HomeMy WebLinkAboutFile Documents.933 E Hyman Ave.0128-2021-BRES (5) Zoning Comments 1 - 933 E Hyman Ave - 0128-2021 -BRES
80.survey.20211001.pdf(1)
Page: 1 complete,please ref attached revis�y�lease include the gross lot area on the survey as
Page Index: 1 landscape plans
„asa,so o,�, Author: sophiev well as the combined side yard setbacks.The
rardma. File Name: 80.survey.20211001.pdf survey shows the side yard setbacks at 5'on either
side.
90.landscape arch.20211001.pdf(1)
Page: 1
"" Page Index: 1 complete,please ref attached revise his parcel is subject to combined side yard
a V"" w Author: sophiev landscape plans setback requirements. Please update the site plan
--' File Name: 90.landscape arch.20211001.pdf to accurately reflect the side yard setbacks.
This may result in the spa being in the setback. If
that is the case, please update the spa plan so that
it meets the language in 26.575.020(e)(5)(m)(4):
"If located within a setback not adjacent to a street,
these features shall not exceed thirty(30)inches
above or below finished grade.These features
may be up to thirty(30)inches above and below
finished grade simultaneously. Improvements may
exceed thirty(30)inches below grade if necessary
for the structural integrity of the improvement."
RECEIVED
02/25/2022
ASPEN
BUILDING DEPARTMENT