Loading...
HomeMy WebLinkAboutFile Documents.931 Gibson Ave.0091-2022-BCHO (3) F & M ARCHITECTS 931 Gibson - Change Order 1 PROJECT: 931 GIBSON AVE,ASPEN CO 81611 PPERMIT NUMBER: 0036-2019-BRES - 0091-2022-BCHO DATE: Friday,April 21, 2023 To City of Aspen: The following is a list of changes and responses to the Mechanical plans for change order 0091- 2022-BCHO. M 1.1 1. Added EDH-6& MD-2 for MUA system. 2. Changed OSA louver size 3. Added ductwork for dryer MUA system 4. Moved location of EDH-3 and MD-1. Increased size of EDH-3 5. Reworked ductwork above steam and sauna M 1.2 1. Reworked ductwork in garage 2. Changed vent layout for boiler on patio counter wall 3. Detailed HP-1 layout and pad size M 1.3 1. Changed ductwork layout above guest suite 2. Changed ductwork layout above master bath and closet M 1.7 1. Changed zone names and size of snowmelt to coordinate with Architecturals. End of Document By: Patrick Westfeldt, Project Architect F&M Architects LLC Project:931 Gibson Project No.:21040 RECEIVED Initial F & M ARCHITECTS 05/08/2023 Enduring Architecture. Lasting Relationships 1 o 1 ASPEN BUILDING DEPARTMENT