Loading...
HomeMy WebLinkAboutFile Documents.617 W Bleeker St.0062-2019-BRES (32)Residence 617 West Bleeker Street Aspen, Colorado Temporary Micropile Wall* for Excavation Shoring Grade-1. Temporary Micropile Wall - Cover Grade-2. Temporary Micropile Wall - Location Grade-3. Temporary Micropile Wall - Profile Grade-4. Temporary Micropile Wall - General Notes Grade-5. Temporary Micropile Wall - Sections Grade-6. Temporary Micropile Wall - Typical Sections and Details * These plans and specifications are designed to provide temporary excavation support with a finite design life during construction operations. Long-term earth pressure loads shall be included in the structural design. Temporary Micropile Wall Cover November 12, 2019 Residence 617 West Bleeker Street 266 Red Cliff Circle Glenwood Springs, CO 81601 Phone: (970) 230-9208 19-050G-D1 Grade-1 of 6 RDJ Project Number: Date:Sheet Number:Prepared by:Project: Set Revisions Date Revision/Issue Prepared by B&Y Drilling, Inc. Designed For: Sheet Grade-2 RDJ01.23.20 Seal: Sheets Grade-2, 3 and 5 RDJ05.07.20 06/22/2020 Reviewed by Engineering 06/26/2020 8:35:22 AM "It should be known that this review shall not relieve the applicant of their responsibility to comply with the requirements of the City of Aspen. The review and approval by the City is offered only to assist the applicant's understanding of the applicable Engineering requirements." The issuance of a permit based on construction documents and other data shall not prevent the City of Aspen from requiring the correction of errors in the construction documents and other data. Main Wall Begin Wall Main Wall Turn Line 1 Main Wall Turn Line 2 Main Wall Turn Line 3 Main Wall Turn Line 4 Main Wall Turn Lines 5 and 6 Main Wall End Wall Proposed Micropile Cap Location (Main Wall) 0+20 0+40 0+60 0+80 1+ 0 0 1+ 2 0 1+ 4 0 1+60 1+80 2+00 2+20 0+50 GRADE-5 1+ 1 0 GR A D E - 5 1+70 GRADE-5 2+10 GRADE-5 3.7' 3.1' 3.0' Heavy loads shall not be placed between micropile wall and this line (Sheet Grade-4, Note 3.4) Top of Temporary Slope at 1.5H:1V Top of Temporary Slope at 1.5H:1V Drywell Wall Begin Wall Drywell Wall Turn Line 1 Drywell Wall End Wall 0+ 1 0 GR A D E - 5 Proposed Micropile Cap Location (Drywell Wall) Temporary Micropile Wall Location November 12, 2019 Residence 617 West Bleeker Street 19-050G-D1 Grade-2 of 6 RDJ Project Number: Date:Sheet Number:Prepared by:Project: Sheet Revisions Date Revision/Issue Prepared by B&Y Drilling, Inc. Designed For: Added temporary excavation limits RDJ01.23.20 Seal: N SCALE: 1" = 8' 8 0 4 8 Notes: 1. Base plan by Roaring Fork Engineering dated 09-26-2019. 2. For utility installation, trench to back of micropile wall. Hand dig between micropiles and extend utilities through wall. 266 Red Cliff Circle Glenwood Springs, CO 81601 Phone: (970) 230-9208 06/22/2020 Reviewed by Engineering 06/26/2020 8:35:22 AM "It should be known that this review shall not relieve the applicant of their responsibility to comply with the requirements of the City of Aspen. The review and approval by the City is offered only to assist the applicant's understanding of the applicable Engineering requirements." The issuance of a permit based on construction documents and other data shall not prevent the City of Aspen from requiring the correction of errors in the construction documents and other data. El e v a t i o n ( f e e t ) 7920 7910 7900 7890 7880 7920 7930 7910 7900 7890 El e v a t i o n ( f e e t ) 7880 7930 0+ 0 0 . 0 B e g i n W a l l Sy s t e m 1 EG = 7 9 2 4 . 0 TO W = 7 9 2 2 . 0 BO E = 7 9 2 1 . 0 0+ 5 0 1+ 0 0 1+ 5 0 Bottom of Excavation (BOE) 0+ 1 6 . 0 C h a n g e S y s t e m Sy s t e m 1 t o 2 EG = 7 9 2 3 . 2 TO W = 7 9 2 1 . 2 BO E = 7 9 0 8 . 8 0+ 2 1 . 0 T u r n L i n e 1 Sy s t e m 2 EG = 7 9 2 3 . 0 TO W = 7 9 2 1 . 0 BO E = 7 9 0 5 . 0 0+ 4 3 . 0 T u r n L i n e 2 Sy s t e m 2 EG = 7 9 2 2 . 0 TO W = 7 9 2 0 . 0 BO E = 7 9 0 5 . 0 0+ 8 4 . 0 T u r n L i n e 3 Sy s t e m 2 EG = 7 9 2 1 . 0 TO W = 7 9 1 9 . 0 BO E = 7 9 0 5 . 0 1+ 5 0 . 5 T u r n L i n e 4 Ch a n g e S y s t e m 2 t o 3 EG = 7 9 2 2 . 0 TO W = 7 9 2 0 . 0 BO E = 7 9 0 5 . 0 1+ 8 7 . 2 T u r n L i n e 5 Ch a n g e S y s t e m 3 t o 2 EG = 7 9 2 3 . 0 TO W = 7 9 2 1 . 0 BO E = 7 9 0 5 . 0 1+ 9 2 . 2 T u r n L i n e 6 Sy s t e m 2 EG = 7 9 2 3 . 0 TO W = 7 9 2 1 . 0 BO E = 7 9 0 5 . 0 2+ 1 6 . 0 C h a n g e S y s t e m Sy s t e m 2 EG = 7 9 2 3 . 0 TO W = 7 9 2 1 . 0 BO E = 7 9 0 8 . 0 2+ 0 0 2+ 3 4 . 2 E n d W a l l Sy s t e m 2 EG = 7 9 2 5 . 0 TO W = 7 9 2 3 . 0 BO E = 7 9 2 2 . 0 Existing Grade Micropile Wall CapTemporary Slope at 1.5H:1V Temporary Slope at 1.5H:1V El e v a t i o n ( f e e t ) 7920 7910 7900 7890 7880 7920 7930 7910 7900 7890 El e v a t i o n ( f e e t ) 7880 7930 0+ 0 0 . 0 B e g i n W a l l Sy s t e m 3 EG = 7 9 2 3 . 0 TO W = 7 9 2 1 . 0 BO E = 7 9 0 5 . 0 0+ 1 9 . 0 T u r n L i n e 1 Sy s t e m 3 EG = 7 9 2 3 . 0 TO W = 7 9 2 1 . 0 BO E = 7 9 0 5 . 0 0+ 2 5 . 0 C h a n g e S y s t e m Sy s t e m 3 t o 1 PG = 7 9 1 7 . 0 TO W = 7 9 1 5 . 0 BO E = 7 9 0 5 . 0 0+ 3 3 . 0 E n d W a l l Sy s t e m 1 PG = 7 9 1 3 . 0 TO W = 7 9 1 1 . 0 BO E = 7 9 0 5 . 0 MAIN WALL DRYWELL WALL Temporary Micropile Wall Profile November 12, 2019 Residence 617 West Bleeker Street 19-050G-D1 Grade-3 of 6 RDJ Project Number: Date:Sheet Number:Prepared by:Project: Sheet Revisions Date Revision/Issue Prepared by B&Y Drilling, Inc. Designed For:Seal: Extended Main Wall by 2 ft. and added Drywell Wall RDJ05.07.20 266 Red Cliff Circle Glenwood Springs, CO 81601 Phone: (970) 230-9208 SCALE: HORIZONTAL 1" = 10' VERTICAL 1" = 10' ABBREVIATIONS: EG - Existing Grade PG - Proposed Grade TOW - Top of Wall BOE - Bottom of Excavation 06/22/2020 Reviewed by Engineering 06/26/2020 8:35:22 AM "It should be known that this review shall not relieve the applicant of their responsibility to comply with the requirements of the City of Aspen. The review and approval by the City is offered only to assist the applicant's understanding of the applicable Engineering requirements." The issuance of a permit based on construction documents and other data shall not prevent the City of Aspen from requiring the correction of errors in the construction documents and other data. 1.0 Temporary Micropile Wall Materials 1.1 Micropile bars - Williams T30S Injection Bars or equivalent (Battered Piles - Systems 1 and 2) -Williams T40N Injection Bars or equivalent (Vertical Piles - Systems 1 and 2) - Williams T52N Injection Bars or equivalent (System 3) fy=85,000 psi 1.2 Grout - Grout may be neat-cement or with sand, with Type II cement in accordance with ASTM C150. Water-cement ratio should be between 0.4 and 0.6. f'c=3,000 psi (28-day strength) 1.3 End hardware - Nuts shall be in accordance with manufacturer's recommendations. Bearing plate shall be in accordance with ASTM A36, Grade 36. 1.4 Concrete - Concrete mix shall consist of Type II cement in accordance with ASTM C150, potable water and normal weight aggregate in accordance with ASTM C33. Air entrainment is not required. Admixtures, if used, should be non-corrosive to steel. f'c=3,000 psi (28-day strength) 1.5 Cap reinforcement shall be in accordance with ASTM A615. fy=60,000 psi 2.0 Temporary Micropile Wall Construction Sequence 2.1 Install micropiles at the locations and to the lengths shown on the plans. Micropile injection bars shall be installed per manufacturers recommendations. Micropile locations may vary by up to 3". 2.2 Install end hardware and waler bars as shown on the drawings. 2.3 Pour concrete cap to the minimum thickness shown on the drawings and to attain the minimum coverages specified herein. Cold weather protection measures may be necessary. 2.4 After concrete and grout has attained 80% of specified strength, complete excavation to full depth of wall not to exceed maximum wall heights as shown on the drawings. Excavation shall extend to grout/micropile columns (cap may be undermined). Soil should not be left between excavation face and grout/micropile columns. 3.0 Temporary Micropile Wall Design Parameters 3.1 The micropile shoring was designed in general accordance with procedures contained in the FHWA "Micropile Design and Construction Reference Manual", Publication No. FHWA NHI-05-039, December 2005. 3.2 The following strength parameters were assumed for the subsoils based on the "Subsoil Study for Foundation Design, Proposed Residence, 617 West Bleeker Street, Aspen, Colorado" by HP-Kumar, Project No. 19-7-550, report dated October 17, 2019. The following values were assumed for soil design parameters: f g (deg) (psf) (pcf) Sand and Gravel 36 100 130 An experienced geotechnical engineer should verify the above design parameters during construction. 3.3 Global Factor of Safety = 1.3 min. 3.4 Surcharge Loading - The excavation shoring systems are designed to accommodate normal vehicular traffic and construction surcharge of material and light trucks, not heavy loads such as cranes (wheels or outriggers), concrete pumpers (wheels or outriggers) or large stockpiles that apply a ground pressure of 1,000 psf or greater. Heavy loads shall not be placed within 8 feet of micropile cap unless approved by RJ Engineering. 3.5 No groundwater table was assumed. If groundwater is encountered during excavation, the excavation shall not continue and the site shall be dewatered to below the base of planned excavation elevation prior to completion of the excavation. 3.6 The micropile walls lateral deflection may be up to about 0.003' per foot of excavation depth at the ROW, and no adverse deflection of the ground surface at the private property line based on anticipated subsurface conditions. 4.0 Special Provisions 4.1 Wall geometry used in design was based on plans provided by the client. 4.2 This design is valid only for B&Y Drilling, Inc. at the subject site. 4.3 Excavation shall extend to micropile columns. During the excavation process, material should not be left between the excavation face and the grout/micropile column. 4.4 The micropile wall designs are valid only for dry surface and subsurface conditions. If surface water or groundwater is encountered during excavation or installation, RJ Engineering should be notified immediately and the wall may be redesigned at the discretion of RJ Engineering. Surface and subsurface drainage from adjacent properties should not be discharged at the top or through the micropile wall. Saturated soils may result in materials piping out from between micropiles resulting in failure and/or excessive wall movements. 4.5 The design life on this micropile wall is 12 weeks. Design life is defined by the beginning of excavation to the construction of the foundation wall. If the duration of the project exceeds the 12 week duration, RJ Engineering shall be contacted to evaluate the performance of the system and determine if the design life can be extended. 4.6 RJ Engineering is not responsible for maintaining slope stability above and below the micropile wall during construction. 4.7 There appears to be no known utility conflicts with installation of the micropile walls. Utility locations presented shall be field verified prior to micropile wall installation. 4.8 RJ Engineering is not responsible for quality control, quality assurance, changed conditions or problems resulting from improper construction techniques. 4.9 RJ Engineering is not responsible for construction site safety. 4.10 RJ Engineering is not responsible for wall layout in the field. General contractor or representative of the general contractor is responsible for micropile wall layout. Temporary Micropile Wall General Notes November 12, 2019 Residence 617 West Bleeker Street 19-050G-D1 Grade-4 of 6 RDJ Project Number: Date:Sheet Number:Prepared by:Project: Sheet Revisions Date Revision/Issue Prepared by B&Y Drilling, Inc. Designed For:Seal: 266 Red Cliff Circle Glenwood Springs, CO 81601 Phone: (970) 230-9208 06/22/2020 Reviewed by Engineering 06/26/2020 8:35:22 AM "It should be known that this review shall not relieve the applicant of their responsibility to comply with the requirements of the City of Aspen. The review and approval by the City is offered only to assist the applicant's understanding of the applicable Engineering requirements." The issuance of a permit based on construction documents and other data shall not prevent the City of Aspen from requiring the correction of errors in the construction documents and other data. WEST SIDE MAIN WALL System 2 Station 0+50 NORTH SIDE MAIN WALL System 2 Station 1+10 EAST SIDE MAIN WALL System 3 Station 1+70 EAST SIDE MAIN WALL System 2 Station 2+10 SOUTH SIDE DRYWELL WALL System 3 Station 0+10 Temporary Micropile Wall Sections November 12, 2019 Residence 617 West Bleeker Street 19-050G-D1 Grade-5 of 6 RDJ Project Number: Date:Sheet Number:Prepared by:Project: Sheet Revisions Date Revision/Issue Prepared by B&Y Drilling, Inc. Designed For: Added section for Drywell Wall RDJ05.07.20 Seal: Notes: 1. Micropiles are planned outside of property lines on the east and west sides. Permission shall be obtained prior to installation on adjacent properties.266 Red Cliff Circle Glenwood Springs, CO 81601 Phone: (970) 230-9208 SCALE: HORIZONTAL 1" = 10' VERTICAL 1" = 10' ABBREVIATIONS EG - Existing Grade PG - Proposed Grade TOW - Top of Wall BOE - Bottom of Excavation 06/22/2020 Reviewed by Engineering 06/26/2020 8:35:22 AM "It should be known that this review shall not relieve the applicant of their responsibility to comply with the requirements of the City of Aspen. The review and approval by the City is offered only to assist the applicant's understanding of the applicable Engineering requirements." The issuance of a permit based on construction documents and other data shall not prevent the City of Aspen from requiring the correction of errors in the construction documents and other data. Cross Bar, 24" OC Vertical Pile MICROPILE CAP PLAN VIEW VERTICAL SYSTEM SYSTEM 3 MICROPILE CAP CROSS SECTION VERTICAL SYSTEM SYSTEM 3 12" 18" Cross Bar, #4 Rebar Continuous Waler, #4 Rebar 3" 2" min. 3,000 psi Concrete Grout Vertical Pile Continuous Waler, #4 Rebar Notes: Vertical piles 12" center to center with back row at 12" offset 12" 12" Continuous Waler, #4 Rebar Continuous Waler, #4 Rebar Cross bar, 36" OC Continuous waler, #4 rebar Vertical pile 12" 18" 36" Cross bar, #4 Rebar Continuous Waler, #4 Rebar 3" 2" min. 3,000 psi Concrete Grout Continuous Waler, #4 Rebar Battered pile Battered pile Vertical pile 18" 18" Continuous waler, #4 rebar 36" Notes: Vertical pile 18" center to center Battered pile 36" center to center MICROPILE CAP PLAN VIEW BATTERED SYSTEM SYSTEMS 1 AND 2 MICROPILE CAP CROSS SECTION BATTERED SYSTEM SYSTEMS 1 AND 2 TYPICAL SECTION SYSTEM 3 18.0' MAX CUT RL = 3 0 f t . Design Height (DH) 18 ft. max. Temporary Slope 2.0 ft. max. Exposed Height Varies Proposed Excavation Bottom of Excavation (BOE) (See Sheet Grade-3) Williams B7X1-51 Injection Bar Existing Grade Temporary Excavation Slope at 1.5H:1V Micropile Cap See Details Top of Cap/Wall El. (See Sheet Grade-3) TYPICAL SECTION SYSTEM 1 15.0' MAX. CUT Existing Grade Top of Cap/Wall El. (See Sheet Grade-3)Micropile Cap See Details Design Height (DH) 15.0 ft. max. Varies Varies 2.0 ft. max. Proposed Temporary Excavation at 1.5H:1V Proposed Excavation RL = 2 0 f t . R L = 1 5 f t . Williams T30S Injection Bar Williams T40N Injection Bar 5' - 8" Bottom of Excavation El. (See Sheet Grade-3) 20° MICROPILE BEARING PLATE FRONT VIEW 6" Micropile Hole Diameter = Bar Diameter +1/4" 6" 1/2" Min MICROPILE BEARING PLATE SIDE VIEW Hex Nut Bearing Plate MICROPILE DETAIL BAR DRY WELL WALL Grout A'A Williams Injection Bar 6" Min 9" Column Injection Bar Field Installed Grout MICROPILE CROSS SECTION A-A' Borehole TYPICAL SECTION SYSTEM 2 18.0' MAX CUT Existing Grade Top of Cap/Wall El. (See Sheet Grade-3)Micropile Cap See Details Design Height (DH) 15.0 ft. max. Varies Varies 2.0 ft. max. Proposed Temporary Excavation at 1.5H:1V Proposed Excavation RL = 3 0 f t . R L = 2 0 f t . Williams T30S Injection Bar Williams T40N Injection Bar 7' - 5" Bottom of Excavation El. (See Sheet Grade-3) 20° Temporary Micropile Wall Typical Sections and Details November 12, 2019 Residence 617 West Bleeker Street 19-050G-D1 Grade-6 of 6 RDJ Project Number: Date:Sheet Number:Prepared by:Project: Sheet Revisions Date Revision/Issue Prepared by B&Y Drilling, Inc. Designed For:Seal: NOT TO SCALE Abbreviations: RL - Reinforcement Length DH - Design Height 266 Red Cliff Circle Glenwood Springs, CO 81601 Phone: (970) 230-9208 NOTES: 1. See Sheet Grade-3 for top of wall/cap and bottom of excavation elevations. 06/22/2020 Reviewed by Engineering 06/26/2020 8:35:22 AM "It should be known that this review shall not relieve the applicant of their responsibility to comply with the requirements of the City of Aspen. The review and approval by the City is offered only to assist the applicant's understanding of the applicable Engineering requirements." The issuance of a permit based on construction documents and other data shall not prevent the City of Aspen from requiring the correction of errors in the construction documents and other data.