOR TO THE FINAL BUILDING INSPECTION. WHAT INSPECTIONS DO I NEED?Please visit here:https://www.aspen.gov/DocumentCenter/View/7847/-What-Inspections-are-Needed-for-my-Permit? bidld= HOW TO SCHEDULE AN INSPECTION ONLINE?Please visit here:https://www.aspen.gov/DocumentCenter/View/6436/How-to-request-an-inspection? bidld= For questions on inspections please email buildinginspectors@aspen.gov If you are experiencing system issues,please contact sfsupport@cityofaspen.com or call 970-920-5065. Email:Permit Fees Due:0006-2024-BREP at 920 E HYMAN AVE,ASPEN:273718206005 Type Billable Assigned To Martyna Wojtkowska Number of Hours https://cityofaspen.my.salesforce.com/a038X00002N1dfAQAR/p 3/14 9/18/25,5:53 PM 0006-2024-BREP—Salesforce-Enterprise Edition Total Cost $0.00 Fee Generated Date Start Date Completed Date 5/23/2024 Days in Applicant's Hands To:aspenhomeinsp@gmail.com CC: BCC: Attachment:--none-- Subject:Permit Fees Due:0006-2024-BREP at 920 E HYMAN AVE,ASPEN:273718206005 Body: If you have not already paid the fees due on your permit 0006-2024-BREP,at 920 E HYMAN AVE,ASPEN:273718206005,please log into the Aspen Permitting Portal to pay them.If you pay online,be aware that credit card or e-check transaction fees will apply. If you would like to pay by check,you can mail payments to the following locations: •Building and related permits:Community Development,427 Rio Grande •Parking Reservation permits:Parking Department,427 Rio Grande •Pitkin County Water Permit:Utility Billing.,427 Rio Grande •ROW and encroachments:427 Rio Grande Comments •Tree permits:Parks Dept.,585 Cemetery Lane Aspen •Utility Connection Permits:Utility Billing.,130 S Galena,1st Floor •Electric Community Investment Fee:Utility Billing.,130 S Galena,1st Floor Current Amount Due:$866.25 Instructions to see detail of fees due: -Log in to the Portal here:https://cityofaspen.force.com and click on Permits menu -Open the permit by clicking on the permit number link -Click on the Related tab(next to Details tab)and scroll down to Fees section -If all fees are not visible,click the"View All"link -To filter fees,click on the black funnel icon at the top right.(Example:to only see the fees due at permit submission,select"Complete Pending Submittal Fees"under Permit Fees Due At section and then click Apply button.) Instructions to pay fees are found here:https://www.aspen.gov/DocumentCenter/View/5008/Paying-for-an-Application-?bidld= Thank you! City of Aspen Email:Permit Fees Due:24-1034 at 920 E HYMAN AVE,ASPEN:273718206005 Type Billable Assigned To Linzhi Douglass 000 9/23-10/2 Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 5/8/2024 Days in Applicant's Hands To:aspenhomeinsp@gmail.com CC: BCC: Attachment:--none-- Subject:Permit Fees Due:24-1034 at 920 E HYMAN AVE,ASPEN:273718206005 Body: If you have not already paid the fees due on your permit 24-1034,at 920 E HYMAN AVE,ASPEN:273718206005,please log into the Aspen Permitting Portal to pay them.If you pay online,be aware that credit card or e-check transaction fees will apply. If you would like to pay by check,you can mail payments to the following locations: •Building and related permits:Community Development,427 Rio Grande •Parking Reservation permits:Parking Department,427 Rio Grande •Pitkin County Water Permit:Utility Billing.,427 Rio Grande •ROW and encroachments:427 Rio Grande •Tree permits:Parks Dept.,585 Cemetery Lane Aspen •Utility Connection Permits:Utility Billing.,130 S Galena,1st Floor Comments •Electric Community Investment Fee:Utility Billing.,130 S Galena,1st Floor Current Amount Due:$12.60 Instructions to see detail of fees due: -Log in to the Portal here:https://cityofaspen.force.com and click on Permits menu -Open the permit by clicking on the permit number link -Click on the Related tab(next to Details tab)and scroll down to Fees section -If all fees are not visible,click the"View All"link -To filter fees,click on the black funnel icon at the top right.(Example:to only see the fees due at permit submission,select"Complete Pending Submittal Fees"under Permit Fees Due At section and then click Apply button.) Instructions to pay fees are found here:https://www.aspen.gov/DocumentCenter/View/5008/Paying-for-an-Application-?bidld= Thank you! City of Aspen Linzhi Douglass Plans Examiner I linzhi.douglass@aspen.gov I(Office):970.429.2020 Email:City of Aspen-Application Status:Completeness Review Failed Type https://cityofaspen.my.salesforce.com/a038X00002N1dfAQAR/p 4/14 9/18/25,5:53 PM 0006-2024-BREP—Salesforce-Enterprise Edition Billable Assigned To Linzhi Douglass 000 9/23-10/2 Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 4/28/2024 Days in Applicant's Hands To:aspenhomeinsp@gmail.com CC: BCC: Attachment:--none-- Subject:City of Aspen-Application Status:Completeness Review Failed Body: Dear Stephen Simmons, Your Permit Application#24-1034 for 920 E HYMAN AVE,ASPEN:273718206005 is in the"Completeness Review Failed"Status because of the following: Hi,Stephen, Your repair permit is currently incomplete.Please provide the following: -Completed and signed permits signatures application packet(https://www.aspen.gov/DocumentCenter/View/5704/Permit-Application-Signature- Package?bidld=) Comments -Construction management plan(https://www.aspen.gov/DocumentCenter/View/7710/CMP-Application-for-Medium-Projects---Checklist-Style) -Photos of repair area -Narrative(bullet points)describing what is broken and the steps taken or intended to fix it Please notify me when you have uploaded the above as I will not receive an automatic notification.If you are using the Chatter feature on SalesForce, ensure to type"@",start typing my name:Linzhi Douglass,and select the name drop down to tag me. Please contact Linzhi Douglass 000 4/22-4/26 with any questions at linzhi.douglass@services.cityofaspen.com. Thank you, City of Aspen Linzhi Douglass Plans Examiner I linzhi.douglass@aspen.gov I(Office):970.429.2020 Email:Your Building Permit Application Has Been Received...Here's What to Expect Type Billable Assigned To Linzhi Douglass 000 9/23-10/2 Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 4/17/2024 Days in Applicant's Hands Comments To:aspenhomeinsp@gmail.com CC: BCC: Attachment:--none-- Subject:Your Building Permit Application Has Been Received...Here's What to Expect Body: Dear Stephen Simmons: I have received your permit application.I will be your Permit Coordinator.The City of Aspen permit process works as follows: Completeness Review:I will be reviewing your permit application for completeness in the next 7-10 business days.I will follow up with you directly if I need any additional information. Submittal Fees:Once your permit is deemed complete,I will provide you with a list of all permit submittal fees that are due.Your permit will not be placed into our review queue until payment of all submittal fees is received. Permit Review:Your permit will be placed in our review queue on the date that the submittal fee payment is received.Each review agency triggered for the review will either approve the permit or issue comments that you are required to address prior to their approval.You can see the status of all reviews by going into your permit on the Salesforce portal,clicking on the'Related'tab,and scrolling down to'Reviews.' Comment Response:Once you have addressed all agency comments,both in writing and on your plans,you will resubmit all documents via the portal. Just go into your permit,scroll down to the bottom of the page,and use the'Add more'button.You must notify me when you have uploaded your files for me to know that you have resubmitted.You can use the portal's Chatter feature(see instructions below). https://cityofaspen.my.salesforce.com/a038X00002N1dfAQAR/p 5/14 9/18/25,5:53 PM 0006-2024-BREP—Salesforce-Enterprise Edition Issuance:Once all agencies have approved your permit,you will be notified that it is time to pay your permit issuance fees.Once you do so,your approved plans and permit documents will be sent to you electronically. Additional Important Information: Only after I perform a completeness review and submittal fees are paid will your permit be accepted into our system as a formal submission.At that time,it will be put into the permit work queue. I may need to meet with you—either in person,over the phone,or via a virtual meeting—before I can finish my completeness review to ensure that I have a full understanding of your project's scope. If you need to contact me about your permit,I encourage you to use the Chatter feature on your permit on the applicant portal.When you use Chatter,I get an email,but it also gets attached to the permit record in the back office.So,anyone looking at the permit can see the conversations.This will be very helpful if someone else needs to get involved with your permit. To use Chatter: Open your permit on the portal. In the`Share an update...'box,type'@,'then start typing my name.My name will appear.Just click on it then add your message. Linzhi Douglass Plans Examiner I linzhi.douglass@aspen.gov I(Office):970.429.2020 Email:Your Building Permit Application Has Been Received...Here's What to Expect Type Billable Assigned To Linzhi Douglass 000 9/23-10/2 Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 4/17/2024 Days in Applicant's Hands Comments To:aspenhomeinsp@gmail.com CC: BCC: Attachment:--none-- Subject:Your Building Permit Application Has Been Received...Here's What to Expect Body: Dear Stephen Simmons: I have received your permit application.I will be your Permit Coordinator.The City of Aspen permit process works as follows: Completeness Review:I will be reviewing your permit application for completeness in the next 7-10 business days.I will follow up with you directly if I need any additional information. Submittal Fees:Once your permit is deemed complete,I will provide you with a list of all permit submittal fees that are due.Your permit will not be placed into our review queue until payment of all submittal fees is received. Permit Review:Your permit will be placed in our review queue on the date that the submittal fee payment is received.Each review agency triggered for the review will either approve the permit or issue comments that you are required to address prior to their approval.You can see the status of all reviews by going into your permit on the Salesforce portal,clicking on the`Related'tab,and scrolling down to'Reviews.' Comment Response:Once you have addressed all agency comments,both in writing and on your plans,you will resubmit all documents via the portal. Just go into your permit,scroll down to the bottom of the page,and use the'Add more'button.You must notify me when you have uploaded your files for me to know that you have resubmitted.You can use the portal's Chatter feature(see instructions below). Issuance:Once all agencies have approved your permit,you will be notified that it is time to pay your permit issuance fees.Once you do so,your approved plans and permit documents will be sent to you electronically. Additional Important Information: Only after I perform a completeness review and submittal fees are paid will your permit be accepted into our system as a formal submission.At that https://cityofaspen.my.salesforce.com/a038X00002N1dfAQAR/p 6/14 9/18/25,5:53 PM 0006-2024-BREP—Salesforce-Enterprise Edition time,it will be put into the permit work queue. I may need to meet with you—either in person,over the phone,or via a virtual meeting—before I can finish my completeness review to ensure that I have a full understanding of your project's scope. If you need to contact me about your permit,I encourage you to use the Chatter feature on your permit on the applicant portal.When you use Chatter,I get an email,but it also gets attached to the permit record in the back office.So,anyone looking at the permit can see the conversations.This will be very helpful if someone else needs to get involved with your permit. To use Chatter: Open your permit on the portal. In the'Share an update...'box,type'@,'then start typing my name.My name will appear.Just click on it then add your message. Linzhi Douglass Plans Examiner I linzhi.douglass@aspen.gov I(Office):970.429.2020 Email:Your Permit Application 24-1034 for 920 E HYMAN AVE,ASPEN:273718206005 has been received! Type Billable Assigned To Stephen Simmons Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 4/11/2024 Days in Applicant's Hands To:aspenhomeinsp@gmail.com CC: BCC: Attachment:--none-- Comments Subject:Your Permit Application 24-1034 for 920 E HYMAN AVE,ASPEN:273718206005 has been received! Body: Hello Stephen Simmons, We have received your application 24-1034 for 920 E HYMAN AVE,ASPEN:273718206005.A Permit Coordinator from the appropiate office will take ownership of your application,review it for completeness,and process it accordingly. The City of Aspen. Permit Review Type Building Billable ✓ Assigned To Linzhi Douglass 000 9/23-10/2 Number of Hours 1.25 Total Cost $406.25 Fee Generated Date 5/9/2024 Start Date Completed Date 5/8/2024 Days in Applicant's Hands Comments Contacts STEPHEN SIMMONS Account Aspen Home Inspections,LLC Type Applicant Active Contractor License Count 1.00 Number 0067144 STEPHEN SIMMONS Account Aspen Home Inspections,LLC Type Contractor Active Contractor License Count 1.00 Number 0067145 STEPHEN SIMMONS Account Aspen Home Inspections,LLC Type Contractor Active Contractor License Count 1.00 Number 0069743 Fees 0095136 Type Use Tax Deposit-City of Aspen Total $367.50 Waived/Refunded Amt https://cityofaspen.my.salesforce.com/a038X00002N1dfAQAR/p 7/14 9/18/25,5:53 PM 0006-2024-BREP—Salesforce-Enterprise Edition Discount$ Outstanding $0.00 Fee Due At Ready for Issue Show in Cart ✓ Paid in Full V. Fee Paid Date/Time 0095137 Type Use Tax Deposit-Pitkin County Total $67.50 Waived/Refunded Amt Discount$ Outstanding $0.00 Fee Due At Ready for Issue Show in Cart V. Paid in Full ✓ Fee Paid Date/Time 0095138 Type Building Repair Permit Fee Total $25.00 Waived/Refunded Amt Discount$ Outstanding $0.00 Fee Due At Ready for Issue Show in Cart V. Paid in Full V. Fee Paid Date/Time 0095139 Type Parks Permit Review Fee Total $12.60 Waived/Refunded Amt Discount$ Outstanding $0.00 Fee Due At Complete Pending Submittal Fees Show in Cart ✓ Paid in Full V Fee Paid Date/Time 0095151 Type Building Hourly Review Fee Total $406.25 Waived/Refunded Amt Discount$ Outstanding $0.00 Fee Due At Ready for Issue Show in Cart ✓ Paid in Full V. Fee Paid Date/Time Files 920 E HYMAN AVE-0006-2024-BREP_LOC_Final Building_-_IRC_IBC_Letter_of_Completion_20240909.docx Last Modified 9/8/2024,10:07 PM Last Modified 9/8/2024,10:04 PM Created By Martyna Wojtkowska Created By Martyna Wojtkowska Building_- CO City Use Tax -_Final Return Reconciliation_20240909.pdf Building_-_Permit_Issuance_and_Use_Tax_Letter_20240530.pdf Last Modified 9/8/2024,9:58 PM Last Modified 5/30/2024,1:16 PM Created By Martyna Wojtkowska Created By Emily Page Building=_Cover_Sheet_20240509.pdf Permit Application 2024-04-11 21:18:12.pdf Last Modified 5/8/2024,11:19 PM Last Modified 4/11/2024,3:18 PM Created By Linzhi Douglass 000 9/23-10/2 Created By Stephen Simmons Inspections INS-0002414-24 Status Accepted as Noted Type Building Subtype Initial Requested Date 6/19/2024,8:00 AM Scheduled Start Date 6/19/2024 Completed Date 6/19/2024 Assigned Owner Steve Feder No longer active(retired) Permit Inspection Round Initial Inspection Closed TRUE https://cityofaspen.my.salesforce.com/a038X00002N1dfAQAR/p 8/14 9/18/25,5:53 PM 0006-2024-BREP—Salesforce-Enterprise Edition INS-0002553-24 Status Accepted as Noted Type Building&Referral Inspection Status Subtype Requested Date 7/16/2024,3:45 PM Scheduled Start Date 7/16/2024 Completed Date 7/16/2024 Assigned Owner Steve Feder No longer active(retired) Permit Inspection Round Final Inspection Closed TRUE INS-0002554-24 Status Accepted as Noted Type HPC Subtype Requested Date 7/17/2024,9:16 AM Scheduled Start Date Completed Date 7/25/2024 Assigned Owner Stuart Hayden Permit Inspection Round Final Inspection Closed TRUE INS-0002555-24 Status Pass/Accepted Type Parks Subtype Requested Date 7/17/2024,9:17 AM Scheduled Start Date Completed Date 7/16/2024 Assigned Owner Parks-Inspection Permit Inspection Round Final Inspection Closed TRUE INS-0003726-24 Status Partial/Non-Complete Type Building Subtype Final Building Requested Date 7/26/2024,8:00 AM Scheduled Start Date 7/29/2024 Completed Date 7/29/2024 Assigned Owner Ric Bennett-Deactivated 4/4/25 Permit Inspection Round Final Inspection Closed TRUE INS-0003767-24 Status Pass/Accepted Type Building Subtype Final Building Requested Date 8/27/2024,10:31 AM Scheduled Start Date 8/27/2024 Completed Date 8/27/2024 Assigned Owner Ric Bennett-Deactivated 4/4/25 Permit Inspection Round Re-Inspection Closed TRUE Milestones Review Round 1 -0006-2024-BREP Status Approved Due Date Created Date 5/8/2024 Payments PY-021237 Related To 0006-2024-BREP Amount $866.25 Created Date 5/28/2024 Payment Source R-0019870 Receipt-Amount Remaining R-0019870:$0 PY-020999 Related To 0006-2024-BREP Amount $12.60 Created Date 5/8/2024 Payment Source R-0019659 Receipt-Amount Remaining R-0019659:$0 https://cityofaspen.my.salesforce.com/a038X00002N1dfAQAR/p 9/14 9/18/25,5:53 PM 0006-2024-BREP—Salesforce-Enterprise Edition Related Permits 0052-2024-TREE Type Tree Address 920 E HYMAN AVE Work Type New Status Closed-Final Applicant STEPHEN SIMMONS Issue Date 6/20/2024 Last Activity Date 0446-2024-CPRK Type Parking Reservation Address 920 E HYMAN AVE Work Type New Status Closed-Final Applicant Andrew Shaw Issue Date 8/21/2024 Last Activity Date 0151-2024-M EC H Type Mechanical Address 920 E HYMAN AVE Work Type New Status Closed-Final Applicant WES WILEY Issue Date 7/1/2024 Last Activity Date 7/24/2024 Reviews REV-036057 Milestone Review Round 1-0006-2024-BREP Status Approved Type Building Due Date Completed Date 5/8/2024,11:23 PM Assigned Owner Linzhi Douglass 000 9/23-10/2 On Hold Created Date 5/8/2024 REV-036058 Milestone Review Round 1-0006-2024-BREP Status Approved with Conditions Type Parks Due Date Completed Date 5/14/2024,2:34 PM Assigned Owner Joseph Pewitt On Hold Created Date 5/8/2024 REV-036059 Milestone Review Round 1-0006-2024-BREP Status Approved with Conditions Type HPC Due Date Completed Date 5/20/2024,10:39 AM Assigned Owner Stuart Hayden On Hold Created Date 5/8/2024 REV-036060 Milestone Review Round 1-0006-2024-BREP Status Approved Type Engineering CMP Due Date Completed Date 5/14/2024,7:54 AM Assigned Owner Engineering CMP-Review On Hold Created Date 5/8/2024 Submissions 920 E Hyman-Foundation Repair of Western CO Specs.pdf Actions Submission Date 4/30/2024,2:38 PM Latest Submission Date Status https://cityofaspen.my.salesforce.com/a038X00002N1dfAQAR/p 10/14 9/18/25,5:53 PM 0006-2024-BREP—Salesforce-Enterprise Edition Required Description Stephen Simmons_BEST card_HISTORIC 4.10.24 EXP 4.10.27.pdf Actions Submission Date 5/8/2024,10:13 AM Latest Submission Date Status Required Description COA Permit Application_Signatures Packet.pdf Actions Submission Date 5/8/2024,1:27 PM Latest Submission Date Status Required Description 90.Structural Plans.20210428.pdf Actions Submission Date 4/11/2024,3:12 PM Latest Submission Date Status Required Description 2020-07-14_920 E HYMAN_Permit Responses 1 Compiled[1].pdf Actions Submission Date 4/11/2024,3:12 PM Latest Submission Date Status Required Description 920 EAST HYMAN-WATERPROOFING FAILURE AREAS.pdf Actions Submission Date 4/11/2024,3:12 PM Latest Submission Date Status Required Description 920 E HYMAN-PHOTOS.pdf Actions Submission Date 4/29/2024,3:05 PM Latest Submission Date Status Required Description 920 E HYMAN-CONSTRUCTION ACTIVITIES NARRATIVE.pdf Actions Submission Date 4/29/2024,5:27 PM Latest Submission Date Status Required Description 920 E HYMAN-CMP.pdf Actions Submission Date 4/29/2024,7:44 PM Latest Submission Date Status Required Description 920 E HYMAN-PLANTS REMOVED FROM SIDING.pdf Actions Submission Date 8/26/2024,10:29 AM Latest Submission Date Status Required Description https://cityofaspen.my.salesforce.com/a038X00002N1dfAQAR/p 11/14 9/18/25,5:53 PM 0006-2024-BREP—Salesforce-Enterprise Edition Permit History 3/14/2025,2:07 PM User Fernando Cruz Action Changed Owner from Martyna Wojtkowska to Fernando Cruz. 9/8/2024,10:07 PM User Martyna Wojtkowska Action Changed Status from Ready for Closure to Closed-Final. 9/8/2024,9:57 PM User Martyna Wojtkowska Action Changed Owner from Linzhi Douglass to Martyna Wojtkowska. 8/28/2024,6:14 AM User Ric Bennett-Deactivated 4/4/25 Action Changed Expiration Date from 2/23/2025 to 2/24/2025. 8/28/2024,6:14 AM User Ric Bennett-Deactivated 4/4/25 Action Changed Status from Final Inspections to Ready for Closure. 8/27/2024,6:30 AM User Ric Bennett-Deactivated 4/4/25 Action Changed Expiration Date from 2/22/2025 to 2/23/2025. 8/26/2024,10:33 AM User Stephen Simmons Action Changed Expiration Date from 1/26/2025 to 2/22/2025. 7/30/2024,6:14 AM User Ric Bennett-Deactivated 4/4/25 Action Changed Expiration Date from 1/25/2025 to 1/26/2025. 7/29/2024,6:24 AM User Ric Bennett-Deactivated 4/4/25 Action Changed Expiration Date from 1/22/2025 to 1/25/2025. 7/26/2024,6:49 AM User Josh Nye Action Changed Expiration Date from 1/21/2025 to 1/22/2025. 7/25/2024,12:19 PM User Stuart Hayden Action Changed Status from Issued to Final Inspections. 7/25/2024,12:07 PM User Stuart Hayden Action Changed Expiration Date from 1/20/2025 to 1/21/2025. 7/24/2024,1:08 PM User Stuart Hayden Action Changed Expiration Date from 1/12/2025 to 1/20/2025. 7/16/2024,7:01 AM User Steve Feder No longer active(retired) Action Changed Expiration Date from 1/11/2025 to 1/12/2025. 7/15/2024,3:46 PM User Stephen Simmons Action Changed Expiration Date from 12/17/2024 to 1/11/2025. 6/20/2024,6:11 AM User Steve Feder No longer active(retired) Action Changed Expiration Date from 12/16/2024 to 12/17/2024. 6/19/2024,7:20 AM User Steve Feder No longer active(retired) Action Changed Expiration Date from 12/15/2024 to 12/16/2024. 6/18/2024,12:51 PM User Stephen Simmons https://cityofaspen.my.salesforce.com/a038X00002N1dfAQAR/p 12/14 9/18/25,5:53 PM 0006-2024-BREP—Salesforce-Enterprise Edition Action Changed Expiration Date to 12/15/2024. 5/30/2024,1:16 PM User Emily Page Action Changed Issue Date to 5/30/2024.Changed Status from Ready for Issue to Issued. 5/28/2024,10:37 AM User Martyna Wojtkowska Action Changed Total Payments from$12.60 to$878.85. 5/23/2024,9:43 AM User Martyna Wojtkowska Action Changed Status from Final Review Complete to Ready for Issue. 5/23/2024,9:39 AM User Denis Murray Action Changed Status from Hold to Final Review Complete. 5/22/2024,10:28 AM User Denis Murray Action Changed Status from Final Review to Hold. 5/21/2024,2:01 PM User Linzhi Douglass 000 9/23-10/2 Action Changed Status from Permit Review to Final Review. 5/9/2024,2:53 AM User AnnMarie Prince Action Changed Total Fees from$472.60 to$878.85. 5/8/2024,2:29 PM User Linzhi Douglass 000 9/23-10/2 Action Changed Number from 24-1034 to 0006-2024-BREP.Changed Status from Complete Pending Submittal Fees to Permit Review. 5/8/2024,1:53 PM User Stephen Simmons Action Changed Total Payments from$0.00 to$12.60. 5/8/2024,1:48 PM User Linzhi Douglass 000 9/23-10/2 Action Changed Status from Application Completeness Review to Complete Pending Submittal Fees. 5/8/2024,1:46 PM User Linzhi Douglass 000 9/23-10/2 Action Changed Total Payments to$0.00.Changed Total Fees to$472.60.Changed Create Fees from false to true.Changed Status from Completeness Review Failed to Application Completeness Review. 4/28/2024,12:25 PM User Linzhi Douglass 000 9/23-10/2 Action Changed Queue Designation to Repairs. 4/28/2024,12:24 PM User Linzhi Douglass 000 9/23-10/2 Action Changed Status from New Application to Completeness Review Failed. 4/17/2024,8:46 AM User Linzhi Douglass 000 9/23-10/2 Action Changed Owner from PC-Comm Dev to Linzhi Douglass. 4/11/2024,3:18 PM User Stephen Simmons Action Changed Owner from Stephen Simmons to PC-Comm Dev. 4/11/2024,3:18 PM User Stephen Simmons Action Changed Status from Draft Application to New Application. 4/11/2024,3:10 PM User Stephen Simmons Action Changed Valuation from$120,000.00 to$135,000.00. https://cityofaspen.my.salesforce.com/a038X00002N1dfAQAR/p 13/14 9/18/25,5:53 PM 0006-2024-BREP—Salesforce-Enterprise Edition 4/11/2024,2:27 PM User Stephen Simmons Action Changed Valuation to$120,000.00.Changed Address to 920 E HYMAN AVE,ASPEN:273718206005. 4/11/2024,2:10 PM User Stephen Simmons Action Changed Bluebeam Project Id to 527-301-496. 4/11/2024,2:10 PM User Stephen Simmons Action Changed Number to 24-1034.Created. Copyright©2000-2025 salesforce.com,inc.All rights reserved. https://cityofaspen.my.salesforce.com/a038X00002N1dfAQAR/p 14/14