HomeMy WebLinkAboutFile Documents.277 McSkimming Rd.0057-2022-BCHO
277 McSkimming
Change Order
8.25.22
This change order includes the following adjustments:
1. The footprint of the new subgrade gym has been altered to follow an existing
foundation
wall that supports a site wall, instead of being squared off and stepped…. It will
follow the angle of the wall.
2. This foundation wall will now be used as the exterior side of the form for the new
foundation for the gym. The new structural drawings show this.
3. The new footprint adds some square feet to the basement, so there are updated
FAR calcs.
4. There will be some gardens planted around the new skylight and a tree planted
at the end of
the new gym area at the corner of the master closet…. See the site plan
5. A skylight has been added to the new gym as shown on both floor plans and in a
section.
08/26/2022