Loading...
HomeMy WebLinkAboutFile Documents.277 McSkimming Rd.0057-2022-BCHO 277 McSkimming Change Order 8.25.22 This change order includes the following adjustments: 1. The footprint of the new subgrade gym has been altered to follow an existing foundation wall that supports a site wall, instead of being squared off and stepped…. It will follow the angle of the wall. 2. This foundation wall will now be used as the exterior side of the form for the new foundation for the gym. The new structural drawings show this. 3. The new footprint adds some square feet to the basement, so there are updated FAR calcs. 4. There will be some gardens planted around the new skylight and a tree planted at the end of the new gym area at the corner of the master closet…. See the site plan 5. A skylight has been added to the new gym as shown on both floor plans and in a section. 08/26/2022