HomeMy WebLinkAboutFile Documents.931 Gibson Ave.0091-2022-BCHO (3) F & M ARCHITECTS
931 Gibson - Change Order 1
PROJECT: 931 GIBSON AVE,ASPEN CO 81611
PPERMIT NUMBER: 0036-2019-BRES - 0091-2022-BCHO
DATE: Friday,April 21, 2023
To City of Aspen:
The following is a list of changes and responses to the Mechanical plans for change order 0091-
2022-BCHO.
M 1.1
1. Added EDH-6& MD-2 for MUA system.
2. Changed OSA louver size
3. Added ductwork for dryer MUA system
4. Moved location of EDH-3 and MD-1. Increased size of EDH-3
5. Reworked ductwork above steam and sauna
M 1.2
1. Reworked ductwork in garage
2. Changed vent layout for boiler on patio counter wall
3. Detailed HP-1 layout and pad size
M 1.3
1. Changed ductwork layout above guest suite
2. Changed ductwork layout above master bath and closet
M 1.7
1. Changed zone names and size of snowmelt to coordinate with Architecturals.
End of Document
By: Patrick Westfeldt, Project Architect
F&M Architects LLC
Project:931 Gibson
Project No.:21040
RECEIVED
Initial F & M ARCHITECTS 05/08/2023
Enduring Architecture. Lasting Relationships 1 o 1
ASPEN
BUILDING DEPARTMENT