Loading...
HomeMy WebLinkAboutFile Documents.1427 Crystal Lake Rd.0057-2021-BCHO (4) ‘11L l r CITY OF ASPEN SPECIAL INSPECTION AND TESTING AGREEMENT This form is required for projects needing special inspection and/or testing per Chapter 17 of the International Building Code(IBC). W Project Address: Lk.X7 U cR. •aYp PA Permit Number:0 t 40 -a b4(--) 13 R GC') BEFORE A PERMIT CAN BE ISSUED:The owner,or the design professional in responsible charge,acting as the owner's agent,shall complete two copies of this agreement and the attached Special-inspection and Testing Schedule,including the required acknowledgments.A pre-construction conference with the parties involved may be required to review the special-inspection requirements and procedures. APPROVAL OF SPECIAL INSPECTORS: Special inspectors may have no financial interest in the projects for which they provide special inspections. Special inspectors shall be approved by the building department prior to performing any duties. Special inspectors shall submit their qualifications and are subject to personal interviews for pre-qualification. Special inspectors shall display approved identification,as stipulated by the building official, when performing the function of special inspector. Special inspection and testing shall meet the minimum requirements of the International Building Code Section 1704.The following conditions are also applicable: A. Special Inspector Responsibilities: 1. Signify presence at job site.Special inspectors should notify contractor personnel of their presence and responsibilities at the job site.If required by the building official,they shall sign in on the appropriate form posted with the building permit. 2. Observe assigned work.The special inspector shall observe assigned work for conformance with the building department approved(stamped)design drawings,specifications,and applicable workmanship provisions of the International Building Code.Architect\engineer-reviewed shop drawings may be used only as an aid to inspection. For continuous special-inspection,the special inspector shall be on site at all times observing the work requiring special inspection.Periodic inspections,if any,must have prior approval based on a separate written plan reviewed and approved by the building department and the engineer or architect of record. 3. Report nonconforming items.The special inspector shall bring nonconforming items to the immediate attention of the contractor and note all such items in the daily report.If any item is not resolved in a timely manner or is about to be incorporated in the work,the special inspector shall immediately notify the building department by telephone or in person,notify the engineer or architect,and post a discrepancy notice. 4. Provide timely reports.The special inspector shall complete written inspection reports for each inspection visit and provide the reports on a timely basis determined by the building official.The special inspector or inspection agency shall furnish these reports directly to the building official, engineer or architect of record,and others as designated. [IBC Sec. 1704.1.2]These reports should be organized on a daily format and may be submitted weekly at the option of the building official. These reports should include: a. Description of daily inspections and tests made with applicable locations, b. Listing of nonconforming items, c. Report on how nonconforming items were resolved or unresolved as applicable, d. Itemized changes authorized by the architect,engineer,and building official if not included in nonconforming items 5. Provide Final Inspection Report.The special inspector shall submit a written final report documenting required special inspections and correction of any discrepancies noted in the inspections prior to the final building inspection. RECEIVE D 04/18/2022 ASPEN BUILDING DEPARTMENT B. Owner Responsibilities: 1. The project owner,the design professional in responsible charge,or an agent of the owner is responsible for employing special-inspection services.The special inspector/agency shall not be in the employ of the contractor,subcontractor or material supplier. [IBC Sec 1704.1]In case of an owner/contractor,the special inspector\agency shall be employed as specified by the building official. C. Design Professional in Responsible Charge Responsibilities: Design Professional in Responsible Charge definition:An individual who is registered or licensed to practice their respective design profession as defined by the statutory requirements of the professional registration laws of the state or jurisdiction in which the project is to be constructed;who is engaged by the owner to review and coordinate certain aspects of the project,as determined by the building official,for compatibility with the design of the building or structure. 1. Prepare statement of special inspections.The registered design professional in responsible charge shall prepare a statement of special inspections in accordance with IBC Section 1705 for submittal by the applicant.The statement of special inspections shall identify the following: a. The materials,systems,components and work required to have special inspection or testing by the building official or by the registered design professional responsible for each portion of the work. b. The type and extent of each special inspection. c. The type and extent of each test. d. For each type of special inspection, identification as to whether it will be continuous special inspection or periodic special inspection. D. Contractor Responsibilities: 1. Notify the special inspector.The contractor is responsible for notifying the special inspector or agency regarding individual inspections for items listed on the attached schedule and as noted on the building department approved plans. Adequate notice shall be provided so the special inspector has time to become familiar with the project. 2. Provide access to approved plans.The contractor is responsible for providing the special inspector access to approved plans. 3. Retain special inspection records.Upon request,the contractor is also responsible for retaining, at the job site,all special inspection records completed by the special inspector. E. Inspection of Fabricators: 1. Fabrication of structural assemblies and members.Where fabrication of structural load-bearing members and assemblies is being performed on the premises of a fabricator's shop,IBC Section 1704.2 shall require special inspection of the fabricated items. 2. Fabrication and implementation procedures.The special inspector shall verify that the fabricator maintains detailed fabrication and quality control procedures that provide a basis for inspection control of the workmanship and the fabricator's ability to conform to approved construction documents and reference standards.The special inspector shall review the procedures for completeness and adequacy relative to code requirements for fabricator's scope of work. F. Approved Fabricator Responsibilities: 1. Fabrication exempt inspections.Special inspections are not required where work is done on the premise of a fabricator registered and approved to perform such work without special inspection. If work is done on site that requires special inspection,special inspection will be required. 2. Approval of fabricator.Approval shall be based upon review of the fabricator's written procedural and quality control manuals and periodic auditing of fabrication practices by an approved special inspection agency. 3. Completion of fabrication.Upon completion of fabrication, the approved fabricator shall submit certificate of compliance to the building official stating that the work was performed in accordance with the approved construction documents. RECEIVE') 04/18/2022 ASPEN BUILDING DEPARTMENT G. %Ming Department Responsibilities: 1. Approve pregrem The building department shall appiove all special inspectors and special-inspection rcquirenxmts. 2. Iafore:e apedal Inspection.Work requiring special inspection and the building inspector Ball monitor the performance of special bupectors.PGulHer approval,in addition to that of the special Inspector.must be obtained prior to placement of concrete,covering of structural steel,or other similar materials. • 3. Review trapectlon reports.The building official should review special-inspection progress and final reports. 4. Perform final Inapadlan.The building official should pertbrm the final hpoctioo sad apyawa1 for a project[IBC Sec.1093.1]after the final spec ial-inspeotioe report has been reviewed and Protect Address: 1�71.i '(,( ipti Lake..24 Perk Marker: OlL(O A OWLU)GI�V'1Y1_� i►t, 0.7-1"mc.:°' withtheoondkionsofEris \1 M�pt,e (' 3� zz ea ® cl I�Y1orvApSofl o Co dy? S SPoaialIrsQection �4UiP.lMlal� r Dime Email Cni-7)1rY) • , . .I,..,, PastiAltillia I21.24a1 M, .1;14411:42sle.com •'• ' Printed Name Date Email Deli in S.:•••.••• - Printed Name Date Email W,C. a1 n r R _ • • 1It,�loo� 2-01eto 06114C°QtM1 me�o�pb. Contractor - Si Printed Name Date Email arlir1/4 Appry eel Signature Printed Name Date Email Fabricator". lratpeeted Signature Printed Name Date Email Fabricator*" ty of Aspen Building Department Signature Printed Name Date Email Ma•r the Owner et the 1 Jp Frofaeaioaal Is Ampaou•b.Cusp pin most sign "T sDotps ProlbrtmW is ltapeotbia amp Is sat mailed a sign if rbcy ptrtbne an&tics sa&scribal is ins C thew ""C,/nr Ilan Appealed Pirloaar ar lorpsoael Prbrieator rat eisa.ft alt wort b pt rtbnral le tie asap are Approred Fsbrioetor',t.*QeoW iaeleo6re A/rape aware I not Waked fro bald whit). Iwr sews .0 AnPeM�:f�d¢' 'nt,I r. Vp70;i0,9x:o I r,910 vzr'r.517 i I.:rye: RECEIVED 04/18/2022 ASPEN BUILDING DEPARTMENT