HomeMy WebLinkAboutFile Documents.931 Gibson Ave.0037-2019-BRES 0037-2019-BRES_931 Gibson_BuildingCommentl
191001 Gibson IMC Ventilation Calc.pdf(2)
ew�w Subject: PlanCheck The required ventilation rate for
° _ °., ; ;�,:. Page: 1
Author:justinh.:- a residence or dwelling unit
Color: • should be calculated in
° File Name: 191001 Gibson IMC Ventilation Calc.pdf accordance with IMC 403.3.2.1
s_.._........___.:_...., equation 4-9 rather than table
403.3.1.1 (this is what the COA
. :': ,..g: :m- ventilation calculator
_,- :-°.--.: See responses in 191220 Gibson mech response spreadsheet that you submitted
for COA.pdf
uses). The rates outlined here
--�- °-
are more than what is actually
required by IMC 403.3.2.1.
Please revise this letter to
reference the correct calculation
and decide what option you are
actually proposing. We won't
approve a series of options, a
decision should be made.
Subject: PlanCheck
Page: 2 How will the system be turned
m�,. o. Author:justinh on/off during
Color: • occupied/unoccupied periods?
:;`,. °r File Name: 191001 Gibson IMC Ventilation Calc.pdf Will this be a manual control or
w„,_ automatic? Please clarify.
°•F "`® See responses in 191220 Gibson mech response
for COA.pdf
931 Gibson -Architectrual Plans.pdf(22)
Subject: PlanCheck
Page:4 Snowmelt in the R.O.W. must be
Author:justinh zoned separately, note this
Color: • requirement on the REMP plan.
1 File Name: 931 Gibson-Architectrual Plans.pdf Provide a detail for your
snowmelt assembly that shows
,;,e.„ ,,,'`-.. ,--77,AiiiiC. , ligriaLj See updated sheet A1.3 REMP PLAN, detail F5 a minimum R 10 insulation
4 -ram underneath.
AO.' � � on A6.1, and updated REMP CALC.pdf
k:Illllliiii— l Iriiegoi Ii.��
rr.;i 1/ � �'.— _'di
_ Subject: PlanCheck
Page:A2.2 MAIN LEVEL PLAN Provide details for this stair
staFir:::::::*
OW OM.. °° Author:justinh similar to what you provided for
dm�"" Color: • the stair in the addition.
[rri ' Iib File Name: 931 Gibson-Architectrual Plans.pdf
c See new sheet A5.19 HISTORIC STAIR
= DETAILS
RECEIVED
01/22/2020
ASPEN
BUILDING DEPARTMENT
r Subject: PlanCheck
If this firepit is a gas appliance
� � `I', Page:A2.2 MAIN LEVEL PLAN
Author:justinh submit a spec for it
' _ Color: • demonstrating it is listed for
File Name: 931 Gibson-Architectrual Plans.pdf outdoor use.
tlils nreplaga=
ance re,, A a This spec was initially submitted on page 8 of our Fireplace
lt
P.b r
dP.on for at 015 d Registration and Cut Sheets20200110.pdf document.Sorry
listed ror outdoor use.
for not making this clear.It is now called out as FP.03 on
page 8.
Subject: PlanCheck
Page:A2.2 MAIN LEVEL PLAN Please indicate where these
Author:justinh garage drains will be routed to.
Color: • They must either drain to
„,.m File Name: 931 Gibson-Architectrual Plans.pdf daylight,to a drywell not
associated with civil drainage
Note updated on sheet A2.2 components, or to the sanitary
sewer system.
j Subject: PlanCheck
Page:A2.2 MAIN LEVEL PLAN Show electrical panel location on
Author:justinh the floor plan.
Color: •
Show electrical panel location on the File Name: 931 Gibson-Architectrual Plans.pdf
floor plan.
Electrical panels now shown on sheet A2.1 in
LAUNDRY 005.
""°— v, Subject: PlanCheck
ry�
Page:A2.4 ROOF PLAN Where roof drains are provided
Where roof drams are provided secondary secondary emergency overflow
emergency overflow drains or scuppers are ' Author:justinh
also required per IRC 903.4.1.IPC 1108.2 drains or scuppers are also
requires that secondary roof drains haves Color:olor. •
separate discharge point to a conspicuous
Iecatenso that the buildingoccre not vnll , File Name: 931 Gibson-Architectrual Plans.pdf required per IRC 903.4.1. IPC
realize so the primary tlng o are not
functonal.If you plan to provide secondary 1108.2 requires that secondary
drains rather than scuppers also idertrfy the
secondary dischargelocatover
he If water of the roof drains have a separate
beadekand low that edge
wthin 2"of the s^
roof deck and that edge is at co 2"complies
the
drain inlet alnd no
orvien that compliasas discharge point to a conspicuous
a scupper and ro revisions or Garificatans
are needed. See scupper locations on sheets A2.4,A3.1,A3.3 and location so that the building
A5.2 occupant will realize that the
primary drains are not functional.
If you plan to provide secondary
drains rather than scuppers also
identify the secondary discharge
location. If water will be able to
flow freely over the edge of the
roof deck and that edge is within
2"of the drain inlet elevation
then that complies as a scupper
and no revisions or clarifications
are needed.
7 lit, Subject: PlanCheck
Ire Page:A2.4 ROOF PLAN Snow stops are required in all
�p areas where snow can slide onto
k Author:justinh
�; f Colorpotentially occupied areas
: •
-- — File Name- 931 Gibson-Architectrual Plans.pdf (patios,walkways,window wells,
�I etc.), parking areas or where
Iv there is the potential to damage
�I . ® property such as utllFty tne eri. ls�1\ i �= Ea f';
Snow stops added.Additional meeting with HPC staff per city policy. Please revise
and monitor required. 01 2 2 2 0 2 0
ASPEN
BUILDING DEPARTMENT
Cur,a 3 of =1 Subject: PlanCheck
alu'_ °' Page:A2.4 ROOF PLAN IRC 905.8.2 requires a roof
_ i_? slope of at least 3:12 for wood
Bi Author:justinh
kishake installation, 2:12 is not
!_.-._ �; Color: •
_ = __ steep enough for cedar shakes.
°� File Name: 931 Gibson-Architectrual Plans.pdf
IRC 9o5.a2 requires a roof Nmtrvt' 1111101
5o hakeast3:12 for
Pe o
•atl shake iretallaGan, ? _•
cedasha e�e,e°°ghfo NEW MEMBRANE ROOF.SEE DETAIL HR3 ON SHEET A6.1.
cedar shakes. -���_-���
'_- '- _' ALSO REFERENCE CHANGES ON A2.4,A3.4,AND A5.12.
MINA
,/ Subject: PlanCheck
Page:A2.7 UPPER LEVEL RCP CO detectors are required in
Author:justinh sleeping rooms with gas
Color: • appliances, please revise to
File Name: 931 Gibson-Architectrual Plans.pdf show a CO detector withing the
guest suite in addition to the one
located outside the suite.
CO dector added,See sheet A2.7 UPPER LEVEL RCP
// Subject: PlanCheck
Page:A3.1 NORTH EXTERIOR ELEVATION Glass in guards and guardrails is
Author:justinh required to be two plies of equal
MiteColor: ■ thickness laminated glass,
File Name: 931 Gibson Architectrual Plans.pdf tempered glass is only permitted
where not above a walking
surface and when a top rail that
Note revised to specify laminated glass,See is either self-supported or is
A3.1-A4.2,all exterior elevations and first 2 supported by a minimum of three
sheets of building sections. panes of glass(amended IRC
308.7). This guard is above
patio on one side and does not
appear to meet the top rail
requirement. Revise your note
to specify laminated glass or
show how you meet the
requirement for a tempered
guard.
Subject: PlanCheck Several windows require window
Page:A3.1 NORTH EXTERIOR ELEVATION
remd % Author:justinh fall protection per IRC 312.2,
e" p° Color: • note this requirement for the
File Name: 931 Gibson-Architectrual Plans.pdf applicable windows on the
window schedule.
WINDOWS W-05,06,07 REQUIRE FALL PROTECTION
SEE WINDOW SCHEDULE A10.1
Subject: PlanCheck What is WX in reference to?
Page:A5.3 WALL SECTIONS/DETAILS
What is WX in Author:justinh
reference to? Color: •
File Name: 931 Gibson-Architectrual Plans.pdf
Brick screen wall types have been eliminated since
those wall types do not contain any R-values.
RECEIVED
01/22/2020
ASPEN
BUILDING DEPARTMENT
V Subject: PlanCheck
Page:A5.6 WALL SECTIONS/DETAILS Dimension riser height and tread
Author:justinh depth for the exterior steps on
Oar BOX Color: •
the roof deck.
WOCO
NIADIJO File Name: 931 Gibson-Architectrual Plans.pdf
e""n�ed daP�n
exte"ar steps an,"rtM1e Ue —
root deck. !
®111=1I Dimensions have been added to A5.6
Subject: PlanCheck
Page:A5.8 WALL SECTIONS/DETAILS Call out the components for the
Author:justinh green roof assembly.
Color: ■
Call out the ' File Name: 931 Gibson-Architectrual Plans.pdf
components for the
green roof assembly.
Detail from american hydrotech now provided.
Assembly updated accordingly on A5.8
\�3/Subject: PlanCheck
�.. Page: A5.15 AIR SEALING DETAILS Are you proposing to implement
°"""'"*"'"*"*"'''"'" Author:justinh all these air sealing techniques?
�YYI�YYYYYY'�'YY'Hthese Y' You do not need to do all four
Are you proposing to implement all these Color: ■
air sealing techniques?You do not need to methods, but you certainly can.
4D do all four methods,but you certainly can. File Name: 931 Gibson-Architectrual Plans.pdf
Please only include the methods you Please only include the methods
intend to be inspected to. No action
needed unless you want to remove one or you intend to be inspected to.
more of these four air sealing methods.
Housewrap historic walls.Spray foam historic roof and No action needed unless you
new construction.Revised sheet A5.15. want to remove one or more of
01. these four air sealing methods.
XSubject: PlanCheck
Page: A6.1 ROOF AND FLOOR ASSEMBLIES Provide documentation for all
Author:justinh new roof assemblies that do not
, Color: ■ meet an exception to the
File Name: 931 Gibson-Architectrual Plans.pdf amended IRC 902.1 in order
\ show they achieve a class A roof
covering classification (ESR
See missing documentation on sheet A6.1 report, UL listing,etc). This
specific assembly listing is for
non-combustible decks(NC)and
/ is not applicable to your roofs.
Subject: PlanCheck COA amendments to IRC
Page: A6.1 ROOF AND FLOOR ASSEMBLIES
Author:justinh 905.7.8 and 905.8.10 require a
Color: ■ 1/4"vented airspace separating
::_- —� w.ti 4` O wood shingles or shakes from
File Name: 931 Gibson-Architectrual Plans.pdf the roofing underlayment(cedar
® / breathers). Revise the roof
o 1/4"airspace provided by using 1/4"lath @ each assemblies to comply.
L. /J ; nailing.See revised details on A6.1
.... t
wise l td Vilhh NW
RECEIVED
01/22/2020
ASPEN
BUILDING DEPARTMENT
V Subject: PlanCheck Page:A6.2 WALL ASSEMBLIES Please revise these to be R
Author:justinh 21+5 for all applicable details,
Color: • similar to what you have on the
File Name: 931 Gibson-Architectrual Plans.pdf W9 detail,this would imply that
you have R 5 cavity insulation
Revision made on sheet A6.2 with R 21 continuous.
J Subject: PlanCheck
Page:A10.1 WINDOW SCHEDULE Identify all windows and doors
Author:justinh that require safety glazing as
Color: • such on your schedules.
Identify all windows and doors that require File Name: 931 Gibson-Architectrual Plans.pdf
safety glazing as sut on your schedules.
See updated window schedule A10.1
CO
Subject: PlanCheck
Page:A10.1 WINDOW SCHEDULE Provide a spec on the proposed
Author:justinh skylights or note the type of
Color: • glazing material to be used in
File Name: 931 Gibson-Architectrual Plans.pdf the schedule to show
qo; compliance with skylight
CUSTOM RIDGE SKYLIGHT MANUFACTURED BY AIA materials per IRC 308.6.2.
INDUSTRIES.GLAZING ASSUMED TO BE 1 5/16"CLEAR
SOLARBAN R100 LOW-E GLASS TO COMPLY WITH IRC
308.6.2.APPROVED SHOP DRAWINGS REQUIRED
BEFORE MANUFACTURING.
Subject: PlanCheck Page:A10.1 WINDOW SCHEDULE Are you actually proposing to
Author:justinh replace the existing historic
Color: • windows with units that have a
File Name: 931 Gibson-Architectrual Plans.pdf U value of.28 or better as the
schedule implies, or will these
existing historic windows remain.
Yes we are planning on replacing existing If you are proposing to keep the
- historic windows with new units that have a U historic windows please request
value of.28 or better. exemption from energy code
requirements per IECC R501.6
Yes to 2 side historic doors as these will be in your letter to the chief building
official. If that is the case you
newly manufactured replicas. can just put N/A for the U value
of the historic windows.
Front door will be reused and need a written
request to be exempt.U value will be N/A. This comment also applies to the
historic exterior doors on the
door schedule shown as being
.28. We can exempt you with
the written request because of
the historic nature of these
elements, but the schedules
should be accurate as to what
will actually be supplied.
RECEIVED
01/22/2020
ASPEN
BUILDING DEPARTMENT
ubject: PlanCheck
age: COVER SHEET Provide a copy of the approved
,, r Author:justinh state demo license for the
Provide a copy of the approved stale' Color: •
Edemolition of the existing
demo license for the demolition of ) structure. You may submit all
the existing structure. You may ) File Name: 931 Gibson-Architectrual Plans.pdf
submit all other responses without other responses without this if
this if needed,but we cannot fully
approve or issue your permit until it needed, but we cannot fully
Chasbeensubmined. See new document,PENDING STATE DEMO LICENSE approve or issue your permit
APPROVAL until it has been submitted.
931 Gibson - Structural Plans.pdf(4)
Subject: PlanCheck Our ground snow load is 100 psf
Page: S.6.001 General Notes and Details
Author:justinh per our current adoption.
3ENERAL NOTES&SPECIFIC, Color: ■
Our ground snow load is 100 File Name: 931 Gibson-Structural Plans.pdf
psf per our current adoption.
C
91 PSF 4.Garage 40 PSF see S.6.001
40 PSF 5.Wind 115 mph,Exposure C
40 PSF 6.Seismic Zone C
xle,(IRC),2015
ding Code,(IBC),2015 for Special Inspection
t Building Code(ACI 318-11)
2onstruchon.Manual of Steel Construction(AISC gth Edition)
s dr srt�.Irl�.HI lulus // Subject: PlanCheck
Provide a special inspection
Page: S.6.001 General Notes and Details program as required by chapter
cONcl Author:justinh 17 of the IBC.
40 PSF A. Color: •
115 mph,Exposure C Con
Zone Provide a special inspection 311 File Name: 931 Gibson-Structural Plans.pdf
program as required by 1 cor
,epaction �chapter 17 of the IBC. walls t
ruction(AISC 9th Edition)
2 Manual(AFC 5th Edition) 2,pro
3.Mesee S.6.003
rtructural engineer for approval. 4.No
n ninar rno .r.uo,.u,.i n.wrr„n n^n nnv nicrmr.onHun 5.Ad(
.av;M.NrNm.....1.^•.. R........p Si Subject: PlanCheck
°GENERAL
REQUIREMENTS^ Page: S.6.001 General Notes and Details Provide specifications for
_�,,•ra �.�.•,•,� •.RNw•, •.• •�,��•.R.C.. structural steel, your plan
.� a— ... . �. Author:justinh
"a Sail."N°o n.a'"..:°:n n Color: • includes steel structure but the
ProvIde speacatIons tor structuralste l,ro n File Name: 931 Gibson-Structural Plans.pdf general notes make no
Includes steel structure but the general notes make+ reference to steel.
coratere ce,tpsteel.
see S.6.001
li Subject: PlanCheck Wind speed should be 89 mph,
Page: S.6.001 General Notes and Details
Author:justinh exposure B per our current code
PECIFICATIONS Color: • adoption.
Wind speed should be 89 mph,exposure File Name: 931 Gibson-Structural Plans.pdf
/—
B per our current code adoption.
CONCRETE.
CCONCREIE REQUIREMENTS
,,xpmunC �e^BUItlIM6Cotl,
Walls.! see S.6.001
,Cah&Non) CNN• rwR•rr.� ran
RECEIVED
01/22/2020
ASPEN
BUILDING DEPARTMENT
HPC FOUNDATION DETAILS 20190823.pdf(1)
i/Subject: PlanCheck
Page: 1 Please include these HPC
Author:justinh foundation details in your plan
- Color: • set rather than as a separate
Please include e these HPC) document.
foundation details in your File Name: HPC FOUNDATION DETAILS 20190823.pdf
plan set rather than as a
separate document.
_�_x_.x_x_x_.x_� Included HPC foundation detail D6 on Sheet A5.10
Line Grade Verification Form and Exhibit.pdf(2)
Subject: PlanCheck
V Page: 1 I'm not finding this elevation
m '"r""""=�"_,._„ Author:justinh benchmark on the survey,
TM`T me-�T -_n_ Color: • please clarify or have the survey
Ie,. File Name: Line Grade Verification Form and Exhibit.pdf revised to provide it.
y1e1�SNIMINia Survey revised.See South East property corner
. ,_ --.. benchmark on revised survey SHEET SUR.
Subject: PlanCheck
' ' ' t ' Page: 2 Please add these dimensions to
I w- . 1 g a sheet in the plan set.
' .,'1 ,, Author:justinh
-
, Color: •
� �® '' File Name: Line Grade Verification Form and Exhibit.pdf
7 q -�
n❑ moo, _.
See new sheet A0.6
Special Inspection and Testing Agreement.pdf(1)
____ =Y Subject: PlanCheck You are missing a fabricator's
_`__ Page: 3
— Author:justinh signature on the agreement
(inspected fabricator would be
..,._.. Color: •
-- - File Name: Special Inspection and Testing Agreement.pdf for field welds or shop welds not
-- - - lingt done at an approved fabricator's
m_,... shop, approved fabricator only
NOW INCLUDED IN applies to shop welds done by
SPECIAL INSPECTION AND TESTING an approved fabricator-you
AGREEMENT20200110.PDF could potentially need both).
You may submit all other
responses without this but we
cannot fully approve or issue this
permit until all relevant
signatures have been supplied.
RECEIVED
01/22/2020
ASPEN
BUILDING DEPARTMENT