Loading...
HomeMy WebLinkAboutMaster Permit.332 W Main St.0031-2023-BCOM 3/14/25,2:58 PM 0031-2023-BCOM-Salesforce-Enterprise Edition • Close Window • Print This Page • Expand All I Collapse All 0031-2023-BCOM Address 332 W MAIN ST 101 Record Type Building Number 0031-2023-BCOM Owner Fernando Cruz Original Number 23-1494 Status Closed-Final Type Building Reason for Cancel or Compl. Review Fail Applicant MARK HARDEMAN Aspen Internal? No Account FORUM PHI ARCHITECTURE Required Bond Amount Project Total Available Bond Amount Land Use Planning Application Bluebeam Project Id 578-462-158 Permit Contractor Boulder Construction Services,LLC HPC-ZON-EH-UTIL Review HPC Rev, Valid Business License on HPC-ZON-EH-UTIL Review-2 Account Imported Eng Review Eng-Dev Rev,Eng-ES Rev,Util Rev,Eng-Wtr Rev, Required Submissions Parks-Prkng-San Review Parks Rev,Parks Fee,San Rev, Documents Resubmitted Conditional Inspections HPC Insp,Parks Insp, Conditional Final Insp HPC Final,Eng-Dev Final,Eng-ES Final,Eng-Wtr Final,Util Final,Parks Final,San Final, Action Items Hold All Reviews Create Fees ,/ Hold Reason Create Fees 2 ,/ Utility Review Type Minor Price Book 2023 Conditional Flat Fee Formula Applicant is a Nonprofit? No Conditional Tiered Fee Formula Eligible for Small Lodge No Program? Conditional Tiered SqFt Fee MIC, Discount All Fees(%) Formula Fee Discount Reason CO/LOC? CO CO Status if Applicable Issued Queue Score Project Designation New Minor Permits Milestone Current Days in 10 Applicant Hand Queue Designation Response to Comments-Simple Milestone Current Days in City 7 Hands Queue Score 0 Milestone-Total Days in 12 Applicant Hand Last Date Received from Milestone-Total Days in City 88 Applicant Hands Dates New Application Date 5/11/2023 TCO Issuance Date Application Complete Date 6/19/2023 Close/CO Issuance Date 8/19/2024 Application Accepted Date 6/19/2023 Expiration Date 2/1/2025 Issue Date 11/1/2023 Override Expiration Date Days to Issue 135 Last Activity Date 8/5/2024 Basic Information Description A minor interior renovation of an existing commercial Census Code 434 R-Remodel only(no new Sq Ft) space,the addition of a required exterior accessible walkway,and renovations to the exterior front porch to allow the entry door threshold to comply with current accessibility standards. Use of Building Commercial Interior Remodel Only Use Class Commercial Class of Work Alteration Permit Comments Parks Comments: Contact City Forester/Parks Department for inspection PRIOR to pruning any existing tree roots greater than 1.5"diameter within disturbance area. https://cityofaspen.my.salesforce.com/a038X00002AHeiuQAD/p 1/21 3/14/25,2:58 PM 0031-2023-BCOM Salesforce-Enterprise Edition Engineering Comments: Contractor shall maintain proper erosion control BMPs during excavation and concrete placement.This shall include perimeter controls during excavation and an appropriate concrete wash-out during concrete placement.Additional erosion control measures may be required. ALL Construction Management Plan requirements shall be maintained as identified under the Master Permit#0031-2023-BCOM Utilities-Utilities Affected area is 990 sf total. Job Location Address 332 W MAIN ST 101,ASPEN:273512441012 Lot Site Address Display on Map Legal Description Subdivision:3RD&MAIN CONDO Unit:AAKA UNIT 101 Historic Property? Yes Eden Address Historic District? Yes HPC-Planning-Zoning Details Zone District MU HOA/Covenant HOA/CovenantApproval Acquired Is There an ADU? No HPC Certificate of Yes Appropriateness? ADU Sq Ft 0 Work Involves a Land Use No Approval? Deed Restricted? No Located in a PD? No #of Dwellings 0 Adds/Changes Floor Area? No Category of Zoning Fee Commercial Occupancy or Use Change? No Zoning Work Level Minor Zoning Fee Work Affects Exterior of Yes Building? Building Project Details Valuation $371,800.00 Lot Size Sq.Ft. 4,500 Reason for Valuation Change Soil Disturbance Sq Ft 262 Unit Sq.Ft. 2,443 Affected Area Sq Ft 262 Building Footprint Sq Ft 0 Existing Hardscape Footprint Sq 112 Ft Sq Ft of Building Work Area 262 Existing Hardscape%of Lot 2% Building Fire Area Sq Ft Con Mit Sq Ft Total 524 Utility Review Sq.Ft. 721 Utility Review Sq Ft Total 262 %of Interior being Altered 5% New Sq.Ft. 0 Scope of Work Details Work Changes Building No Work Affects Tree/Drip Line? Yes Footprint? Work Changes No Located Within City Mall No Fenestration/Thrml Envelop? Boundaries? Requires Asbestos Test? Yes Adjacent to City Open Space? No Photovoltaic Installation No Impacts City Trails/Parks? No Work Adds/Removes/Changes Yes Work Subject to Water Efficient No Plumbing Fixt? L.O.? Restaurant/Food Service No Involves Impact on Sewer? No Involved? Change of Restaurant No Prevents Access to Sewer Main? No Ownership? Affects Parking/Alleys/Loading? No Sewer Easements Affected? No Utility Water Details Already on City Water? Class of Service Customer Utility Account Number Water Service Area Water Service Agreement Is There Well or Wells on the Required? Property? Common Building Name Abandon Existing Well Abandon Existing Tap Acre-feet of Water Currently by Well Date of Existing Tap Acre-feet of Water Rights to be Conveyed Existing Tap Modifications? Existing ECU Count New Tap? If Residential App,Estimated New ECUs Date of New Tap Final ECU Count Does Project Involve Outdoor Number of Meters Proposed Irrigation? https://cityofaspen.my.Salesforce.com/a038X00002AHeiuQAD/p 2/21 3/14/25,2:58 PM 0031-2023-BCOM Salesforce-Enterprise Edition Irrigated Area Sq Ft Size of Existing Domestic Water Line Identify ALL Sources of Water Size of Proposed Domestic Water Line Is There a Pool,Spa or Water Size of Existing Fire Feature? Suppression Line Summary of Prior Water Fees Size of Proposed Fire Paid Suppression Line Building Description Code Editions 2021 IBC Required Special Inspections Other Code Editions 2021 IEBC Energy Code Compliance COMCheck UAAlternative Building Type(IRC) Total Snowmelt Sq Ft 0 Construction Type VB Total Spa Sq Ft 0 Occupancy Load 26 Total Pool Sq Ft 0 Occupancy Group B Amount of Onsite Renewable No Generation? Fire Sprinkler Existing? No CO Description Fire Sprinkler Required? No Basement Fire Sprinkler Type 1st Floor Fire Alarms Installed? None 2nd Floor #Wood Fireplaces 3rd Floor #Gas Log Fireplaces Additional #Gas Appliances Open Text Field For Comments Financials Total Fees $22,655.09 Total Payments $22,655.09 Fees Due at Current Status $13,413.30 Total Balance $0.00 System Information Number 0031-2023-BCOM Community Visibility Created By MARK HARDEMAN,5/11/2023 10:39AM Contact IDs 0036A00000c6evLQAQ,0033s000013AhMHAA0,0034o00001191Z9AA1 Bluebeam Project Id 578-462-158 IsTestData? BB Project Name 332 W MAIN ST 101-0031-2023-BCOM Last Modified By Fernando Cruz,3/14/2025 2:54 PM VIP Form Tool VIP 5/11/2023 VIP [{"parentCategoryld":null,"isSubmit":null,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryld":"a2E6A000000UwvPUAS"), Submitted 11:16AM Template ("parentCategoryld":null,"isSubmit":null,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryld":"a2E6A000000UwvNUAS"), Status {"parentCategoryld":null,"isSubmit":null,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryld":"a2E6A000000iWidUAE"), {"parentCategoryld":null,"isSubmit":nu II,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryld":"a2E6A000000UwvVUAS"), {"parentCategoryld":null,"isSubmit":nu II,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryld":"a2E6A000000UwvKUAS"), ("parentCategoryld":null,"isSubmit":nu II,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryld":"a2E6A000000UwvXUAS"), ("parentCategoryld":null,"isSubmit":nu II,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryld":"a2E6A000000UwvaUAC"), ("parentCategoryld":null,"isSubmit":nu II,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryld":"a2E6A000000UwvZUAS"), ("parentCategoryld":null,"isSubmit":true,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryld":"a2E6A000000Ux1 dUAC")] VIP VIP Permit Application Foreign Form Language Template Action Items View/Print Permit Link Attachment View GIS Map View Milestone Gantt Chart Activity History Email:Certificate of Occupancy:Permit 0031-2023-BCOM at 332 W MAIN ST 101,ASPEN:273512441012 Type Billable Assigned To Emily Page 000 3/10-3/14,Chatter Sydney Fallon Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 8/19/2024 Days in Applicant's Hands Comments To:mhardeman@forumphi.com CC:matt.jurmu@bouldercs.com BCC: Attachment:Building_-_CO_City_Use_Tax_-_Final_Return_Reconciliation_20240815.pdf,Building_- CO City Use Tax - _FRR_Notice_to_Contractor_20240819.pdf,332 W MAIN ST 101-0031-2023-BCOM_CO_final.pdf Subject:Certificate of Occupancy:Permit 0031-2023-BCOM at 332 W MAIN ST 101,ASPEN:273512441012 https://cityofaspen.my.salesforce.com/a038X00002AHeiuQAD/p 3/21 3/14/25,2:58 PM 0031-2023-BCOM—Salesforce-Enterprise Edition Body: Hello MARK HARDEMAN, Please find attached your issued certificate of occupancy for the completed project at 332 W MAIN ST 101,ASPEN:273512441012. If applicable,you will find attached the contractor's city use tax letters and tax reconciliation forms.Please distribute these as necessary. If you have any questions about use tax or how to fill out the forms,please contact Bebo Salib at bebo.salib@aspen.gov or 970.920.5043. For questions about this permit,you can reply to this email. Email:Utility Connection Permit Final Type Billable Assigned To Steve Wilson Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 7/24/2024 Days in Applicant's Hands To:mhardeman@forumphi.com CC:kathy.rogo@aspen.gov;cole.langford@aspen.gov;mary.ferguson@aspen.gov BCC: Attachment:332 W.Main St.#101 Final Packet.pdf Subject:Utility Connection Permit Final Body: Hello MARK HARDEMAN, Attached is your final Utility Connection Permit for the completed project at 332 W MAIN ST 101 associated with permit#:0031-2023-BCOM. Comments After review,please print,have signed by owner,and notarized.Once signed and notarized,please upload the signed and notarized copy of the UCP as a SCANNED(not photographed)copy to Salesforce and send a chatter to @Robert Gregor and @Cole Langford on the permit record once the document is uploaded to serve as a"push"notification that these permit requirements are complete. Alternatively,you may bring a copy of the signed and notarized UCP with a check,if applicable,to the Finance Department window located on the second floor of City Hall at 427 Rio Grande Place.Submission via Salesforce is strongly recommended to facilitate faster turnaround. Please reach out with any questions or concerns. Thank you, Steve Email:Building Permit 0031-2023-BCOM-332 W MAIN ST 101,ASPEN:273512441012-Issued Type Billable Assigned To Martyna Wojtkowska Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 11/1/2023 Days in Applicant's Hands To:mhardeman@forumphi.com CC:matt.jurmu@bouldercs.com BCC: Attachment:Building_-_Permit_Issuance_20231101.pdf Subject:Building Permit 0031-2023-BCOM-332 W MAIN ST 101,ASPEN:273512441012-Issued Body: MARK HARDEMAN, Please find attached your issued building permit for 0031-2023-BCOM for 332 W MAIN ST 101,ASPEN:273512441012 and City Use Tax exemption letter,if applicable. Below is a link to your plans.Please print these 24x36 in color and keep them on site at all times.As a reminder,links will expire in 30 days so please download the plans as soon as you get this email. https://cityofaspen.sharepoint.com/:f:/s/COA-IssuedB u i Id i ng Plans Pu bl icRecords/EII RKkTHx8N DkD-55kTgp4M BclkCabcHs6w_J9N59G DhOw? Comments e=A6bEbF All inspections are scheduled through the Salesforce applicant portal. BUILDING INSPECTIONS REQUESTED BY 7:30 PM WILL BE SCHEDULED FOR THE NEXT BUSINESS DAY.REQUESTS AFTER 7:30 PM WILL BE SCHEDULED FOR THE FOLLOWING BUSINESS DAY.ALLOW THE ENTIRE DAY FOR THE INSPECTION. PLEASE NOTE THAT ALL REFERRAL AGENCIES MUST APPROVE THEIR FINAL INSPECTIONS PRIOR TO THE FINAL BUILDING INSPECTION. WHAT INSPECTIONS DO I NEED?Please visit here:https://www.aspen.gov/DocumentCenter/View/7847/-What-Inspections-are-Needed-for-my-Permit? bidld= HOW TO SCHEDULE AN INSPECTION ONLINE?Please visit here:https://www.aspen.gov/DocumentCenter/View/6436/How-to-request-an-inspection? bidld= For questions on inspections please email buildinginspectors@aspen.gov If you are experiencing system issues,please contact sfsupport@cityofaspen.com or call 970-920-5065. https://cityofaspen.my.salesforce.com/a038X00002AHeiuQAD/p 4/21 3/14/25,2:58 PM 0031-2023-BCOM—Salesforce-Enterprise Edition Email:Permit Fees Due:0031-2023-BCOM at 332 W MAIN ST 101,ASPEN:273512441012 Type Billable Assigned To Martyna Wojtkowska Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 10/31/2023 Days in Applicant's Hands To:mhardeman@forumphi.com CC: BCC: Attachment:--none-- Subject:Permit Fees Due:0031-2023-BCOM at 332 W MAIN ST 101,ASPEN:273512441012 Body: If you have not already paid the fees due on your permit 0031-2023-BCOM,at 332 W MAIN ST 101,ASPEN:273512441012,please log into the Aspen Permitting Portal to pay them.If you pay online,be aware that credit card or e-check transaction fees will apply. If you would like to pay by check,you can mail payments to the following locations: •Building and related permits:Community Development,427 Rio Grande •Parking Reservation permits:Parking Department,427 Rio Grande •Pitkin County Water Permit:Utility Billing.,427 Rio Grande •ROW and encroachments:427 Rio Grande Comments •Tree permits:Parks Dept.,585 Cemetery Lane Aspen •Utility Connection Permits:Utility Billing.,130 S Galena,1st Floor •Electric Community Investment Fee:Utility Billing.,130 S Galena,1st Floor Current Amount Due:$13,413.30 Instructions to see detail of fees due: -Log in to the Portal here:https://cityofaspen.force.com and click on Permits menu -Open the permit by clicking on the permit number link -Click on the Related tab(next to Details tab)and scroll down to Fees section -If all fees are not visible,click the"View All"link -To filter fees,click on the black funnel icon at the top right.(Example:to only see the fees due at permit submission,select"Complete Pending Submittal Fees"under Permit Fees Due At section and then click Apply button.) Instructions to pay fees are found here:https://www.aspen.gov/DocumentCenter/View/5008/Paying-for-an-Application-?bidld= Thank you! City of Aspen Email:Building Comments-0031-2023-BCOM-332 W MAIN ST 101 Type Billable Assigned To Sam Irmen Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 8/16/2023 Days in Applicant's Hands To:mhardeman@forumphi.com CC:denis.murray@aspen.gov;sydney.fallon@aspen.gov BCC: Attachment:_BuildingCommentl_332 W.Main St.101_0031-2023-BCOM.pdf Subject:Building Comments-0031-2023-BCOM-332 W MAIN ST 101 Body: Hello MARK HARDEMAN, I've reviewed your permit application;please see the attached comment list.Please contact me directly if you have any questions on the comments. You may resubmit your responses online when you have received comments or approval from all applicable review agencies.Please be sure to reach out to your permit coordinator to ensure you've received all applicable comments prior to uploading responses.Once you have uploaded you comments online,please email your permit coordinator directly to notify them as they will not receive an automated email from our system. Comments Address:332 W MAIN ST 101 Permit Number:0031-2023-BCOM Permit Coordinator:Sydney Fallon These design documents have been reviewed for conformance to the International Codes as adopted and amended by the City of Aspen.State and Federal regulations are administered where applicable.You can find a copy of all adopted codes,ordinances,and policies on our website. The attached corrections are required to be addressed.Revise and redraw the plans to clearly respond to the attached comments and resubmit this comment letter with your written response to each comment on this list.Indicate which detail or specification page shows the required information. Responses such as"will comply with code"are not adequate.Revised drawings must clearly show code compliance. Building plan check is only one part of the often complex process by which projects are reviewed for approval.These parts are interrelated and are sometimes conflicting.It is ultimately the applicant's responsibility to coordinate these requirements. Email:Parks Comments-Building Permit#0031-2023-BCOM,Address 332 W MAIN ST 101,ASPEN:273512441012 Type Billable Assigned To Joseph Pewitt Number of Hours https://cityofaspen.my.salesforce.com/a038X00002AHeiuQAD/p 5/21 3/14/25,2:58 PM 0031-2023-BCOM—Salesforce-Enterprise Edition Total Cost $0.00 Fee Generated Date Start Date Completed Date 6/28/2023 Days in Applicant's Hands To:mhardeman@forumphi.com CC: BCC: Attachment:Parks 1-332 W Main St.101-0031-2023-BCOM.pdf Subject:Parks Comments-Building Permit#0031-2023-BCOM,Address 332 W MAIN ST 101,ASPEN:273512441012 Body: Dear MARK HARDEMAN, I've reviewed your permit application;please see the attached comment list.Please contact me directly if you have any questions on the comments. You may resubmit your responses online when you have received comments or approval from all applicable review agencies.Please be sure to reach out to your permit coordinator to ensure you've received all applicable comments prior to uploading responses.Once you have uploaded your comments online,please email your permit coordinator directly to notify them as they will not receive an automated email from our system. Comments Address:332 W MAIN ST 101,ASPEN:273512441012 Permit Number:0031-2023-BCOM Permit Coordinator:Sydney Fallon The attached corrections are required to be addressed.Revise and redraw the plans to clearly respond to the attached comments and resubmit this comment letter with your written response to each comment on this list.Indicate which detail or specification page shows the required information. Responses such as"will comply with code"are not adequate.Revised drawings must clearly show code compliance. Parks plan check is only one part of the often complex process by which projects are reviewed for approval.These parts are interrelated and are sometimes conflicting.It is ultimately the applicant's responsibility to coordinate these requirements. Please review City Code 13.20.020 for code compliance. Joseph Pewitt Parks Department 970-429-2025 Email:Engineering Comments-0031-2023-BCOM-332 W MAIN ST 101 Type Billable Assigned To Kyla Smits Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 6/23/2023 Days in Applicant's Hands To:mhardeman@forumphi.com CC:kyla.smits@aspen.gov BCC: Attachment:Engineering-1-332 W Main St-0031-2023-BCOM.pdf Subject:Engineering Comments-0031-2023-BCOM-332 W MAIN ST 101 Body: Hello MARK HARDEMAN, I've reviewed your permit application;please see the attached comment list.Please contact me directly if you have any questions on the comments. You may resubmit your responses online when you have received comments or approval from all applicable review agencies.Please be sure to reach out to your permit coordinator to ensure you've received all applicable comments prior to uploading responses.Once you have uploaded your comments online,please email your permit coordinator directly to notify them as they will not receive an automated email from our system. Address:332 W MAIN ST 101 Permit Number:0031-2023-BCOM Comments Permit Coordinator:Sydney Fallon These design documents have been reviewed for conformance to the Engineering Design Standards and URMP as adopted and amended by the City of Aspen.State and Federal regulations are administered where applicable.You can find a copy of all adopted codes,ordinances,and policies on our website. The attached corrections are required to be addressed.Revise and redraw the plans to clearly respond to the attached comments and resubmit this comment letter with your written response to each comment on this list.Indicate which detail or specification page shows the required information. Responses such as"will comply with code"are not adequate.Revised drawings must clearly show code compliance. Engineering Review is only one part of the often complex process by which projects are reviewed for approval.These parts are interrelated and are sometimes conflicting.It is ultimately the applicant's responsibility to coordinate these requirements. Kyla Smits(she/her/hers) Project Manager I Engineering (C):970.274.7244 www.aspen.gov Email:City of Aspen Utility Water Connection Permit(UCP)Required Type Billable Assigned To Robert Gregor Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 6/21/2023 https://cityofaspen.my.salesforce.com/a038X00002AHeiuQAD/p 6/21 3/14/25,2:58 PM 0031-2023-BCOM—Salesforce-Enterprise Edition Days in Applicant's Hands To:mhardeman@forumphi.com CC: BCC: Attachment:--none-- Subject:City of Aspen Utility Water Connection Permit(UCP)Required Body: Hello MARK HARDEMAN, You recently submitted a permit to the City of Aspen,#0031-2023-BCOM,for the property located at 332 W MAIN ST 101,ASPEN:273512441012,and during the Utilities review on this permit,we determined that you are required to apply for a Utility Water Connection permit application(UCP). To submit this application,please click on the link below to the City of Aspen Applicant Portal(or paste it into your browser),and once logged into the Comments portal,click the Next button to start a new application(located at the center of the portal home page). Link to Applicant Portal:https://cityofaspen.force.com Please be aware the City Reviewers will need both the architectural plans and a completed ECU calculator to perform a fixture count review,and that we will not be able to approve Utilities review on your current permit 0031-2023-BCOM until you submit a UCP application and all required tap fees are paid. If you have any questions,please feel free to contact me at the number below. Sincerely, City of Aspen Utilities Department (970)429-1993 Email:Permit Fees Due:23-1494 at 332 W MAIN ST 101,ASPEN:273512441012 Type Billable Assigned To Sydney Fallon Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 6/8/2023 Days in Applicant's Hands To:mhardeman@forumphi.com CC: BCC: Attachment:--none-- Subject:Permit Fees Due:23-1494 at 332 W MAIN ST 101,ASPEN:273512441012 Body: If you have not already paid the fees due on your permit 23-1494,at 332 W MAIN ST 101,ASPEN:273512441012,please log into the Aspen Permitting Portal to pay them.If you pay online,be aware that credit card or e-check transaction fees will apply. If you would like to pay by check,you can mail payments to the following locations: •Building and related permits:Community Development,427 Rio Grande •Parking Reservation permits:Parking Department,427 Rio Grande •Pitkin County Water Permit:Utility Billing.,427 Rio Grande •ROW and encroachments:427 Rio Grande Comments •Tree permits:Parks Dept.,585 Cemetery Lane Aspen •Utility Connection Permits:Utility Billing.,130 S Galena,1st Floor •Electric Community Investment Fee:Utility Billing.,130 S Galena,1st Floor Current Amount Due:$8,061.83 Instructions to see detail of fees due: -Log in to the Portal here:https://cityofaspen.force.com/applicantportal and click on Permits menu -Open the permit by clicking on the permit number link -Click on the Related tab(next to Details tab)and scroll down to Fees section -If all fees are not visible,click the"View All"link -To filter fees,click on the black funnel icon at the top right.(Example:to only see the fees due at permit submission,select"Complete Pending Submittal Fees"under Permit Fees Due At section and then click Apply button.) Instructions to pay fees are found here:https://www.aspen.gov/DocumentCenter/View/5008/Paying-for-an-Application-?bidld= Thank you! City of Aspen Email:Your Permit Application 23-1494 for 332 W MAIN ST 101,ASPEN:273512441012 has been received! Type Billable Assigned To MARK HARDEMAN Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 5/11/2023 Days in Applicant's Hands Comments To:mhardeman@forumphi.com CC: BCC: Attachment:--none-- https://cityofaspen.my.salesforce.com/a038X00002AHeiuQAD/p 7/21 3/14/25,2:58 PM 0031-2023-BCOM—Salesforce-Enterprise Edition Subject:Your Permit Application 23-1494 for 332 W MAIN ST 101,ASPEN:273512441012 has been received! Body: Hello MARK HARDEMAN, We have received your application 23-1494 for 332 W MAIN ST 101,ASPEN:273512441012.A Permit Coordinator from the appropiate office will take ownership of your application,review it for completeness,and process it accordingly. The City of Aspen. Permit Review Type Building Billable Assigned To Sam Irmen Number of Hours 5.00 Total Cost $1,625.00 Fee Generated Date Start Date Completed Date 10/13/2023 Days in Applicant's Hands Comments Contacts MARK HARDEMAN Account FORUM PHI ARCHITECTURE Type Applicant Active Contractor License Count 0.00 Number 0057436 MATT JURMU Account Boulder Construction Services,LLC Type Contractor Active Contractor License Count 1.00 Number 0057437 Melody De Los Santos Account FORUM PHI ARCHITECTURE Type Owner's Authorized Agent Active Contractor License Count 0.00 Number 0058478 Fees 0084201 Type Zoning Review Fee Total $162.50 Waived/Refunded Amt Discount$ Outstanding $0.00 Fee Due At Complete Pending Submittal Fees Show in Cart V Paid in Full V. Fee Paid Date/Time 0084202 Type Zoning Review Fee Total $162.50 Waived/Refunded Amt Discount$ Outstanding $0.00 Fee Due At Ready for Issue Show in Cart ✓ Paid in Full ✓ Fee Paid Date/Time 0084203 Type Building Permit Fees Total $10,211.00 Waived/Refunded Amt Discount$ Outstanding $0.00 Fee Due At Ready for Issue Show in Cart ✓ Paid in Full V. Fee Paid Date/Time 0084204 Type Use Tax Deposit-City of Aspen Total $2,853.90 Waived/Refunded Amt https://cityofaspen.my.salesforce.com/a038X00002AHeiuQAD/p 8/21 3/14/25,2:58 PM 0031-2023-BCOM—Salesforce-Enterprise Edition Discount$ Outstanding $0.00 Fee Due At Ready for Issue Show in Cart V Paid in Full ✓ Fee Paid Date/Time 0084205 Type Use Tax Deposit-Pitkin County Total $185.90 Waived/Refunded Amt Discount$ Outstanding $0.00 Fee Due At Ready for Issue Show in Cart V. Paid in Full ✓ Fee Paid Date/Time 0084206 Type Utilities Development Review Fee Total $424.44 Waived/Refunded Amt Discount$ Outstanding $0.00 Fee Due At Complete Pending Submittal Fees Show in Cart ✓ Paid in Full ✓ Fee Paid Date/Time 0084207 Type Engineering Permit Review Fee Total $567.74 Waived/Refunded Amt Discount$ Outstanding $0.00 Fee Due At Complete Pending Submittal Fees Show in Cart ✓ Paid in Full V Fee Paid Date/Time 0084208 Type Parks Permit Review Fee Total $270.00 Waived/Refunded Amt Discount$ Outstanding $0.00 Fee Due At Complete Pending Submittal Fees Show in Cart ✓ Paid in Full ✓ Fee Paid Date/Time 0084209 Type Building Plan Check Fee Total $6,637.15 Waived/Refunded Amt Discount$ Outstanding $0.00 Fee Due At Complete Pending Submittal Fees Show in Cart V. Paid in Full ✓ Fee Paid Date/Time 0096681 Type Utilities Development Review Fee Total $1,179.96 Waived/Refunded Amt Discount$ Outstanding $0.00 Fee Due At Ready for Closure Show in Cart ✓ Paid in Full ✓ Fee Paid Date/Time Files https://cityofaspen.my.salesforce.com/a038X00002AHeiuQAD/p 9/21 3/14/25,2:58 PM 0031-2023-BCOM—Salesforce-Enterprise Edition Building_- CO City Use Tax -_FRR_Notice_to_Contractor_20240819 332 W MAIN ST 101 -0031-2023-BCOM_CO_final Last Modified 8/19/2024 3:26 PM Last Modified 8/19/2024 3:26 PM Created By Emily Page 000 3/10-3/14,Chatter Sydney Fallon Created By Emily Page 000 3/10-3/14,Chatter Sydney Fallon Building_- CO City Use Tax -_FRR_Notice_to_Contractor_20240819.docx Building_- CO City Use Tax -_Final Return Reconciliation_20240815.pdf Last Modified 8/19/2024 3:06 PM Last Modified 8/15/2024 7:15 AM Created By Emily Page 000 3/10-3/14,Chatter Sydney Fallon Created By Emily Page 000 3/10-3/14,Chatter Sydney Fallon Building_- CO City Use Tax -_FRR_Notice_to_Contractor_20240815.docx Building_-_IBC_Certificate_of_Occupancy_20240815.docx Last Modified 8/15/2024 7:15 AM Last Modified 8/15/2024 7:10 AM Created By Emily Page 000 3/10-3/14,Chatter Sydney Fallon Created By Emily Page 000 3/10-3/14,Chatter Sydney Fallon UCP-FINAL-NO FEES-332 W MAIN ST 101 332 W.Main St.#101 Final Packet Last Modified 7/31/2024 2:05 PM Last Modified 7/24/2024 2:51 PM Created By Cole Langford Created By Steve Wilson 2023 Utilities Development Review Fee Invoice-0031-2023-BCOM-332 W Main Building_-_Permit_Issuance_20231101.pdf St 101 Last Modified 11/1/2023 11:55 AM Last Modified 7/3/2024 3:15 PM Created By Martyna Wojtkowska Created By Megan Killer Building_-_Cover_Sheet_20230815.pdf _BuildingCommentl_332 W.Main St.101_0031-2023-BCOM Last Modified 8/15/2023 9:35 AM Last Modified 8/16/2023 11:15 AM Created By Sam Irmen Created By Sam Irmen Engineering-1-332 W Main St-0031-2023-BCOM Parks 1-332 W Main St.101-0031-2023-BCOM Last Modified 6/23/2023 2:22 PM Last Modified 6/28/2023 3:20 PM Created By Kyle Smits Created By Joseph Pewitt Permit Application 2023-05-11 17:16:59.pdf Last Modified 5/11/2023 11:17 AM Created By MARK HARDEMAN Inspections INS-0005554-23 Status Pass/Accepted Type Parks Subtype Requested Date 4/1/2024 9:00 AM Scheduled Start Date Completed Date 4/1/2024 Owner Last Name Pewitt Permit Inspection Round Initial Inspection Closed TRUE INS-0005555-23 Status Pass/Accepted Type HPC Subtype Requested Date 5/29/2024 6:15 PM Scheduled Start Date Completed Date 7/9/2024 Owner Last Name Hayden Permit Inspection Round Initial Inspection Closed TRUE INS-0005579-23 Status Re-Inspection Required Type Building Subtype Rough Framing Requested Date 3/6/2024 11:30 AM Scheduled Start Date 3/6/2024 Completed Date 3/6/2024 Owner Last Name Feder Permit Inspection Round Final Inspection Closed TRUE INS-0005580-23 Status Closed-Not Needed Type Fire Subtype Requested Date Scheduled Start Date Completed Date 3/28/2024 https://cityofaspen.my.salesforce.com/a038X00002AHeiuQAD/p 10/21 3/14/25,2:58 PM 0031-2023-BCOM—Salesforce-Enterprise Edition Owner Last Name Legersky Permit Inspection Round Final Inspection Closed TRUE I NS-0005581-23 Status Pass/Accepted Type Zoning Subtype Requested Date 6/26/2024 6:25 PM Scheduled Start Date 6/26/2024 Completed Date 6/26/2024 Owner Last Name Narracci Permit Inspection Round Final Inspection Closed TRUE INS-0005582-23 Status Pass/Accepted Type Parks Subtype Requested Date 6/26/2024 6:21 PM Scheduled Start Date 6/26/2024 Completed Date 7/2/2024 Owner Last Name Permit Inspection Round Final Inspection Closed TRUE INS-0005583-23 Status Pass/Accepted Type HPC Subtype Requested Date 6/26/2024 6:19 PM Scheduled Start Date Completed Date 7/9/2024 Owner Last Name Hayden Permit Inspection Round Final Inspection Closed TRUE INS-0005584-23 Status Pass/Accepted Type Engineering Erosion&Sediment Subtype Requested Date 6/26/2024 6:23 PM Scheduled Start Date Completed Date 7/3/2024 Owner Last Name Permit Inspection Round Final Inspection Closed TRUE INS-0005585-23 Status Pass/Accepted Type Sanitation Subtype Requested Date 6/26/2024 6:24 PM Scheduled Start Date Completed Date 6/27/2024 Owner Last Name Strait Permit Inspection Round Final Inspection Closed TRUE INS-0005586-23 Status Pass/Accepted Type Engineering Water Subtype Requested Date 6/26/2024 6:23 PM Scheduled Start Date Completed Date 7/2/2024 Owner Last Name Wilson Permit Inspection Round Final Inspection Closed TRUE INS-0005587-23 Status Closed-Not Needed Type Engineering Dev Subtype Requested Date 6/26/2024 6:22 PM https://cityofaspen.my.salesforce.com/a038X00002AHeiuQAD/p 11/21 3/14/25,2:58 PM 0031-2023-BCOM—Salesforce-Enterprise Edition Scheduled Start Date Completed Date 6/21/2024 Owner Last Name Smits Permit Inspection Round Final Inspection Closed TRUE INS-0005588-23 Status Pass/Accepted Type Utilities Subtype Requested Date 6/26/2024 6:25 PM Scheduled Start Date Completed Date 7/31/2024 Owner Last Name Langford Permit Inspection Round Final Inspection Closed TRUE I NS-0000921-24 Status Accepted as Noted Type Building Subtype Rough Framing Requested Date 3/27/2024 8:30 AM Scheduled Start Date 3/27/2024 Completed Date 3/27/2024 Owner Last Name Bennett Permit Inspection Round Re-Inspection Closed TRUE INS-0001326-24 Status Pass/Accepted Type APECC Subtype Insulation Requested Date 4/1/2024 9:00 AM Scheduled Start Date 4/3/2024 Completed Date 4/3/2024 Owner Last Name Bennett Permit Inspection Round Initial Inspection Closed TRUE INS-0003807-24 Status Pass/Accepted Type Building Subtype Final Building Requested Date 8/2/2024 10:00 AM Scheduled Start Date 8/2/2024 Completed Date 8/2/2024 Owner Last Name Feder Permit Inspection Round Final Inspection Closed TRUE MEP Permit Inspections INS-0003333-24 Status Accepted as Noted Type Plumbing Subtype Final Plumbing Permit 0009-2024-PLUM Requested Date 7/11/2024 10:30 AM Scheduled Start Date 7/11/2024 Completed Date 7/11/2024 Owner Alias stevef Closed TRUE INS-0003534-24 Status Pass/Accepted Type Electric Subtype Final Electrical Permit 0316-2023-ELEC Requested Date 7/16/2024 6:42 PM Scheduled Start Date 7/17/2024 Completed Date 7/17/2024 Owner Alias JNye Closed TRUE INS-0000514-24 Status Accepted as Noted Type Plumbing https://cityofaspen.my.salesforce.com/a038X00002AHeiuQAD/p 12/21 3/14/25,2:58 PM 0031-2023-BCOM—Salesforce-Enterprise Edition Subtype Plumbing Waste&Vent Permit 0009-2024-PLUM Requested Date 2/6/2024 10:30 AM Scheduled Start Date 2/6/2024 Completed Date 2/6/2024 Owner Alias stevef Closed TRUE INS-0000541-24 Status Accepted as Noted Type Plumbing Subtype Plumbing Water Pipe Permit 0009-2024-PLUM Requested Date 2/6/2024 12:00 PM Scheduled Start Date 2/6/2024 Completed Date 2/7/2024 Owner Alias stevef Closed TRUE INS-0000839-24 Status Pass/Accepted Type Electric Subtype Rough Electrical Permit 0316-2023-ELEC Requested Date 2/27/2024 9:08 PM Scheduled Start Date 2/28/2024 Completed Date 2/28/2024 Owner Alias 0003/17 Closed TRUE Milestones Review Round 1 -0031-2023-BCOM Status Not Approved Due Date Created Date 6/19/2023 Review Round 2.0-0031-2023-BCOM Status Not Approved Due Date Created Date 8/21/2023 Review Round 3.0-0031-2023-BCOM Status Approved Due Date Created Date 10/13/2023 Notes&Attachments Building_- CO City Use Tax -_FRR Notice to Contractor_20240819 332 W MAIN ST 101 -0031-2023-BCOM_CO_final Type File Type File Last Modified Emily Page 000 3/10-3/14,Chatter Sydney Fallon Last Modified Emily Page 000 3/10-3/14,Chatter Sydney Fallon Description Description Download Download Building_- CO City Use Tax -_FRR_Notice_to_Contractor_20240819.docx Building_- CO City Use Tax -_Final Return Reconciliation_20240815.pdf Type File Type File Last Modified Emily Page 000 3/10-3/14,Chatter Sydney Fallon Last Modified Emily Page 000 3/10-3/14,Chatter Sydney Fallon Description Description Download Download Building_- CO City Use Tax -_FRR_Notice_to_Contractor_20240815.docx Building__IBC_Certificate_of_Occupancy_20240815.docx Type File Type File Last Modified Emily Page 000 3/10-3/14,Chatter Sydney Fallon Last Modified Emily Page 000 3/10-3/14,Chatter Sydney Fallon Description Description Download Download UCP-FINAL-NO FEES-332 W MAIN ST 101 332 W.Main St.#101 Final Packet Type File Type File Last Modified Cole Langford Last Modified Steve Wilson Description Description Download Download 2023 Utilities Development Review Fee Invoice-0031-2023-BCOM-332 W Main Building_-_Permit_Issuance_20231101.pdf St 101 Type File Type File Last Modified Martyna Wojtkowska Last Modified Megan Killer Description Description Download https://cityofaspen.my.salesforce.com/a038X00002AHeiuQAD/p 13/21 3/14/25,2:58 PM 0031-2023-BCOM—Salesforce-Enterprise Edition Download Building_-_Cover_Sheet_20230815.pdf Type File _BuildingCommentl_332 W.Main St.101_0031-2023-BCOM Last Modified Sam Irmen Type File Description Last Modified Sam Irmen Download Description Download Engineering-1-332 W Main St-0031-2023-BCOM Type File Parks 1-332 W Main St.101-0031-2023-BCOM Last Modified Kyla Smits Type File Description Last Modified Joseph Pewitt Download Description Download Signature-Sign Below-0056A000002HAeaQAG-5/11/2023 11:16 AM.png Type Attachment Permit Application 2023-05-11 17:16:59.pdf Last Modified MARK HARDEMAN Type File Description Last Modified MARK HARDEMAN View file Description Download Open Activities Applicant Responding Type Time in Applicant's Hands Status In Progress Assigned To Sydney Fallon Start Date 8/21/2023 Completed Date Comments Payments PY-022095 Related To 0031-2023-BCOM Amount $1,179.96 Created Date 7/31/2024 Payment Source R-0020627 Receipt-Amount Remaining R-0020627:$0 PY-018975 Related To 0031-2023-BCOM Amount $13,413.30 Created Date 10/31/2023 Payment Source R-0017639 Receipt-Amount Remaining R-0017639:$0 PY-017264 Related To 0031-2023-BCOM Amount $8,061.83 Created Date 6/12/2023 Payment Source R-0016145 Receipt-Amount Remaining R-0016145:$0 Related Permits 0012-2023-BIFF Type Building-IFFR Address 332 W MAIN ST 101 Work Type New Status Closed-Final Applicant MARK HARDEMAN Issue Date 6/28/2023 Last Activity Date 3/29/2024 0081-2023-UTWC Type Utility Water Connection Address 332 W MAIN ST 101 Work Type New Status Issued Applicant MARK HARDEMAN Issue Date 10/30/2023 Last Activity Date 0377-2024-CPRK Type Parking Reservation Address 332 W MAIN ST 101 Work Type New Status Closed-Final https://cityofaspen.my.salesforce.com/a038X00002AHeiuQAD/p 14/21 3/14/25,2:58 PM 0031-2023-BCOM—Salesforce-Enterprise Edition Applicant MATT JURMU Issue Date 6/14/2024 Last Activity Date 0120-2023-BCHO Type Change Order Address 332 W MAIN ST 101 Work Type New Status Issued Applicant MARK HARDEMAN Issue Date 1/26/2024 Last Activity Date 1/26/2024 0316-2023-ELEC Type Electrical Address 332 W MAIN ST 101 Work Type New Status Closed-Final Applicant IAN D BYMAN Issue Date 1/10/2024 Last Activity Date 7/18/2024 0009-2024-PLUM Type Plumbing Address 332 W MAIN ST 103 Work Type New Status Closed-Final Applicant Joseph McVicker Issue Date 2/5/2024 Last Activity Date 7/11/2024 0016-2024-BCHO Type Change Order Address 332 W MAIN ST 101 Work Type New Status Issued Applicant MARK HARDEMAN Issue Date 4/30/2024 Last Activity Date 4/30/2024 0186-2024-CPRK Type Parking Reservation Address 332 W MAIN ST 101 Work Type New Status Closed-Final Applicant MATT JURMU Issue Date 4/9/2024 Last Activity Date 24-0859 Type Parking Reservation Address 332 W MAIN ST 101 Work Type New Status Cancelled Applicant MATT JURMU Issue Date Last Activity Date Reviews REV-033096 Milestone Review Round 3.0-0031-2023-BCOM Status Approved Type Utilities Due Date Completed Date 10/30/2023 2:01 PM Owner Alias RGreg On Hold Created Date 10/23/2023 REV-032108 Milestone Review Round 2.0-0031-2023-BCOM Status Approved Type Building Due Date Completed Date 10/13/2023 3:44 PM Owner Alias Slrme https://cityofaspen.my.salesforce.com/a038X00002AHeiuQAD/p 15/21 3/14/25,2:58 PM 0031-2023-BCOM—Salesforce-Enterprise Edition On Hold Created Date 8/25/2023 REV-032109 Milestone Review Round 2.0-0031-2023-BCOM Status Approved Type HPC Due Date Completed Date 8/30/2023 1:40 PM Owner Alias ASimo On Hold Created Date 8/25/2023 REV-032110 Milestone Review Round 2.0-0031-2023-BCOM Status Approved Type Engineering Dev Due Date Completed Date 8/30/2023 1:22 PM Owner Alias KSmit On Hold Created Date 8/25/2023 REV-032111 Milestone Review Round 2.0-0031-2023-BCOM Status Closed-Re-Review Created Type Utilities Due Date Completed Date 9/7/2023 3:59 PM Owner Alias MFerg On Hold Created Date 8/25/2023 REV-030847 Milestone Review Round 1-0031-2023-BCOM Status Approved Type Zoning Due Date Completed Date 6/26/2023 1:38 PM Owner Alias LPrad On Hold Created Date 6/19/2023 REV-030848 Milestone Review Round 1-0031-2023-BCOM Status Closed-Re-Review Created Type Building Due Date Completed Date 8/16/2023 11:18 AM Owner Alias Slrme On Hold Created Date 6/19/2023 REV-030849 Milestone Review Round 1-0031-2023-BCOM Status Approved with Conditions Type Parks Due Date Completed Date 6/28/2023 3:20 PM Owner Alias jpew On Hold Created Date 6/19/2023 REV-030850 Milestone Review Round 1-0031-2023-BCOM Status Approved Type Sanitation Due Date Completed Date 8/17/2023 12:00 PM Owner Alias CStra On Hold Created Date 6/19/2023 REV-030851 https://cityofaspen.my.salesforce.com/a038X00002AHeiuQAD/p 16/21 3/14/25,2:58 PM 0031-2023-BCOM—Salesforce-Enterprise Edition Milestone Review Round 1-0031-2023-BCOM Status Closed-Re-Review Created Type HPC Due Date Completed Date 6/20/2023 5:16 PM Owner Alias ASimo On Hold Created Date 6/19/2023 REV-030852 Milestone Review Round 1-0031-2023-BCOM Status Closed-Re-Review Created Type Engineering Dev Due Date Completed Date 6/23/2023 2:22 PM Owner Alias KSmit On Hold Created Date 6/19/2023 REV-030853 Milestone Review Round 1-0031-2023-BCOM Status Approved Type Engineering Erosion&Sediment Due Date Completed Date 6/26/2023 12:16 PM Owner Alias Engineering Erosion&Sediment-Review On Hold Created Date 6/19/2023 REV-030854 Milestone Review Round 1-0031-2023-BCOM Status Closed-Re-Review Created Type Utilities Due Date Completed Date 6/21/2023 11:57 AM Owner Alias RGreg On Hold Created Date 6/19/2023 Submissions 10.Permit Application Packet.20230511.pdf Actions Submission Date 5/11/2023 11:14 AM Status Required Description 20.Development Order.20230511.pdf Actions Submission Date 5/11/2023 11:14 AM Status Required Description 20.No Neg Certificate.20230511.pdf Actions Submission Date 5/11/2023 11:14 AM Status Required Description 30.Asbestos Clearance Report.20230511.pdf Actions Submission Date 5/11/2023 11:14 AM Status Required Description 30.Interior Lighting ComCheck.20230511.pdf Actions Submission Date 5/11/2023 11:14 AM Status Required Description https://cityofaspen.my.salesforce.com/a038X00002AHeiuQAD/p 17/21 3/14/25,2:58 PM 0031-2023-BCOM—Salesforce-Enterprise Edition 50.Construction Mitigation PIan.20230511.pdf Actions Submission Date 5/11/2023 11:14 AM Status Required Description 90.Architectural Plans.20230511.pdf Actions Submission Date 5/11/2023 11:14 AM Status Required Description 90.Civil Grading Letter.20230511.pdf Actions Submission Date 5/11/2023 11:14 AM Status Required Description 90.Structural Letter of Integrity.20230511.pdf Actions Submission Date 5/11/2023 11:14 AM Status Required Description 10.Accessibility Improvements SoV.20230511.pdf Actions Submission Date 5/11/2023 11:14 AM Status Required Description 30.Building Round 1 Comment Response.20230823.pdf Actions Submission Date 8/23/2023 12:17 PM Status Required Description 30.Interior Lighting ComCheck Rnd1 Comment Response.20230823.PDF Actions Submission Date 8/23/2023 12:17 PM Status Required Description 40.Civil Grading Letter Rnd1 Comment Response.20230823.pdf Actions Submission Date 8/23/2023 12:17 PM Status Required Description 40.Engineering Round 1 Comment Response.20230823.pdf Actions Submission Date 8/23/2023 12:17 PM Status Required Description 50.Commercial ECU Calculator.20230823.xlsx Actions Submission Date 8/23/2023 12:17 PM Status Required Description 90.Architectural Plans.20230823.pdf Actions Submission Date 8/23/2023 12:17 PM https://cityofaspen.my.salesforce.com/a038X00002AHeiuQAD/p 18/21 3/14/25,2:58 PM 0031-2023-BCOM—Salesforce-Enterprise Edition Status Required Description 90.Civil Grading and Drainage Plan Rnd1 Comment Response.20230823.pdf Actions Submission Date 8/23/2023 12:17 PM Status Required Description 30.Fire Marshall Sprinkler Requirments.20230907.pdf Actions Submission Date 9/7/2023 3:24 PM Status Required Description 30.Project Overall Budget.20230912.pdf Actions Submission Date 9/12/2023 10:09 AM Status Required Description 30.Project Accessibility Budget.20230912.pdf Actions Submission Date 9/12/2023 10:09 AM Status Required Description 10.UPC Packet_Notarized.20231004.pdf Actions Submission Date 10/4/2023 4:06 PM Status Required Description 30.Interior Lighting ComCheck.20231010.pdf Actions Submission Date 10/10/2023 8:00 PM Status Required Description 90.Architectural Plans Round 2 Comment Response.20231010.pdf Actions Submission Date 10/10/2023 8:00 PM Status Required Description 90.Drawing Change Log Round 2 Comment Response.pdf Actions Submission Date 10/10/2023 8:00 PM Status Required Description 2023-10-12_332 W Main_Accessibility Revisions.pdf Actions Submission Date 10/13/2023 8:34 AM Status Required Description 332 W Main-Utliites Packet Signed 7.24.2024.pdf Actions Submission Date 7/25/2024 2:24 PM Status Required Description https://cityofaspen.my.salesforce.com/a038X00002AHeiuQAD/p 19/21 3/14/25,2:58 PM 0031-2023-BCOM—Salesforce-Enterprise Edition 332 Main-SOV Actual 8.2.2024.pdf Actions Submission Date 8/7/2024 7:36 AM Status Required Description Permit History 3/14/2025 2:54 PM User Fernando Cruz Action Changed Owner from Sydney Fallon to Fernando Cruz. 8/19/2024 3:46 PM User Emily Page 000 3/10-3/14,Chatter Sydney Fallon Action Changed Status from Ready for Closure to Closed-Final. 8/5/2024 10:32 AM User Steve Feder Action Changed Expiration Date from 1/29/2025 to 2/1/2025. 8/5/2024 10:32 AM User Steve Feder Action Changed Status from Final Inspections to Ready for Closure. 8/2/2024 6:13 AM User Steve Feder Action Changed Expiration Date from 1/27/2025 to 1/29/2025. 7/31/2024 2:07 PM User Cole Langford Action Changed Status from Issued to Final Inspections. 7/31/2024 2:07 PM User Cole Langford Action Changed Expiration Date from 1/5/2025 to 1/27/2025. 7/31/2024 1:22 PM User Martyna Wojtkowska Action Changed Total Payments from$21,475.13 to$22,655.09. 7/9/2024 11:06 AM User Stuart Hayden Action Changed Expiration Date from 1/4/2025 to 1/5/2025. 7/8/2024 11:51 AM User Aaron Reed Action Changed Expiration Date from 12/29/2024 to 1/4/2025. 7/3/2024 3:17 PM User Megan Killer Action Changed Total Fees from$21,475.13 to$22,655.09. 7/2/2024 9:38 AM User Joseph Pewitt Action Changed Expiration Date from 12/24/2024 to 12/29/2024. 6/27/2024 2:08 PM User Chip Strait Action Changed Expiration Date from 12/23/2024 to 12/24/2024. 6/26/2024 8:03 AM User Bob Narracci Action Changed Expiration Date from 12/18/2024 to 12/23/2024. 6/21/2024 8:48 AM User Bob Narracci Action Changed Expiration Date from 12/17/2024 to 12/18/2024. 6/20/2024 8:45 AM User Joseph Pewitt Action Changed Expiration Date from 12/16/2024 to 12/17/2024. 6/19/2024 6:19 PM User MATT JURMU https://cityofaspen.my.salesforce.com/a038X00002AHeiuQAD/p 20/21 3/14/25,2:58 PM 0031-2023-BCOM—Salesforce-Enterprise Edition Action Changed Expiration Date from 10/1/2024 to 12/16/2024. 4/4/2024 6:10 AM User Ric Bennett Action Changed Expiration Date from 9/30/2024 to 10/1/2024. 4/3/2024 7:14 AM User Ric Bennett Action Changed Expiration Date from 9/28/2024 to 9/30/2024. 4/1/2024 6:07 AM User Steve Feder Action Changed Expiration Date from 9/25/2024 to 9/28/2024. 3/29/2024 10:33 AM User MATT JURMU Action Changed Expiration Date from 9/24/2024 to 9/25/2024. 3/28/2024 1:40 PM User Jan Legersky Action Changed Expiration Date from 9/23/2024 to 9/24/2024. 3/27/2024 7:26 AM User Ric Bennett Action Changed Expiration Date from 9/22/2024 to 9/23/2024. 3/26/2024 4:20 PM User MATT JURMU Action Changed Expiration Date from 9/2/2024 to 9/22/2024. 3/6/2024 7:17 AM User Steve Feder Action Changed Expiration Date from 9/1/2024 to 9/2/2024. 3/5/2024 4:03 PM User MATT JURMU Action Changed Expiration Date from 5/15/2024 to 9/1/2024. 11/17/2023 7:45 AM User Ben Smith Action Changed Expiration Date to 5/15/2024. 11/1/2023 11:55 AM User Martyna Wojtkowska Action Changed Issue Date to 11/1/2023.Changed Status from Ready for Issue to Issued. 10/31/2023 1:24 PM User Emily Page 000 3/10-3/14,Chatter Sydney Fallon Action Changed Total Payments from$8,061.83 to$21,475.13. 10/31/2023 8:10 AM User Martyna Wojtkowska Action Changed Status from Final Review Complete to Ready for Issue. 10/30/2023 4:52 PM User Denis Murray Action Changed Status from Final Review to Final Review Complete. 10/30/2023 3:12 PM User Sydney Fallon Action Changed Status from Permit Review to Final Review. Copyright©2000-2025 salesforce.com,inc.All rights reserved. https://cityofaspen.my.salesforce.com/a038X00002AHeiuQAD/p 21/21