HomeMy WebLinkAboutFile Documents.105 W Hyman Ave.0083-2023-BCHO (6) From: BOD Builder of the Day builderoftheday@gmail.com Subject: Re:Reuse existing door in remodel Date: July 21,2023 at 1:02 PM To: Brad Elliott brad@bearchitect.com Hi Brad, Yes,we are fine with re-installing the old door with a U value of.31. Sam had discussed that with the CBO previously and you're all set to propose that in your change order. Thanks, Justin Hahn Builder of the Day 970-429-2735 City of Aspen Building Department 427 Rio Grande PI. Aspen,CO 81611 On Fri,Jul 21,2023 at 9:09AM Brad Elliott<brad@bearchitect.com>wrote: Justin, Sorry for the confusion.The last door that is shown and has the u-value of.31 is for the existing door we want to relocate. I didn't include ny information for the new door because it will meet the requirements of the permit. Please feel free to call or email with any questions. Thank You, Brad Elliott Brad Elliott Architect, Inc. 970-927-7620 PO Box 4432 Basalt, CO 81621 brad@bearchitect.com www.BEArchitect.com On Jul 21,2023,at 9:03 AM, BOD Builder of the Day<builderoftheday@gmail.com>wrote: Hi Brad, I don't see where any U value is listed for the door you have marked to be moved to window opening,only the last door shows a U value(it shows a U value of.31,but you have marked it will be.28). Can you get anything from Pella that gives a U value for door you'd like to re-use? Thanks, Justin Hahn Builder of the Day 970-429-2735 City of Aspen Building Department 427 Rio Grande PI. Aspen,CO 81611 On Fri,Jul 21,2023 at 8:21 AM Brad Elliott<brad@bearchitect.com>wrote: I had the below conversation with Sam Irmen about re-using a sliding glass door for the 105 W Hyman project Permit 105 W Hyman Ave-0108-2022-BRES.After getting delayed with electrical issues we are back on track and I would lik Change Order for some minor changes we are making. Part of this included re-using a sliding glass door that rilt R�V�' the house instead of buying a new one. 08/24/2023 ASPEN BUILDING DEPARTMENT Since that string of emails I have received and attached an updated document from Pella showing the U-Factor of the existing door since they are still manufacturing and selling it in other areas. I would like to confirm that we can still re-use this door before submitting the change order. Please feel free to call or email with any questions. Thank You, Brad Elliott Brad Elliott Architect, Inc. 970-927-7620 PO Box 4432 Basalt, CO 81621 brad@bearchitect.com www.BEArchitect.com On Apr 19,2023,at 12:10 PM,BOD Builder of the Day<builderoftheday@gmail.com>wrote: Thank you for sending this over, Brad. I will run it by Bonnie to see what she says. I didn't see a U-factor for the door on the cutsheet,but after having talked to Bonnie about this yesterday, I think you should be ok.When you get the door out,if there is a NFRC sticker with the U-factor,we would like to see what that says,but I will confirm with her after sending this over to her to take a look. I will be in touch as soon as I hear back from her. Thanks, Sam Builder of the Day 970-429-2735 City of Aspen Building Department 427 Rio Grande PI. Aspen,CO 81611 On Wed,Apr 19,2023 at 11:59AM Brad Elliott<brad@bearchitect.com>wrote: Sam, I was actually able to get the Pella window proposal for the job. I have attached the cut sheets for the window being removed and the door we want to move into the opening. Please feel free to call or email with any questions. Thank You, Brad Elliott Brad Elliott Architect, Inc. 970-927-7620 PO Box 4432 Basalt, CO 81621 brad@bearchitect.com www.BEArchitect.com On Apr 14,2023,at 4:20 PM, Brad Elliott<brad@bearchitect.com>wrote: Sam, Thank you for your clear response.The door is actually narrower than the window but I expect to be creating a change order for this and a couple of small adjustments we are looking to do to the interior plans. The address is 105 W. Hyman and I believe the permit would have been issued in 2010. Please feel free to call or email with any questions.Thank You, RECEIVED Brad Elliott 08/24/2023 ASPEN BUILDING DEPARTMENT Brad Elliott Architect, Inc. 970-927-7620 PO Box 4432 Basalt, CO 81621 brad@bearchitect.com www.BEArchitect.com On Apr 14,2023,at 3:01 PM, BOD Builder of the Day<builderoftheday@gmail.com>wrote: Good afternoon Brad, Thank you for the inquiry.We need a little clarification before we can answer this fully. First off,it is more than likely that the door you would like to reuse is larger(width)that the window it is replacing.Therefore, it is likely that we would require updated structurals for the new opening that will house this sliding door.Along with that,we will need to see the landing both inside and out to make sure it is compliant. If this door was installed around 2010,there is a chance we have information in the address file from that permit.While I cannot say for sure whether we will allow this to be reused in a different location,in the past,we have allowed for doors/windows that are close to compliant and in good repair,to be reused in remodel projects. If you can tell me what the address is and if possible the old permit number, I would be happy to dig in to our records to see if we have any information on the existing door.After that, I can take this to our CBO(I spoke with Bonnie about this today,and she is who told me that it is possible to reuse), and see what her determination would be.Thank you and please let me know if you have any further questions. Have a great weekend! Best, Sam Irmen Builder of the Day 970-429-2735 City of Aspen Building Department 427 Rio Grande PI. Aspen,CO 81611 On Fri,Apr 14,2023 at 2:03 PM Brad Elliott<brad@bearchitect.com>wrote: I have a project that we have the permit for but the owner is now wanting to replace an existing window with the sliding door that we will be removing.Can I slide this existing unit over to replace the adjacent window or will it need to be a brand new unit?The door is from 2010 so would be better than.35 u value. Please feel free to call or email with any questions. Thank You, Brad Elliott Brad Elliott Architect, Inc. 970-927-7620 PO Box 4432 Basalt, CO 81621 brad@bearchitect.com www.BEArchitect.com RECEIVED 08/24/2023 ASPEN BUILDING DEPARTMENT RECEIVED 08/24/2023 ASPEN BUILDING DEPARTMENT